  8363   Thu Mar 28 01:59:33 2013 JenneUpdateLockingPRMI progress - even better![Gabriele, Rana, Jenne, Jamie, Lisa, Zach]
We
tweaked some things after dinner, and our
  
  8362   Thu Mar 28 00:31:11 2013 JenneUpdateSUSPRMI optics' oplev servos tuned[Rana, Gabriele, Jenne, Jamie, Lisa, Rana]
We have tuned the oplev servos for
PRM, BS, ITMX, ITMY.  For each, we measured
 8x 
  8361   Wed Mar 27 21:53:21 2013 AnnalisaUpdateABSLBeat note of ATF auxiliary laserAfter measuring the beat note, the "Alberto"
NPRO auxiliary laser has been moved from
the PSL table to the POY table. Its beam
  
  8360   Wed Mar 27 15:46:13 2013 JenneUpdateLockingPRMI progress[Gabriele, Jenne]
We have achieved PRMI locks of the
order ~5 seconds! Here is an example lock:
 PRMI_sb_27Mar2013.png 
  8359   Tue Mar 26 20:20:10 2013 CharlesUpdateISSISS Design Plans - Servo Noise AnalysisIn order to allow other individuals besides
myself to consider the proposed design of
the ISS, I have created a publicly available
 ISS.pdf 
  8358   Tue Mar 26 17:32:30 2013 ChloeUpdate QPD/ECDL ProgressI built the summing/subtracting circuit
on the breadboard, and hooked this up with
one of the other QPDs I found (image of setup
 IMG-20130326-00245.jpg 
  8357   Tue Mar 26 17:27:17 2013 KojiUpdateIOOTuning MC length/FSRPlease add the discussions on the cavity
absolute length (and its change, adjustment
precision),
  
  8356   Tue Mar 26 16:36:24 2013 SteveUpdate40m Upgrading table leveling mounts go here

    

       
            
 optabSTAND.PDFswivvelMountEE.jpg 
  8355   Tue Mar 26 16:10:31 2013 JamieUpdate40m UpgradingETMY table levelingSteve's suggestion for how to level the
end table using "swivel leveling mounts":
 end-tabel-leveling.png 
  8354   Tue Mar 26 15:43:45 2013 ranaUpdateIOOTuning MC length/FSR  Please attach
the data file of the measurement
  
  8353   Tue Mar 26 15:00:55 2013 ManasaUpdateIOOTuning MC length/FSR

    

       
            
 MC_spectrum.pngMC_spectrum.zip 
  8352   Tue Mar 26 11:33:55 2013 JamieUpdateOpticsHOWTO calculate effective RoC of flipped TTIn case anyone is curious how I got the
numbers for the effective radius of curvature
of the flipped TT mirrors, I include the
 mirror.mtransmission.mTTflipped.mM2Reff.m 
  8351   Tue Mar 26 11:08:03 2013 JenneUpdateLockingPRMI locking should be possible - let's get it done![Jenne, Gabriele, Jamie]
We have looked at Koji's old Finesse
code, and determined that the PRMI sensing
 PRMI_SBres_plot_allTheFs_LowRes.pngLSC_sigmatrix_PRMI.pdf 
  8350   Tue Mar 26 08:50:02 2013 SteveUpdateGeneraljanitor dayKeven, our janitor accidentally pushed
the main entry door laser emergency stop
switch.
  
  8349   Tue Mar 26 01:40:49 2013 KojiUpdateIOOTuning MC length/FSRI'm still waiting for the follow-up analysis
of the modulation freq tuning.
  
  8348   Tue Mar 26 00:17:47 2013 JenneUpdateLockingREFL pickoff fractionTo see how much of the light that comes
out of the REFL port actually  goes to the
PDs, I measured the power immediately after
  
  8347   Tue Mar 26 00:06:37 2013 JenneUpdateLockingAS beam put back on PD[Jenne, Gabriele]
We aligned MICH (first locked Yarm,
but didn't optimize since we don't have TRY,
  
  8346   Mon Mar 25 23:27:26 2013 ChloeUpdate QPD CircuitIn order to test the mount vibrations,
I will likely try and make a different circuit
work (with the summing/subtracting on an
  
  8345   Mon Mar 25 23:20:57 2013 AnnalisaSummaryAuxiliary lockingBeat note found![Annalisa, Manasa]
The beat note between the main PSL
and the auxiliarly NPRO has been found!
  
  8343   Mon Mar 25 23:17:11 2013 ranaSummaryIOOMC I measured the dark noise and regular intensity
noise in MC trans tonight to get some estimate
for the free running spectrum that the Chas
 MC-trans.pdf 
  8342   Mon Mar 25 18:58:09 2013 Albert YangUpdateoptical tablesOptical Table ToolboxesFor those of you who spend annoying amounts
of time looking for tools, fear no more.
Toolboxes for each optical table are coming!
  
  8341   Mon Mar 25 18:42:38 2013 ManasaUpdate40m UpgradingEndtable upgrade for auxiliary green laser : Timeline Endtable upgrade - timeline and progress
chart. End table upgrade wiki page updated.
 
 Endtable_progress.pdf 
  8340   Mon Mar 25 18:07:31 2013 SteveUpdate40m UpgradingETMY table is out

    

       
            
 shimmingEE.jpg 
  8339   Mon Mar 25 16:51:59 2013 JenneUpdateOpticsupdated calculations of PRC/SRC g-factors and ARM mode matchingI think we like the idea of flipping SR2
better than SR3 for the same ghost beam reasons
as PR2 is better than PR3.  There isn't
  
  8338   Mon Mar 25 16:51:43 2013 ChloeUpdate Final QPD Circuit DesignThis is the final version of the QPD circuit
I'm going to build. After playing around
with the spatial arrangement, this should
 IMG-20130325-00244.jpg 
  8337   Mon Mar 25 15:24:41 2013 ranaUpdateLockingTT1 drift 
 I doubt that it has truly disappeared.
Can you please make a measurement of it and
  
  8336   Mon Mar 25 15:01:33 2013 ManasaUpdateLockingTT1 drift

    

       
            
  
  8335   Mon Mar 25 11:42:45 2013 JamieUpdateComputersc1lsc mx_stream okI'm not exactly sure what the problem was
here, but I think it had to do with a stuck
mx_stream process that wasn't being killed
  
  8334   Mon Mar 25 09:52:22 2013 JenneUpdateComputersc1lsc mxstream won't restartMost of the front ends' mx streams weren't
running, so I did the old mxstreamrestart
on all machines (see elog
  
  8333   Fri Mar 22 23:23:38 2013 AnnalisaUpdateLockingBeat note still missing[Annalisa, Manasa, Koji]
I updated the setup for the beat
note. The main reason is that I needed to
 Beat_note_-_new_setup.jpg 
  8332   Fri Mar 22 19:46:29 2013 KojiSummaryLSCDiode impedance test resultI've tested Perkin-Elmer InGaAs PDs at
OMC Lab.
- The diode impedances were measured
  
  8331   Fri Mar 22 01:28:56 2013 ManasaUpdateLasersBeam profile of NPRO from ATFThe NPRO from ATF has been installed on
the POY table.
I have been making measurements to
  
  8330   Thu Mar 21 17:06:34 2013 SteveUpdate40m UpgradingETMY table is out

    

       
            
 ETMYtableSupport.jpg 
  8329   Thu Mar 21 14:02:45 2013 AnnalisaUpdateLockingincident angles

    

       
            
  
  8328   Thu Mar 21 13:50:08 2013 JamieUpdateLockingincident anglesIs there a reason to use non-45 degree
incident angles on the steering mirrors between
the laser and the PD?  I would always
  
  8327   Thu Mar 21 13:11:42 2013 AnnalisaUpdateLockingFinding the beat note

    

       
            
 Beat_note_setup.jpg 
  8326   Thu Mar 21 12:33:51 2013 ranaUpdateComputersFixedPlease stop power cycling computers. This
is not an acceptable operation (as Jamie
already wrote before). When you don't know
  
  8325   Thu Mar 21 12:04:05 2013 ManasaUpdateComputersFixedAll FE computers are back.
Restart procedure:
0a. Restart frame builder:
 up.png 
  8324   Thu Mar 21 10:29:12 2013 ManasaUpdateComputersComputers down since last nightI'm trying to figure out what went wrong
last night. But the morning status...the
computers are down.
 down.pngdown.png 
  8323   Thu Mar 21 10:19:28 2013 KojiUpdateLockingFinding the beat noteGive us more info on the elog:

What PD are you using? How much power
  
  8322   Thu Mar 21 09:53:46 2013 AnnalisaUpdateLockingFinding the beat note Yesterday I tried to find the beat
note between the main PSL and the auxiliary
NPRO, but I didn't :( 
  
  8321   Thu Mar 21 08:46:46 2013 ManasaUpdate40m UpgradingETMY table swapYes! We are swapping.
I'll be there very soon!
  
  8320   Thu Mar 21 08:11:53 2013 SteveUpdate40m UpgradingETMY table swap

    

       
            
  
  8319   Wed Mar 20 16:45:59 2013 ManasaBureaucracyAuxiliary lockingFetched NPRO from ATF[Koji, Annalisa, Manasa]
NPRO with controller from ATF joins
the 40m. We have put it on the POY table
 P3203298.JPGP3203299.JPG 
  8318   Wed Mar 20 15:51:54 2013 ManasaUpdate40m UpgradingEndtable upgrade

    

       
            
 Endtable_inventory.pdf 
  8317   Wed Mar 20 14:52:09 2013 ManasaUpdateSAFETYMC trans RFPD missingPDA255 at the MC transmission end is missing
and whoever had removed it earlier has left
the 
 MC.png 
  8316   Wed Mar 20 14:44:47 2013 JamieUpdateOpticsupdated calculations of PRC/SRC g-factors and ARM mode matchingBelow are new alamode calculations of the
PRC and SRC g-factors and arm mode matchings. 
These include fixes to the ABCD matrices
  
  8315   Wed Mar 20 14:00:21 2013 SteveUpdate40m UpgradingEndtable upgrade As discussed at the 40m meeting: Koji,
Manasa and Steve
  
  8314   Wed Mar 20 08:59:24 2013 SteveUpdatePEMair cond maitenance is today Outside air quality at 8:30am 
1.1 million of 0.5 micron particles cf /
min with MET counter #2
 100dPEM.png 
  8313   Tue Mar 19 20:24:56 2013 AnnalisaUpdateAuxiliary lockingAuxiliary laser on PSL table I moved the auxiliary laser from
the ITMY table to the PSL table and installed
all the optics (mirrors and lenses) to steer
  