40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 187 of 357
Not logged in
List
|
Find
|
Login
|
Help
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
17829 Entries
Goto page
Previous
1
,
2
,
3
...
186
, 187,
188
...
355
,
356
,
357
Next
Fri Oct 29 14:06:12 2010, kiwamu, Update, Green Locking, Re: 80MHz VCO for green PLL : VCO calibration
Wed Nov 3 02:37:39 2010, yuta, Summary, Green Locking, coarse locked green beat frequency
Wed Nov 3 03:00:47 2010, Koji, Summary, Green Locking, coarse locked green beat frequency
Mon Nov 8 10:48:58 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good
Mon Nov 8 16:03:46 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good
Thu Nov 11 13:54:05 2010, kiwamu, Update, Green Locking, 80MHz VCO : about PLL hold-in range
Thu Nov 11 17:47:36 2010, kiwamu, Update, Green Locking, 80MHz VCO : improve PLL hold-in range and put a boost
Fri Nov 12 12:06:11 2010, Aidan, Configuration, Green Locking, PID script working - now it needs to be tuned
Mon Nov 15 11:52:22 2010, kiwamu, Update, Green Locking, PLL with real green signal
Mon Nov 15 17:10:59 2010, kiwamu, Update, Green Locking, PLL with real green signal
Tue Nov 16 09:02:54 2010, Aidan, Update, Green Locking, PID loop - calibration of SR620 output
Tue Nov 16 10:47:45 2010, Aidan, Update, Green Locking, Rebooted c1psl - added new GRNBEAT_FREQ channel
Tue Nov 16 12:47:30 2010, Aidan, Update, Green Locking, PID loop but no green
Tue Nov 16 16:00:26 2010, Aidan, Update, Green Locking, PID loop but no green
Mon Nov 22 20:31:58 2010, kiwamu, Update, Green Locking, searching for unknown loss in green PD path
Tue Nov 23 01:45:47 2010, kiwamu, Update, Green Locking, noise curve of wideband RFPD
Fri Dec 3 05:21:11 2010, kiwamu, Update, Green Locking, locked the laser to the cavity
Mon Dec 6 22:18:39 2010, kiwamu, Update, Green Locking, aligned the beam axis
Thu Dec 23 12:19:43 2010, kiwamu, Update, Green Locking, installed doubling oven base at PSL table
Thu Dec 23 18:51:37 2010, rana, Update, Green Locking, installed doubling oven base at PSL table
Fri Jan 7 00:49:16 2011, Jenne, Update, Green Locking, Recovered Xarm Green Lock, Preparation for Beat Note Measurement
Fri Jan 14 20:37:00 2011, kiwamu, HowTo, Green Locking, plan for this month
Thu Jan 20 04:43:28 2011, kiwamu, Update, Green Locking, status update: PLL connected to ADC
Thu Jan 20 15:15:39 2011, kiwamu, Update, Green Locking, status update: PLL connected to ADC
Fri Jan 21 02:45:43 2011, kiwamu, Update, Green Locking, interface for PLL to ADC
Sat Jan 22 01:56:04 2011, Suresh, Update, Green Locking, Examining the stability of VCO PLL at low frequencies
Sat Jan 22 02:03:55 2011, Koji, Update, Green Locking, Examining the stability of VCO PLL at low frequencies
Sat Jan 22 02:11:09 2011, kiwamu, Update, Green Locking, some more progress
Sat Jan 22 02:23:26 2011, Koji, Update, Green Locking, some more progress
Mon Jan 24 02:58:46 2011, kiwamu, Update, Green Locking, X arm locked !
Mon Jan 24 09:33:08 2011, rana, Update, Green Locking, X arm locked !
Mon Jan 24 10:19:21 2011, Koji, Update, Green Locking, X arm locked !
Mon Jan 24 13:08:07 2011, kiwamu, Update, Green Locking, Re: X arm locked !
Mon Jan 24 14:27:13 2011, kiwamu, Update, Green Locking, Re: X arm locked !
Tue Jan 25 05:26:51 2011, kiwamu, Update, Green Locking, cavity scan
Tue Jan 25 06:48:55 2011, kiwamu, Update, Green Locking, To do list
Tue Jan 25 20:42:46 2011, Osamu, Update, Green Locking, Slow servo for green laser
Tue Jan 25 21:57:59 2011, Koji, Update, Green Locking, Slow servo for green laser
Wed Jan 26 10:11:47 2011, Aidan, Update, Green Locking, cavity scan
Thu Jan 27 11:04:27 2011, Koji, Update, Green Locking, beat freq scan
Thu Jan 27 17:12:02 2011, Aidan, Joe, Summary, Green Locking, Digital Frequency to Amplitude converter
Thu Jan 27 21:43:37 2011, Koji, Update, Green Locking, no transmission of ALS signals
Thu Jan 27 23:21:50 2011, rana, Summary, Green Locking, Digital Frequency Discriminator
Fri Jan 28 09:03:38 2011, Aidan, Summary, Green Locking, Digital Frequency Discriminator
Fri Jan 28 10:27:46 2011, Aidan, Joe, Summary, Green Locking, Digital Frequency Discriminator - calibration
Fri Jan 28 11:08:44 2011, josephb, Update, Green Locking, no transmission of ALS signals
Sun Jan 30 17:15:09 2011, Aidan, Summary, Green Locking, Digital Frequency discriminator - frequency noise
Sun Jan 30 19:26:03 2011, Koji, Summary, Green Locking, Prototype freq divider
Mon Jan 31 07:03:59 2011, Aidan, Summary, Green Locking, DFD - noise spectra
Mon Jan 31 07:41:23 2011, Aidan, Update, Green Locking, DFD - medm screen
Goto page
Previous
1
,
2
,
3
...
186
, 187,
188
...
355
,
356
,
357
Next
ELOG V3.1.3-