40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 17 of 339  Not logged in ELOG logo
ID Date Author Type Category Subjectup Text Attachments
  5491   Tue Sep 20 23:01:37 2011 KeikoUpdateIOOAM modulation misteryKeiko, Suresh
AM modulations are still there ... the
  
  5502   Wed Sep 21 16:44:18 2011 KeikoUpdateIOOAM modulation misteryAM
modulation depths are found to be 50 times smaller
 P9210138.JPGP92101381.jpg 
  5520   Thu Sep 22 17:29:42 2011 KeikoUpdateIOOAM modulation misteryAM
modulation will add offset on SRCL signal
as well as PRCL signal. About 2% of the signal
 AMmod0MICH.pngAMmod1e-1MICH.pngAMmod0SRCL.pngAMmod3e-3SRCL.pngAMmod3e-3SRCL-AS55I.png 
  5538   Sat Sep 24 09:55:42 2011 KeikoUpdateIOOAM modulation misteryFrom the night day before yesterday (Sep
22nd, Thursday night. Sorry for my late update),
there
  
  6018   Sat Nov 26 19:07:40 2011 kiwamuSummaryGreen LockingAM trnasfer function of the Y end laser with doublin crystal

    

       
            
 AMTF_lightwave.pngAMTF_cailbrated.bod.zip 
  15206   Tue Feb 11 16:39:00 2020 shrutiUpdateALSAM/PMThe results of the AM/PM measurements:


Attachment 1: Traces
of 9 AM TFs overlaid on top of each other,
 AM.pdfPM.pdfRatio_all.pdfRatios_FM_PM.pdfRatio_all_new.pdf 
  11163   Tue Mar 24 05:05:09 2015 ericqUpdateLSCAO Path engaged[J, Q]

Terse tonight, more verbose tomorrow. 

We have succesfully achieved multiple
 CARM_DARM_AOengaged_23March2015.pdfloops.png 
  11167   Tue Mar 24 18:22:11 2015 ericqUpdateLSCAO Path engagedFor increased flatness of the AO response,
and thus less gain peaking in the CARM loop,
I reccomend turning down the MC servo VCO
 IMC_ao_Mar242015.pngIMC_olgs_Mar242015.png 
  11168   Tue Mar 24 18:47:10 2015 ericqUpdateLSCAO Path engagedJenne has more detailed notes about how
things went down last night, but I figure
I should write about how we got the
  
  10855   Mon Jan 5 23:36:47 2015 ericqUpdateIOOAO cable reconnected

    

       
            
  
  15903   Thu Mar 11 14:03:02 2021 gautamUpdateLSCAO pathThere is some evidence of weird saturation
but the gain balancing (0.8dB) and orthogonality
(~89 deg) for the daughter board on the REFL11
 IMG_9127.HEIC 
  15208   Wed Feb 12 12:13:37 2020 gautamUpdateLSCAO path attemptsSummary:


​The
PRFPMI can be controlled by a mix of ALS
 CARM_OLTF.pdfPRFPMI_errSigs.pdf 
  9912   Tue May 6 02:48:50 2014 JenneUpdateLSCAO path engaged with AS55 as error signal for Yarm locking[Rana, Jenne]
This evening, we were able to
lock the Yarm through the common mode board,
 TF3_5May2014_BoostON_UGF5kHz.pngzipped.tgzCM_TP2A_140506_boostON_realloc.pngout.pdf 
  10521   Fri Sep 19 13:12:07 2014 JenneUpdateLSCAO path glitches

    

       
            
  
  10516   Thu Sep 18 02:42:28 2014 JenneUpdateLSCAO path partly engagedTonight was a night of trying to engage
the AO path.  The idea was to sit at
arm powers of a few on sqrtInvTrans for CARM
 Zoom_TRXTRY4_EngagingAO_1095059162.png0020.pdf 
  10520   Fri Sep 19 04:05:05 2014 ericqUpdateLSCAO path partly engagedMore AO efforts. No huge news. 
Came at AO from each side. For each
sign, I lost lock just a few dB from the
 TFSR785_19-09-2014_020555.pdfTFSR785_19-09-2014_033920.pdf 
  15210   Thu Feb 13 02:07:26 2020 gautamUpdateLSCAO path transfer function measurementSummary:

I measured the transfer function
of the AO path, and think that there are
 AOpathTF.pdfIMCinLoop.pdf 
  1401   Fri Mar 13 20:23:37 2009 YoichiUpdateLSCAO path transfer function with X-arm lockedI measured the AO path transfer function while
the X-arm is locked with the POX PDH signal.
The POX-I signal was already connected to
 AOPath-Xarm.png 
  10219   Wed Jul 16 19:38:37 2014 manasaSummaryPSLAOM alignment issues and removed from beam pathAOM removed
from the beampath and PMC relocked. 
 AOMremoved.jpg 
  10168   Wed Jul 9 21:05:31 2014 manasaUpdateGeneralAOM and PSL Ringdown After the fits, here are the numbers!

    
        
 data_code.zipPSL_ringFit.pdfAOMringFit.pdf 
  10171   Thu Jul 10 00:38:20 2014 manasaUpdateGeneralAOM and PSL Ringdown

    

       
            
  
  9328   Fri Nov 1 18:59:41 2013 EvanConfigurationISSAOM cabling[Rana, Nic, Evan]
We did some work today on getting
the AOM back up and running so that we can
 aom.jpgaom_driver.jpgaom_driver_power.jpg20131101_170120.jpg 
  15087   Mon Dec 9 19:19:04 2019 YehonathanUpdatePSLAOM first order beam alignment{Yehonathan, Rana}

In order to setup a ringdown measurement
with perfect extinction we need to align
 20191209_193112.jpg20191209_193203_HDR.jpgimageedit_2_7551928142.gifimageedit_3_5863650538.gif 
  15089   Tue Dec 10 01:24:17 2019 YehonathanUpdatePSLAOM first order beam alignment 




  
  15090   Tue Dec 10 13:26:46 2019 YehonathanUpdatePSLAOM first order beam alignmentnvm the PZT can scan over many GHz.




  
  15131   Fri Jan 17 21:56:22 2020 YehonathanUpdatePSLAOM first order beam alignmentToday I noticed that the beam reflected
from the PMC into the RFPD has a ghost (attachment)
due to reflection from the back of the high
 20200117_174841.jpg 
  11343   Tue Jun 2 21:22:07 2015 rana, kojiConfigurationIOOAOM inserted in beam and alignedWe
spent an hour today to put the AOM back in
  
  7403   Tue Sep 18 20:32:42 2012 ManasaConfigurationPSLAOM installation {Jan, Manasa}
We tried towards calibrating the
RF driver of the AOM. We decided to use the
  
  7409   Wed Sep 19 11:39:37 2012 ManasaConfigurationPSLAOM installation

    

       
            
 ALC_25.png 
  7411   Wed Sep 19 15:41:27 2012 ManasaConfigurationPSLAOM installation 
 AOM driver has been removed
from the PSL table for testing. However the
  
  7414   Wed Sep 19 23:17:25 2012 ranaConfigurationPSLAOM installationMannasa and Unni and I looked at the
RF driver for the AOM. It was fine.
With the ALC input left unconnected,
  
  7416   Thu Sep 20 01:29:04 2012 ManasaConfigurationPSLAOM installation

    

       
            
 TEK00000.PNG 
  7425   Fri Sep 21 12:12:56 2012 ManasaConfigurationPSLAOM installation    {Jan, Manasa}
We installed the AOM driver back
on the PSL table this morning. To calibrate
 PSL.png 
  7464   Tue Oct 2 16:15:22 2012 ManasaConfigurationPSLAOM installation

    

       
            
 psl_aom.png 
  7471   Wed Oct 3 16:52:16 2012 ManasaConfigurationPSLAOM installation{Jan, Manasa}
We set start to check the performance
of the AOM on the PSL table. The AOM driver
  
  7474   Wed Oct 3 23:36:54 2012 KojiConfigurationPSLAOM installationAfter the AOM work the beam wasn't well
aligned to the PMC. The PMC REFL CCD shows
large misalignment in yaw.
 PMCTRANS.png 
  7479   Thu Oct 4 17:54:59 2012 ManasaConfigurationPSLAOM installation

    

       
            
  
  7480   Thu Oct 4 18:48:04 2012 janoschConfigurationPSLAOM installation
  
  7481   Thu Oct 4 20:57:43 2012 ManasaConfigurationPSLAOM installation

    

       
            
  
  7482   Thu Oct 4 22:16:28 2012 KojiConfigurationPSLAOM installationDo
more investigation to understand what is
causing the power reduction.
  
  7494   Fri Oct 5 18:08:17 2012 ManasaConfigurationPSLAOM installation

    

       
            
  
  12196   Fri Jun 17 22:36:11 2016 JohannesUpdatePSLAOM installationSubham and I have placed the AOM back into
the setup right in front of the PMC.

Steps undertaken:
 aom_new_mount.jpgaom_beam_split.jpgaom_dump_IR.jpg 
  12198   Mon Jun 20 08:26:56 2016 SteveUpdatePSLAOM picturesGood job Johannes and Subham.

 
 AOMinplace.jpginplaceAOM.jpgAOMin.png 
  15053   Wed Nov 27 16:10:29 2019 gautamUpdateLSCAOM reconnectedi reconnected the AOM driver to the AOM
in the main beam path (it was hijacked for
the AOM in the AUX laser path for Anjali's
  
  10115   Mon Jun 30 22:40:21 2014 ManasaUpdatePSLAOM ringdown

    

       
            
 AOM_ringSample1.pdf 
  11576   Fri Sep 4 10:25:19 2015 SteveConfigurationIOOAOM stage is readyNew
stage can hold the correct polarization.

DRAWING
 stage_AOM-EOM.jpgA-EOMholder.pdf 
  11581   Mon Sep 7 18:25:16 2015 ranaConfigurationIOOAOM stage is readyThe new stage missed the right height by
~2 mm. 
  
  1446   Mon Mar 30 17:02:46 2009 YoichiConfigurationGeneralAP OSA alignedI aligned the AP OSA, which had been mis-aligned
for a while.
  
  4919   Thu Jun 30 07:42:48 2011 SureshUpdateIOOAP Table Power levelsI measured the power in various beams on
the AP table to check and see if any beam
is having too much power. 
 AS-lowP_state.pdfAS-highP_state.pdf 
  13767   Thu Apr 19 09:57:03 2018 gautamUpdateWikiAP and ETMX tables uploaded to wikiThe most up to date pictures of the AP
table and ETMX table that Steve took have
been uploaded to the relevant
  
ELOG V3.1.3-