  8311   Tue Mar 19 17:00:14 2013 SteveUpdateVAClarge window quote of Cascade Optical quality 6.5" OD window specs
and quotes for vacuum view ports and optical
table enclosure are on the 40m wiki_ Aux
  
  8310   Tue Mar 19 14:21:57 2013 ManasaUpdate40m UpgradingEndtable upgrade : INVENTORYTHE INVENTORY FOR ETMY ENDTABLE.
We definitely need the polaris mirror
mounts and cylindrical lenses. As for the
 Endtable_inventory.pdf 
  8309   Tue Mar 19 10:30:00 2013 steveUpdateSAFETYcrane inspection 2013 
Professional crane inspector: Fred
Goodbar found two small leaks at the Vertex
 sippingOIL.jpg03191301.PDF 
  8308   Mon Mar 18 20:13:18 2013 AnnalisaBureaucracyAuxiliary lockingYend table upgrade - go fetch NPRO from ATF

    

       
            
  
  8307   Mon Mar 18 14:58:15 2013 SteveUpdateGreen Lockingrepair or replace dead NPRO 
 JDSU can repair the Lightwave
M126-1064-700 NPRO, sn 415  They do
  
  8306   Mon Mar 18 13:10:19 2013 KojiBureaucracyAuxiliary lockingYend table upgrade - go fetch NPRO from ATF1) Annalisa is going to start  working
on mode profiling and beat note search for
the old MOPA NPRO.
  
  8305   Mon Mar 18 12:35:29 2013 AnnalisaBureaucracyAuxiliary lockingYend table upgrade - go fetch NPRO from ATF

    

       
            
  
  8304   Mon Mar 18 12:23:25 2013 JenneBureaucracyAuxiliary lockingYend table upgrade - go fetch NPRO from ATFZach has just replied, and said that we
should feel free to take
  
  8303   Mon Mar 18 12:02:12 2013 AnnalisaConfigurationABSLABSL setup for g-factor measurement of PRCMotivations
The ABSL
technique has been already used in the past
to measure the 
  
  8302   Fri Mar 15 16:46:52 2013 JenneBureaucracyAuxiliary lockingYend table upgrade - fast track?In light of the Yend auxiliary laser's
ill health, I think we should reconsider
the possibility of changing out the Yend
  
  8301   Fri Mar 15 15:26:13 2013 KojiUpdateGreen LockingYarm ALS laser is funny / dyingI took a look at the laser. It is probably
the LD TEC (DTEC) failure.
As the temperature of the LD (DTMP)
  
  8300   Fri Mar 15 02:19:01 2013 JenneUpdateGreen LockingYarm ALS laser is funny / dyingI turned the laser back on around 1am. 
This is still happening, although right now
it is turning off more often than before,
  
  8299   Fri Mar 15 02:14:27 2013 JenneUpdateCDSSimulink linking to wrong library partJamie and I discovered a problem with Matlab/Simulink
earlier today. 
In the end suspension models, there
  
  8298   Fri Mar 15 01:57:02 2013 JenneUpdateGreen LockingX arm green locked in TEM00This work earlier today had required moving
the harmonic separator back closer to its
original position, so that the green could
  
  8297   Thu Mar 14 20:22:33 2013 JenneUpdateGreen LockingXbeat attemptI aligned the Xgreen and PSL green to overlap
on the X beat PD, and reconnected the splitter
which combines the X and Y beat signals and
  
  8296   Thu Mar 14 17:31:57 2013 ManasaUpdateGreen LockingX arm green locked in TEM00

    

       
            
  
  8295   Thu Mar 14 16:56:16 2013 ChloeUpdate QPD Circuit DesignI have sketched out the circuit design
for the QPD. However, it seems like even
when using a different opamp configuration,
  
  8294   Thu Mar 14 16:41:48 2013 JenneUpdateGreen LockingYarm ALS laser is funny / dying

    

       
            
  
  8293   Thu Mar 14 13:38:29 2013 JenneUpdateGreen LockingPSL green cleaned upI ran a cable to the GTRX camera. 
It is now input #2.  The videoswitch
script input naming is modified to match
  
  8292   Thu Mar 14 11:51:14 2013 JamieUpdateGeneralBeatbox upgraded with output whitening, reinstalled

    

       
            
  
  8291   Thu Mar 14 04:20:54 2013 JenneUpdateGreen LockingYbeat attemptI dedicated my evening to trying to get
the Ygreen beatnote (the idea being to then
get the Xgreen beatnote).
  
  8290   Wed Mar 13 21:04:37 2013 JenneUpdateGreen LockingPSL green cleaned upBoth X and Y green are aligned such that
the arm beams hit the broadband PD. 
Also, the 4th port of the combining BS for
  
  8289   Wed Mar 13 16:29:25 2013 ManasaUpdateLockingTWO arms TWO colors

    

       
            
  
  8288   Wed Mar 13 16:25:16 2013 ManasaUpdateIOOTuning MC length/FSR[Koji, Manasa]
We looked at the MC modulation frequency
on the spectrum analyzer and observed beat
  
  8287   Wed Mar 13 16:04:24 2013 steveUpdateSAFETYlaser safety glasses checked All safety glasses were cleaned in
soapy water by Bob. I measured their transmission
at 1064 nm, 150 mW,  beam diameter 1.5
 safetyglasseschecked.jpg 
  8286   Wed Mar 13 15:30:37 2013 Max HortonUpdateSummary PagesFixing Plot LimitsJamie has informed me of numpy's numpy.savetxt()
method, which is exactly what I want for
  
  8285   Wed Mar 13 11:34:24 2013 SteveUpdateoptical tablestable covers moved to CESThe two acrylic optical table enclosures
were moved from the carpenter shop to CES.
I need to order windows. The latest 
 acrylicEnclosure.jpg 
  8284   Wed Mar 13 10:26:58 2013 ManasaUpdateLockingWe're still good!!We're still good with the IFO alignment
after 7hours. 
  
  8283   Wed Mar 13 08:34:33 2013 yutaUpdateLockingTWO arms TWO colors- I took the shutter from AS table to use
it for the PSL green. It was sitting near
MC REFL path unused (elog
  
  8282   Wed Mar 13 03:12:47 2013 Manasa, JenneUpdateLockingTWO arms TWO colors[Jenne, Manasa]

  
  8281   Wed Mar 13 02:48:13 2013 JenneUpdateIOOMC all betterKoji reminded me (again....this is probably
the  2nd or 3rd time I've "discovered"
this, at least) that the script
  
  8280   Tue Mar 12 14:51:00 2013 SteveUpdateComputersbuy warranty or not ? Details of the warranties are posted
on wiki power
supply cost, warranty
  
  8279   Tue Mar 12 14:02:22 2013 JenneUpdateAlignmentBeam drift - mystery partially solved?Steve just told those of us in the control
room that the custodian who goes into the
IFO room regularly steps on the blue support
  
  8278   Tue Mar 12 12:06:22 2013 JamieUpdateComputersFB recovered, RAID power supply #1 deadThe framebuilder RAID is back online. 
The disk had been mounted read-only (see
below) so daqd couldn't write frames, which
  
  8277   Tue Mar 12 11:49:18 2013 JenneUpdateIOOMC weird again[Manasa, Annalisa, Jenne]
The MC wasn't locking on TEM00 this
morning, and the WFS kept pulling the MC
  
  8276   Tue Mar 12 00:58:05 2013 ManasaUpdateAlignmentYarm - Spot positions centered[Jenne, Manasa]

  
  8275   Tue Mar 12 00:45:50 2013 JenneUpdateIOOMC weird again~20 minutes ago, maybe right around the
time the fb's RAID died (elog 8274)
the mode cleaner started behaving weirdly
  
  8274   Tue Mar 12 00:35:56 2013 JenneUpdateComputersFB's RAID is beeping [Manasa, Jenne]
Manasa just went inside to recenter
the AS beam on the camera after our Yarm
  
  8273   Mon Mar 11 22:28:30 2013 Max HortonUpdateSummary PagesFixing Plot LimitsQuick Note on Multiprocessing: 
The multiprocessing was plugged into the
codebase on March 4. Since then, the various
  
  8272   Mon Mar 11 19:01:21 2013 JenneUpdatePEMproposed seismometer locationsThis is my interpretation of where Steve
is proposing to place the seismometers (he
wrote ITMX southwest, but I'm pretty sure
 SeismometerProposedPositions_11March2013.pdf 
  8271   Mon Mar 11 17:18:00 2013 ManasaUpdateEnvironmentEarthquake: Suspensions tripped and MC realignedI found all suspensions including the MC
suspensions tripped this morning after the
earthquake.
  
  8270   Mon Mar 11 16:29:29 2013 SteveUpdatePEMproposed seismometer locationsGranite base 20" x 20" x 5" 
locations are on the CES side of our IFO
arms:  as shown ETMY_ south-west, ETMX_north-east,
 ETMY_sw.jpgITMX_se.jpgETMX_ne.jpg 
  8269   Mon Mar 11 15:52:46 2013 JenneUpdateIOOMC spots centered, WFS realignedLooking more into the MC, it appears that
no spot centering was done after the power
attenuation optics were removed (see elog
 MCspots_11Mar2013.png 
  8268   Mon Mar 11 14:10:05 2013 JenneUpdateEnvironmentMC suspensions moved by this morning's earthquakesNone of the suspensions
All suspensions were tripped (edited
by Manasa; see elog
 EQ.pngMC-SUS-kicked-EQ.png 
  8267   Mon Mar 11 12:29:25 2013 ManasaUpdateAlignmentInput beam drift - weekend trendI centered ipang and ippos on the QPDs
(using only the steering mirrors) and wanted
to see the drift over the weekend.
 IPANG_drift.png 
  8266   Mon Mar 11 10:20:36 2013 Max HortonSummaryComputersAttempted Smart UPS 2200 Battery ReplacementAttempted Battery Replacement on Backup
Power Supply in the Control Room: 
I tried to replace the batteries
 upsB.jpgupsBa.jpg 
  8265   Sun Mar 10 13:29:29 2013 KojiHowToIOOHow to calculate the accumulated round-trip Gouy phaseHow to calculate the accumulated round-trip
Gouy phase (and namely the transverse mode
spacing) of a general cavity
  
  8264   Sat Mar 9 19:29:27 2013 KojiUpdatePSLModulation depthLast night I measured the modulation depth
of the MC incident beam.

Method:
 mod_depth.pdf 
  8263   Fri Mar 8 21:00:05 2013 ManasaUpdatePSLPMC fixed

    

       
            
  
  8262   Fri Mar 8 20:51:00 2013 ManasaUpdateAlignmentInput beam drift - investigation **IMPORTANT**Checking the drift in input pointing
(TT2 is the main suspect)
  