IDup Date Author Type Category Subject Text Attachments
  8902   Tue Jul 23 04:26:54 2013 JenneUpdateGeneralMC spot positionsAfter Koji and I lowered the power into
the PMC and saw that the MC locked nicely,
I remeasured the spot positions (no alignment
 MCdecenter_22July2013_lowpower.png 
  8903   Tue Jul 23 04:31:36 2013 JenneUpdateGeneralVent preparation - Ready for VentAfter
everyone's work today (good teamwork everybody!!),
  
  8904   Tue Jul 23 08:21:31 2013 SteveUpdateVACVent has started 
Thanks for the good preparation. 
IFO pressure P1=20 Torr 
 beforVent.pngstartVent.png 
  8905   Tue Jul 23 13:29:58 2013 KojiSummaryGeneral record of the initial state  initial_state_130723.png 
  8906   Tue Jul 23 13:55:08 2013 KojiUpdateIOOMC manually alignedThe MC was manually aligned. The spot positions
were measured and it is consistent with the
measurements done yesterday.
 MCalignment.pngMCspot.png 
  8907   Tue Jul 23 14:00:03 2013 SteveUpdateVACthe vent is completed The 40m IFO has reached  atmospher
in 5 hours. It is ready to open chamber condition.
The RGA is pumped with the maglev.
 Atm.png5cyl.pngventSum1d.png 
  8908   Tue Jul 23 16:39:31 2013 KojiUpdateGeneralFull IFO alignment recovered[Annnalisa Koji]
Full alignment of the IFO was recovered.
The arms were locked with the green beams
 alignment.png 
  8909   Tue Jul 23 16:47:01 2013 gautamUpdateCDSExcitation points set up on c1scx I just compiled and installed the
model with the excitation points on c1scx
and then restarted framebuilder. The channels
  
  8910   Tue Jul 23 19:37:08 2013 AnnalisaUpdateendtable upgradeEnd table picture

    

       
            
 IMG950073.jpgIMG950072.jpg 
  8911   Tue Jul 23 19:38:58 2013 gautamUpdateCDSCharacterisation of DAC at 1X9 
 I
just finished carrying out the same checks
  
  8912   Tue Jul 23 20:41:40 2013 gautamConfigurationendtable upgradeFull range calibration and installation of PZT-mounted mirrors Given
that the green beam is to be used as the
 M1_Pitch_calib.pdfM1_Yaw_calib.pdfM2_Pitch_calib.pdfM2_Yaw_calib.pdfPI_S330.20L.pdf 
  8913   Tue Jul 23 21:32:43 2013 KojiUpdateIOOFound the cause of mysterious MC motionThesedays
we were continuously annoyed by unELOGGED
activities of the interferometer.
  
  8914   Tue Jul 23 22:55:13 2013 JenneUpdateVACBS, ITMY doors to be opened in the morningWe will open the BS and ITMY doors first
thing tomorrow morning. I plan to try to
be in around 9 am.  The first order of business
  
  8915   Wed Jul 24 10:35:41 2013 SteveUpdateVACBS, ITMY doors are removed

    

       
            
 beforeDoorsOff.pngparticlecount10d.png 
  8916   Wed Jul 24 13:41:13 2013 JenneUpdateSUSSR2 flipped[Jenne, Annalisa]
SR2 is flipped, and reinstalled. 
We did that before lunch, and we're about
  
  8917   Wed Jul 24 14:26:24 2013 ranaUpdateIOOFound the cause of mysterious MC motionYes, this was not ELOG'd by me, unfortunately.
This was the MC tickler which I described
to some people in the control room when I
  
  8918   Wed Jul 24 15:07:54 2013 KojiUpdateSUSSR2 flippedAfter the first flipping, X/Y arms were
aligned and locked. Then the ASS aligned
the arms.
  
  8919   Wed Jul 24 19:21:56 2013 JamieHowToSUSSUS MEDM screen modernizationI started poking around at what we want
for new SUS MEDM screens.  Rana and
I decided we'd start with the ASC TIPTILT
 newsusmedm.png 
  8920   Wed Jul 24 22:58:03 2013 CharlesUpdateISSISS - Full Schematic - Updated I have made significant changes to
the ISS schematic, mostly in the form of
adding necessary subsystems.
 40mServo_v1.pdf 
  8921   Thu Jul 25 02:53:00 2013 KojiUpdateGeneralIFO Alignment after TT flipping - no progressThere was no progress tonight after Jenne
left. 
I could not find any reasonable fringes
  
  8922   Thu Jul 25 12:53:45 2013 CharlesUpdateISSComparator + Triggering Prototype I realized I totally forgot to post
this last week, but I prototyped the comparator
and boost triggering portion of the ISS,
 Comparator_Prototype.pngComp_Triggering_Behavior.jpg 
  8923   Thu Jul 25 13:54:35 2013 manasaUpdateGeneralPR3 clamped and Y arm is back flashing[Jenne, Annalisa, Manasa]
After yesterday's flipping of PR3,
we lost our input pointing. Koji spent a
  
  8924   Thu Jul 25 14:02:53 2013 JenneUpdateSUSSR3, PR3 flippedYesterday afternoon, I went back into the
BS chamber, and flipped both PR3 and SR3.
  
  8925   Thu Jul 25 14:45:06 2013 ranaUpdatePEMGuralp specgram with ligoDV and NDS2 Once you install a matlab newer than
2012a, you can install ligoDV as a matlab
app and get the NDS2 client software for
 a.pdf 
  8926   Fri Jul 26 13:39:30 2013 KojiUpdateASCPOP QPD analysisIt was not actually easy to see from the
entry what signal was taken in what condition
but from the shape of the spectra
  
  8927   Fri Jul 26 14:39:08 2013 CharlesUpdateISSPower Regulation for ISS BoardI constructed a regulator board that can
take 
  
  8928   Fri Jul 26 22:19:24 2013 CharlesUpdateISSISS - Full Schematic - Updated

    

       
            
 40mServo_v1.pdf 
  8929   Fri Jul 26 22:45:14 2013 manasaUpdateGeneralVent progress[Koji, Manasa]
The arms were brought back to resonance
after yesterday's vent work.
  
  8930   Sun Jul 28 19:39:04 2013 AnnalisaUpdateendtable upgradePicture Yend table picture updated on the wiki
page
  
  8931   Sun Jul 28 20:13:41 2013 AnnalisaUpdateGreen LockingY Phase tracker calibrationI did a calibration measurement for the
Y part of the BeatBox using a Marconi. This
is in order to get a more accurate calibration
 YbeatBox_Calibration.pdf 
  8932   Mon Jul 29 13:39:25 2013 gautamConfigurationendtable upgradePZT Driver Board-further changes 
 
I have
 D980323-C-modified.pdfD980323-C-modified-pg2.pdf 
  8933   Mon Jul 29 16:04:40 2013 SteveUpdateVACAC removed Manasa, Eric, Evan, Koji and Steve,
Access connector removed in order
to complete alignment. Light aluminum with
 acout.pngAlAcACa.jpgAlAcACb.jpg 
  8934   Mon Jul 29 16:15:13 2013 KojiUpdateVACAC removedPrior to the access connector removal,
Manasa and I aligned the IFO mirrors. 
The arms were locked and aligned by
  
  8935   Mon Jul 29 21:57:45 2013 gautamConfigurationendtable upgradeHardware installed at 1X9 The following hardware   
  8936   Tue Jul 30 00:21:15 2013 KojiUpdateGeneralVent progress[Koji, Manasa, Sujan] 
Tomorrow we'll make final checks
  
  8937   Tue Jul 30 11:30:55 2013 manasaUpdateGeneralITMX oplev

    

       
            
  
  8938   Tue Jul 30 13:41:35 2013 KojiUpdateGeneralITMX oplevI wonder what optics is causing the halo
on the oplev beam.
It this comes from any uncoated lens
  
  8939   Tue Jul 30 15:38:24 2013 manasaUpdateGeneralITMX oplev

    

       
            
  
  8940   Tue Jul 30 16:21:46 2013 Alex ColeUpdateElectronicsPhotodetector Input Modulation [Eric, Alex]
We successfully used our system to
modulate the input to a single photodetector.
  
  8941   Tue Jul 30 18:56:31 2013 manasaUpdateGeneralITMX chamber vented/Closing plan[Koji,Manasa]
We removed the ITMX heavy door to
fix the oplev situation. 
  
  8942   Tue Jul 30 19:40:47 2013 gautamConfigurationendtable upgradeDAC-PZT Driver Board Output Signal Chain Tested 
 [Alex, Gautam]
  
  8943   Tue Jul 30 19:44:05 2013 gautamConfigurationendtable upgradeSecond mirror glued to PZT and mounted  
 I have
  
  8944   Wed Jul 31 00:59:58 2013 manasaUpdateGeneralITMX chamber vented/Closing planMy Plan for closing:

Today:
  
  8945   Wed Jul 31 09:51:43 2013 SteveUpdatesafetySujan receives safety trainingSujan got 40m specific basic safety training
this morning.
 IMG_0031.JPG 
  8946   Wed Jul 31 10:27:00 2013 SteveUpdateVACinstrument grade air is discontinouedWe have been using Air Liquide Instrument
Grade Air for venting the 40m vacuum envelope.
It is no longer available.
  
  8947   Wed Jul 31 17:02:17 2013 Alex ColeUpdateElectronicsPreliminary Photodetector Frequency Reponse Measurements[Eric, Alex]
We used our setup from yesterday
(elog #8940) to measure transimpedance measurements
 REFL11.jpgREFL33.jpgREFL55.jpgAS55.jpg 
  8948   Wed Jul 31 21:12:05 2013 manasaUpdateGeneralPump down called off[Koji, Manasa]
We missed to check that we had the green
  
  8949   Thu Aug 1 12:12:35 2013 gautamUpdateCDSNew model for endtable PZTsI have
made a new model for the endtable PZT servo,
and have put it in c1iscex. Model name is
 C1ASX_GDS_TP.png 
  8950   Thu Aug 1 13:09:17 2013 gautamUpdateCDSNew model for endtable PZTs-procedure 
 These
are roughly the steps I followed in setting
  
  8951   Thu Aug 1 15:06:59 2013 jamieUpdateCDSNew model for endtable PZTs

    

       
            
  