40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 175 of 341  Not logged in ELOG logo
IDup Date Author Type Category Subject Text Attachments
  8750   Tue Jun 25 23:57:30 2013 ranaUpdateSUSNDS2 StatusI've restarted the NDS2 process on Megatron
so that we can use it for getting past data
and eventually from outside the 40m.
  
  8751   Wed Jun 26 00:15:51 2013 AnnalisaUpdateGreen LockingETMY - green locking and beat note setup[Koji, Annalisa]
Alignment improving

    The alignment of the green
  
  8752   Wed Jun 26 01:30:31 2013 ranaSummaryPEMVariation in 10-30 Hz seismic RMSFor quite a while (no one knows how long),
we've seen fluctuations in the 10-30 Hz seismic
motion. This shows up as the purple trace
 gur1z_rms.pdfgur1z.pdf 
  8753   Wed Jun 26 04:38:02 2013 JenneUpdateLSCPRCL locking again - ASC successWith Rana's help/supervision/suggestions,
I have closed the loop on the PRMI ASC servo
with the new QPD.  I think I've
 PRMI_ASC_yawOnly_powerSpectra_25June2013.pdfPRMI_ASC_yawOnly_25June2013_mag.pdfPRMI_ASC_yawOnly_25June2013_phase.pdfPRMI_ASC_yawOnly_25June2013_coherence.pdfSensMatMeas_26June2013.png 
  8754   Wed Jun 26 11:32:11 2013 ManasaUpdateGreen Lockingc1als model editedI have added more DAQ channels to the c1als
model. Installed and restarted the model
on c1ioo. Frame builder restarted.
  
  8755   Wed Jun 26 11:45:06 2013 gautamUpdateGeneralPID tuning-Doubling Oven at Y end 
Summary
Having established the serial link
 oven-loop.pdfTime_series.pngfit_attempt.png 
  8756   Wed Jun 26 13:37:13 2013 JenneUpdateIOOMC very misaligned - put backNot sure why it was so poorly aligned,
since the misalignment "event"
happened while we were all away at lunch,
  
  8757   Wed Jun 26 15:11:08 2013 John ZweizigUpdateSUSNDS2 Status


   
        
            
  
  8758   Wed Jun 26 19:02:38 2013 gautamUpdateGeneralITMx Oplev (not quite?) Fixed 
Summary:
Steve and I tried to fix the Oplev
 oplev_chamber.pdfphoto_1.JPGphoto_2.JPG 
  8759   Wed Jun 26 21:52:55 2013 CharlesUpdateISSCTN Servo Prototype CharacterizationFollowing the circuit
design in elog 8748, I constructed
a prototype for the servo portion of the
 TF_Mag-CTNServo_v2_Prototype.pngTF_Mag-CTNServo_v2_Prototype_AD829s.png 
  8760   Wed Jun 26 23:32:15 2013 ManasaUpdateGreen Lockingc1als model editedI have modified the ALS model to now include
PHASE_OUT calibration for both X and Y. MEDM
screen has not been edited to include these
 c1als_mdl.png 
  8761   Thu Jun 27 02:44:33 2013 ranaUpdateGreen Lockingc1als model edited Could be that this is OK, but it
doesn't yet make sense to me. Can you please
explain in words how this manages to apply
  
  8762   Thu Jun 27 05:44:51 2013 ranaUpdate 40MARS wireless network problems

    

       
            
  
  8763   Thu Jun 27 10:45:41 2013 SteveUpdateGeneral40MARS wireless network problems

    

       
            
  
  8764   Thu Jun 27 15:50:03 2013 JenneUpdatePEMBLRMS are going crazyThe BLRMS are totally crazy today! 
I'm not sure what the story is, since it's
been this way all day (so it's not an earthquake,
 WeirdBLRMSincrease_27June2013_rawSeis.pngWeirdBLRMSincrease_27June2013_lowFreqBLRMS.pngWeirdBLRMSincrease_27June2013_Gur1xBLRMS.png 
  8765   Thu Jun 27 15:58:27 2013 SteveUpdatePEMPSL enclosure particle counts 
 Particle counts were measured
inside the PSL enclosure at 40VAC variac
  
  8766   Thu Jun 27 17:04:49 2013 JenneUpdatesafetyNitrogen bottle too hot - overpressuredAll of us in the control room / desk area
heard a sudden whoosh of air a few minutes
ago.  It kind of sounded like a pressure
  
  8767   Thu Jun 27 17:09:41 2013 JenneUpdateLSCPRCL locking again - POP PIT workLast night before dinner, I copied over
the ASC yaw servo filters to the ASC pitch
filter bank.  Using ASC gain of +0.001,
 MeasuredVsModeledASCyaw.png 
  8768   Thu Jun 27 17:41:08 2013 AnnalisaUpdateGreen LockingETMY -beat note found! 
 Y
 beat_note.JPG 
  8769   Thu Jun 27 17:49:17 2013 manasaUpdateGreen Lockingc1als model edited

    

       
            
 ALS_PHASEcalib.pngBEATX_FINE.png 
  8770   Thu Jun 27 18:11:53 2013 gautamUpdateGeneralITMx Oplev-POX looks beam okay 
 Jenne just aligned the X arm
and I got a chance to check the status of
  
  8771   Thu Jun 27 18:24:25 2013 CharlesUpdateISSCTN Servo Prototype Characterization - Done CorrectlyAs I showed in [elog
8759], measuring the transfer function
of my prototype servo was difficult due to
 TF-CTNServo_v2_Prototype-Individual_Stages.pngTF-CTNServo_v2_Prototype-Calc_vs_Meas.pngTF-CTNServo_v2_Prototype-Individual_Stages.figTF-CTNServo_v2_Prototype-Calc_vs_Meas.fig 
  8772   Thu Jun 27 19:17:03 2013 manasaUpdateLSCXarm ALS out-of-loop noiseMeasured
frequency noise is ~10Hz/rtHz @100Hz. 
 ALS_OoL.pdfALS_OoL1.pdf 
  8773   Thu Jun 27 21:45:48 2013 ranaUpdatePEMBLRMS are going crazyIts an increase in the microseismic peak.
Don't know what its due to though.
 useism.pdf 
  8774   Thu Jun 27 21:59:42 2013 ranaUpdateComputer Scripts / ProgramsMatlab upgradedI moved the old matlab directory from /cvs/cds/caltech/apps/linux64/matlab_o   
  8775   Thu Jun 27 22:05:25 2013 ranaUpdateGeneralPianosa fixedThe keyboard on Pianosa workstation has
been flaky for the last several days at least.
Today, it was having troubles mounting the
  
  8776   Thu Jun 27 22:52:38 2013 Rana, Gabriele, FrancescoSummaryComputer Scripts / ProgramsLIGO-DV installedI installed ligoDV in the /ligo/apps/ligoDV/
Now, by pointing the tool at the
local NDS2 server (megatron:31200) you can
 ldv.png 
  8777   Thu Jun 27 23:01:39 2013 gautamUpdateGeneralITMx Oplev-servo gains adjusted 
 With rana's input, I changed
the ITMx oplev servo gains given the beam
 pitch-plot.pdfyaw-plot.pdf 
  8778   Thu Jun 27 23:18:46 2013 jamieUpdateComputer Scripts / ProgramsWARNING: Matlab upgraded

    

       
            
  
  8779   Fri Jun 28 02:12:21 2013 manasaUpdateLSCPRMI + X arm ALS X arm stabilized
using ALS while PRMI stayed locked
 PRMI_XALS_Jun28.png 
  8780   Fri Jun 28 02:12:41 2013 JenneUpdateLSCPRCL locking again - ASC workRana had the epiphany that I didn't have
any antiwhitening for my POP QPD.  Ooops. 
We looked at the schematic for the
 PRMI_ASC_powerSpectra_27June2013.pdfScreenshot-Untitled_Window.png 
  8781   Fri Jun 28 02:23:00 2013 JenneUpdateLSCNeed to measure sensing matrix at REFL165[Lisa, Rana, Jenne]
Lisa asked to see a model of the
PRMI sensing matrix with REFL165 included,
 SensMatModel_28June2013_InclREFL165.png 
  8782   Fri Jun 28 11:33:32 2013 SteveUpdate 40MARS wireless network problem

    

       
            
  
  8783   Fri Jun 28 12:15:09 2013 KojiUpdateLSCNeed to measure sensing matrix at REFL165There is no sensible REFL165 PD in the
lab. I am supposed to prepare a new version
of REFL165 using prototype BBPD.
  
  8784   Fri Jun 28 13:10:28 2013 gautamUpdateGeneralITMx Oplev-servo gains adjusted 
 As mentioned in elog
8770, I wanted to give the POX beam a
 pitch-plot_copy.pdfyaw-plot_copy.pdf 
  8785   Fri Jun 28 14:57:15 2013 SteveUpdateGeneralclosing lab doorsI found the south end emergency doors not
latched completely. There was a ~ 3/8"
vertical gap from top to bottom.
  
  8786   Fri Jun 28 16:19:06 2013 CharlesUpdateISS40m Noise Budget - Seismic Contribution I'm working on developing a full
noise budget for the 40m. To that end, I'll
use measurements from the GUR1 seismometer
 seismic_noise_6-28-13_raw.pngseismic_noise_6-28-13_raw.figseismic_noise_6-28-13_meters.pngseismic_noise_6-28-13_meters.fig 
  8787   Fri Jun 28 17:33:33 2013 John ZweizigUpdateSUSNDS2 Status


   
        
            
  
  8788   Mon Jul 1 23:27:07 2013 JenneUpdateLSCSensing Matrix vs. Xarm sweepI have modeled the PRMI sensing matrix
as I bring the Xarm into resonance. 
In optickle, I have the PRMI on sideband
  
  8789   Tue Jul 2 00:25:14 2013 gautamUpdateGreen LockingUniversal PDH box tuning [Koji, Annalisa, Gautam]
Annalisa noticed that over the weekend
the Y-arm green PDH was locked to a sideband,
 circuit.pdfmodel.pdf 
  8790   Tue Jul 2 02:29:47 2013 JenneUpdateLSCSensing Matrix vs. Xarm sweepHere is the Sensing Matrix movie (sorry
for the iffy quality - my movies usually
come out better than this):
  
  8791   Tue Jul 2 12:59:46 2013 CharlesUpdateISSGeneral Design for ISS Applicable to Multiple Applications While attempting to develop a somewhat
accurate noise budget for the 40m, I reasoned
that while the shape of the transfer function
 6x 
  8792   Wed Jul 3 01:49:46 2013 AnnalisaUpdateGreen LockingALS servo configuration[Koji, Annalisa, Manasa]
Today we worked on the ALS servo
stabilization for the Y arm.
 ALSALS_calibrated 
  8793   Wed Jul 3 03:06:29 2013 AnnalisaUpdateGreen LockingALS servo configuration 
I realized that I cannot open the
attached plots. I'll fix them tomorrow.
  
  8794   Wed Jul 3 10:39:25 2013 manasaUpdateIOOMC aligned and WFS enabledI found WFS had been left disabled from
sometime yesterday. I don't see anyone mentioning 
when and why they had turned OFF the WFS
  
  8795   Wed Jul 3 11:07:17 2013 AlexSummary Photodetector Characterization [Alex, Koji]
We characterized Koji's BBPD
MOD for REFL165 (see attachment).
 BBPD_PCB.pdftransimpedance_measurement.pdf 
  8797   Wed Jul 3 14:33:46 2013 KojiSummaryLSCTest result for the REFL165 photodetectorP.1 Circuit diagram
Added components are indicated by
red symbols.
 REFL165_response_130702.pdf 
  8799   Wed Jul 3 20:51:43 2013 CharlesUpdateISSProposed ISS for CTN Experiment - Altium Schematic After familiarizing myself with Altium,
I drew up the attached schematic for the
ISS to be used in the CTN experiment. The
 CTNServo_v2_abbott-switch.pdf 
  8800   Wed Jul 3 21:19:04 2013 gautamConfigurationendtable upgradeplan of action for PZT installation This is an update on the situation
as far as PZT installation is concerned.
I measured the required cable (PZT driver
 DAC_bank.pngASC_schematic.pdf 
  8801   Thu Jul 4 01:09:33 2013 Annalisa, KojiUpdateLSCPRMI locked with REFL165Summary:
-
The new REFL165 PD was installed on the AP
 130703_PRMI.pdfScreenshot.png 
ELOG V3.1.3-