40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 175 of 344  Not logged in ELOG logo
Entry  Sat Aug 27 20:38:17 2011, Suresh, Update, IOO, Light is back on WFS 
Entry  Mon Aug 29 19:14:31 2011, Suresh, Update, IOO, WFS phase adjustments Screenshot-1.png
Entry  Tue Aug 30 17:31:55 2011, Suresh, Update, IOO, C1IOO model reverted and fb restarted 
Entry  Fri Sep 2 13:12:08 2011, kiwamu, Update, IOO, triple resonant box : ready to install refl_eom.png
    Reply  Fri Sep 2 15:56:32 2011, Koji, Update, IOO, triple resonant box : ready to install 
    Reply  Sat Sep 3 14:47:50 2011, kiwamu, Update, IOO, triple resonant box : brief estimations about reflections and mode. depths 
Entry  Tue Sep 6 17:43:01 2011, Suresh, Update, IOO, Free Swing ITMY started 
    Reply  Tue Sep 6 17:56:53 2011, Jenne, Update, IOO, Free Swing ITMY started 
Entry  Wed Sep 7 00:01:23 2011, Suresh, Update, IOO, ITMY chamber ready for heavy doors 
    Reply  Wed Sep 7 22:17:04 2011, rana, Update, IOO, RF Amp for EOM on PSL Table 
Entry  Thu Sep 8 20:13:24 2011, kiwamu, Update, IOO, MC is back to full power 
Entry  Fri Sep 9 11:59:58 2011, kiwamu, Update, IOO, PZT1 doesn't work 
    Reply  Fri Sep 9 13:29:09 2011, kiwamu, Update, IOO, a history of PZT mirror 
Entry  Fri Sep 9 16:16:59 2011, kiwamu, Update, IOO, spot positions on MC mirrors (in-vac) 
    Reply  Fri Sep 9 19:15:17 2011, rana, Update, IOO, RF Amp for EOM on PSL Table 
    Reply  Fri Sep 9 20:52:59 2011, kiwamu, Update, IOO, spot positions on MC mirrors (in-vac) 
Entry  Sat Sep 10 20:30:01 2011, rana, Update, IOO, MC trans re-aligned / MC2 shifted mysteriously / MC2 re-aligned MCdecenter.png
Entry  Mon Sep 12 23:54:10 2011, kiwamu, Update, IOO, EOM resonant box installed EOM.pngbefore.pngafter.png
Entry  Tue Sep 13 09:16:00 2011, Suresh, Update, IOO, MC spots recentered and input beam aligned mcdecenter20110912_1.pngmcdecenter20110912_2.png
Entry  Fri Sep 16 11:15:12 2011, Koji, Update, IOO, PZT1 situation P9151574.JPGP9161576.JPGP9161577.JPG
    Reply  Sat Sep 17 14:04:45 2011, Koji, Update, IOO, PZT1 driver in place P9171579.JPGP9171580.JPG
Entry  Sun Sep 18 15:57:00 2011, Koji, Update, IOO, The PZT driver engaged to PZT1 
    Reply  Mon Sep 19 14:57:36 2011, kiwamu, Summary, IOO, IP POS is back wiring.png
Entry  Mon Sep 19 23:19:40 2011, Keiko, Update, IOO, AM modulation mistery 
Entry  Tue Sep 20 13:57:44 2011, kiwamu, Update, IOO, incident beam to MC aligned 
Entry  Tue Sep 20 16:31:24 2011, Keiko, Update, IOO, Small modulation depth 
    Reply  Tue Sep 20 16:38:25 2011, Keiko, Update, IOO, Small modulation depth 
Entry  Tue Sep 20 21:13:39 2011, Suresh, Update, IOO, MC aligned and PSL beam into MC readjusted 
    Reply  Tue Sep 20 23:01:37 2011, Keiko, Update, IOO, AM modulation mistery 
    Reply  Wed Sep 21 16:44:18 2011, Keiko, Update, IOO, AM modulation mistery P9210138.JPGP92101381.jpg
    Reply  Wed Sep 21 17:42:35 2011, rana, Update, IOO, AM modulation misery 
    Reply  Wed Sep 21 18:53:03 2011, Keiko, Update, IOO, AM modulation misery AM0.pngAMratio1.pngAMratio50.png
Entry  Wed Sep 21 19:20:41 2011, Suresh, Update, IOO, PSL beam into MC was off in Pitch. Readjusted. 
    Reply  Wed Sep 21 21:13:35 2011, rana, Update, IOO, AM modulation misery 
    Reply  Thu Sep 22 17:29:42 2011, Keiko, Update, IOO, AM modulation mistery AMmod0MICH.pngAMmod1e-1MICH.pngAMmod0SRCL.pngAMmod3e-3SRCL.pngAMmod3e-3SRCL-AS55I.png
Entry  Thu Sep 22 23:02:15 2011, Suresh, Update, IOO, no light on WFS2. Realigned input onto both WFS 
Entry  Thu Sep 22 23:10:07 2011, Suresh, Update, IOO, proposed modifications to the C1IOO model 
Entry  Fri Sep 23 18:00:54 2011, Suresh, Update, IOO, PSL beam realigned to MC trend.png
    Reply  Sat Sep 24 09:55:42 2011, Keiko, Update, IOO, AM modulation mistery 
Entry  Fri Sep 30 17:40:03 2011, kiwamu, Update, IOO, AM / PM ratio 
Entry  Fri Sep 30 18:06:24 2011, kiwamu, Summary, IOO, PZTs straing guage beforeOutage110930.png
Entry  Tue Oct 4 14:41:47 2011, Jenne, Update, IOO, MC Trans channels are digital 0 
Entry  Tue Oct 4 15:43:10 2011, Koji, Update, IOO, closed the shutter before the MC 
    Reply  Tue Oct 4 15:57:30 2011, Suresh, Update, IOO, MC Trans channels are digital 0 
    Reply  Tue Oct 4 19:06:46 2011, Koji, Update, IOO, closed the shutter before the MC 
Entry  Fri Oct 7 19:06:46 2011, Suresh, Update, IOO, MC spot positions: checked and corrected. 
Entry  Fri Oct 7 22:48:26 2011, Suresh, Update, IOO, MC2 Trans QPD spot size and incident power decreased 
Entry  Tue Oct 11 00:59:55 2011, Suresh, Update, IOO, Preliminary locking of WFS loops 6x
Entry  Sat Oct 15 04:53:41 2011, Suresh, Update, IOO, MC WFS Output Matrix determination WFS1P_RespTo_MC1andMC2.pdfWFS1_IQphase20111015_1.pdfWFS2_IQphase20111015_1.pdfWFS1_IQphase20111015_2.pdfWFS2_IQphase20111015_2.pdf
    Reply  Sat Oct 15 10:58:32 2011, rana, Update, IOO, MC WFS Output Matrix determination 
ELOG V3.1.3-