  6144   Wed Dec 21 16:55:30 2011 kiwamuUpdateGreen LockingPower Recycled Single Arm I did some brief parameter checks
for the power-recycled single arm which I
have done yesterday.
The
  
  6145   Thu Dec 22 19:15:22 2011 kiwamuUpdateGreen Lockingrearrangement of PSL green optics As
planed (#6143
  
  6147   Fri Dec 23 01:07:41 2011 kiwamuUpdateGreen Lockingrearrangement of PSL green optics part IIAfter
I did a fine alignment of the X green beam
path on the PSL table, the X arm beat-note
 newLayout.png 
  6154   Wed Dec 28 14:13:16 2011 kiwamuUpdateGreen LockingALS feedback on MC2I
added an ALS feedback path on the MC2 suspension
and this path will enable us to stabilise
 MC2_ALS.png 
  6155   Fri Dec 30 02:16:48 2011 kiwamuUpdateGreen LockingYarm ALS : high frequency noise reducedThe
high frequency noise, which has been a dominant
noise above 30 Hz in the Y arm ALS (
 Yarm_ALS_2011Dec29.png 
  6214   Fri Jan 20 15:59:02 2012 kiwamuUpdateGreen LockingY arm ALS noige budgetOne of
my goals in this week is : measurement of
 Yarm_ALS_2012Jan19.png 
  6215   Fri Jan 20 16:24:50 2012 kiwamuUpdateGreen LockingY arm ALS : time seriesHere is
a new time series plot showing how stably
 time_series.png 
  6216   Fri Jan 20 17:05:59 2012 ranaUpdateGreen LockingY arm ALS : time series      
           
  
  6220   Tue Jan 24 18:11:13 2012 kiwamuUpdateGreen LockingY arm ALS noise budgetI
did some more stuff for the Y arm ALS and
updated the noise budget:
 Yarm_ALS_2012Jan19.pngnewservo.png 
  6221   Wed Jan 25 02:59:46 2012 kiwamuUpdateGreen LockingY arm ALS noise budgetSurprisingly
increasing the gain of the whitening filter
didn't improve the noise curve.
  
  6223   Wed Jan 25 17:32:03 2012 steveUpdateGreen Lockinggeen pointing into y arm is misalignedI  placed an other Y2-LW-1-2050-UV-45P/AR
steering mirror into the beam path of the
green beam launching in order to avoid the
  
  6225   Thu Jan 26 06:09:52 2012 kiwamuUpdateGreen Lockingnoisy AS55During
the Y arm ALS I found that the noise of the
AS55 demod signal was worse than that of
 Yarm_ALS_2012Jan25.png 
  6227   Thu Jan 26 10:17:01 2012 steveUpdateGreen Lockinggeen pointing into y arm is realigned

    

       
            
 P1080513.JPG 
  6230   Fri Jan 27 05:21:43 2012 kiwamuUpdateGreen Lockingfine alignment of the Y end green setupI did a fine alignment on the Y end green
setup. The green light became able to be
locked again.
  
  6234   Fri Jan 27 16:55:28 2012 JenneUpdateGreen LockingY-green realignedThe Yarm green laser really wanted to lock
on a 01/10 mode, so Kiwamu suggested I go
inside and realign the green beam to the
  
  6299   Tue Feb 21 08:33:16 2012 steveUpdateGreen Lockingperiscope adapter plateTwo extender plates ready for cleaning.
The existing optical table tops have 38"
OD. Using two of these the OD will be 44"
 percplate.PDF 
  6301   Tue Feb 21 18:39:11 2012 kiwamuUpdateGreen LockingNew BBPDs installedTwo new BBPDs have been installed on
the PSL table.
The first one was installed by Koji
  
  6324   Mon Feb 27 14:35:37 2012 JenneUpdateGreen LockingPSL Beat SetupXarm is aligned for both IR and green. 
Here is a photo of the beam paths
of the PSL beat setup.  I want to make
 BeatPSLlayout_27Feb2012.png 
  6326   Mon Feb 27 18:35:45 2012 JenneUpdateGreen LockingX Beat SearchMeh.  I've searched in steps of 20
counts in C1:GCX-SLOW_SERVO2_OFFSET units
(16 bit +\- 10V DAC, and 1GHz/V coeffecient
  
  6342   Wed Feb 29 20:27:00 2012 JenneUpdateGreen LockingX green beat - found it!Found it!
The actual temperature of the Xend
  
  6371   Wed Mar 7 11:44:29 2012 JenneUpdateGreen LockingXgreen beatnote cable made, laidThe Xgreen PD now has a cable going over
to the beatbox. Once beatbox characterization
is done I can re-find the beat, and we can
  
  6395   Fri Mar 9 16:00:46 2012 steveUpdateGreen Lockinglaser emergency shut down switch replaced at the south endOver-sized local laser emergency switch
was held by large C clamp at the south end.
This was replaced by a smaller one and it
  
  6413   Wed Mar 14 10:06:26 2012 steveUpdateGreen Lockingdichroic mirror quotesDichroic
mirror quotes are in the wiki.
ATF is pricy.
  
  6435   Thu Mar 22 08:14:21 2012 steveUpdateGreen Lockingdichroic mirror quotes with large wedge

    

       
            
  
  6603   Fri May 4 17:46:46 2012 JenneUpdateGreen LockingPSL doubling oven back onWhile walking past the PSL, I noticed that
the PSL's doubling oven's heater was still
disabled from the power outage.  As
  
  6713   Wed May 30 01:35:15 2012 yutaUpdateGreen Lockingaligned Y arm green beam[Jenne, Yuta]
We aligned the Y arm for IR (C1:LSC-TRY_OUT
is now ~ 0.9), and aligned the green beam
  
  6724   Thu May 31 01:27:16 2012 yutaUpdateGreen LockingPSL and Y arm green beams aligned[Jenne, Yuta]
We aligned the PSL green optics so
that the PSL green beam and Y arm green beam
  
  6725   Thu May 31 01:36:17 2012 yutaUpdateGreen LockingGREEN_TRX/GREEN_TRY PDsI did the cabling for monitoring DC transmission
of the green beam from the end table.
The two PDs are called GREEN TRX and
  
  6731   Thu May 31 16:19:07 2012 yutaUpdateGreen Lockingtemperature setting for PSL doubling crystalI fixed the temperature control of the
oven for the PSL doubling crystal.
The PID settings were not good, and
  
  6732   Thu May 31 16:54:12 2012 JenneUpdateGreen LockingLinks to old elogs for green beatnote laser tempsBecause I keep taking a long time to search
for these, since I can't remember the keywords
in the different entries, here are the links:
  
  6736   Fri Jun 1 02:13:00 2012 JenneUpdateGreen LockingAttempt at Ygreen beat - failed[Yuta, Jenne]
We tried to find the Ygreen beat
note, with no success yet.  We calculate
  
  6746   Sat Jun 2 03:19:37 2012 yutaUpdateGreen LockingY green beat note found? - too smallSummary:
  I tried to find Y arm green
beat in order to do the mode scan.
 CIMG1437.JPG 
  6750   Mon Jun 4 23:48:43 2012 jenneUpdateGreen Lockinglowered gainWe're trying to do a yarm measurement....before
I forget, I want to write this down...
I changed the gain of each of the
  
  6751   Tue Jun 5 00:49:28 2012 JenneUpdateGreen LockingNightly update[Yuta, Jenne]
Vaguely chronological order:
Found a beat peak, thought it was
  
  6758   Tue Jun 5 22:03:22 2012 JenneOmnistructureGreen LockingIR beat signal at PSLYuta is going to bring this up at the 40m
meeting so it can be argued over, but we
(I) want a permanent IR beat setup at
  
  6763   Wed Jun 6 02:28:02 2012 yutaUpdateGreen Lockingtried to see Yarm length change with weak beat note[Jenne, Yuta]

Summary:
 beatycoarseringdown20120605.pngbeatysetup20120605.png 
  6771   Wed Jun 6 21:11:45 2012 yutaUpdateGreen Lockingimproved Y arm green alignmentSummary:
  Y arm green transmission to
the PSL table improved from ~ 20 uW to 61
 beatygreenpower20120606.png 
  6775   Thu Jun 7 01:46:05 2012 yutaSummaryGreen LockingY green beat - found it!!I found the big big Y green beat. Details
will be posted later.
 CIMG1504.JPG 
  6776   Thu Jun 7 02:25:27 2012 yutaUpdateGreen Lockingimproved Y arm green alignment - even more[Koji, Yuta]

Summary:
 beatygreenpower20120607.png 
  6777   Thu Jun 7 02:59:31 2012 yutaUpdateGreen LockingY green beat - found it!!Summary:
  I found the big green beat
note for the Y arm. The alignment of the
  
  6779   Thu Jun 7 05:39:41 2012 yutaUpdateGreen Lockingcoarsely stabilized Y arm length with ALSI coarsely stabilized Y arm length to off
resonance point for IR using ALS.
Currently, ASL servo loop is unstable
 MyFirstALS20120607.png 
  6780   Thu Jun 7 07:27:27 2012 KojiUpdateGreen Lockingimproved Y arm green alignment - even moreYes.
The end PDH servo should be checked more
carefully.
 freq_noise_AUX.pdf 
  6789   Fri Jun 8 15:08:27 2012 yutaUpdateGreen Lockingaligned/mode-matched Y green beat setupLaser temperature settings for Y arm green
work today are;
  
  6794   Mon Jun 11 21:50:08 2012 yutaUpdateGreen Lockingbeatbox looks OKSummary:
  We need I-Q frequency deiscriminator
to control the arm length fine and continuously.
 CIMG1522.JPG 
  6798   Tue Jun 12 01:58:33 2012 yutaUpdateGreen Lockingaligned Y arm to Y end green[Jenne, Yuta]

We aligned Y arm to the Y end green
  
  6802   Tue Jun 12 11:54:50 2012 JenneUpdateGreen Lockingc1gcv recompiledYuta added channels so we can get the Q
phase of all the beat PDs to the c1gcv model. 
I showed him how to recompile/install/start.
 c1gcv20120612.png 
  6808   Tue Jun 12 20:35:46 2012 yutaUpdateGreen Lockingc1gcv recompiled[Jamie, Yuta]

We recompiled c1gcv because the order
 c1gcv20120612-2.png 
  6809   Tue Jun 12 23:18:18 2012 yutaUpdateGreen LockingI-Q signals for the beat[Mengyao, Yuta]

 FINEIQplot20120612.pngCOARSEIQplot20120612.pngbeatysetup20120612.png 
  6810   Wed Jun 13 02:11:59 2012 yutaUpdateGreen Lockingmy first modescan (sort of)I stabilized Y arm length by using only
I phase coarse signal from the beat(C1:ALS-BEATY_COARSE_I_ERR).
I sweeped the arm length by injecting
 modescan20120612_1.png 
  6811   Wed Jun 13 02:24:02 2012 ranaUpdateGreen Lockingmy first modescan (sort of) That sounds goofy.
With the delay line technique,
you can get a linear signal over 50 MHz with
  
ELOG V3.1.3-