40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 167 of 346  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  9037   Tue Aug 20 00:19:23 2013 ranaUpdateLSCPRMI / DRMI investigationsWhile Jenne was plotting, I locked and
aligned the MICH with AS55_Q. Then I aligned
the PRM and locked PRMI using REFL55_I/Q
 6x 
  9036   Mon Aug 19 23:08:31 2013 JenneUpdateLSCDRMI sensing signalsHere are a bunch of sensing signals. 
The configuration is always DRMI.  Except
for the optic noted in the title and the
 11x 
  9035   Mon Aug 19 19:08:35 2013 KojiUpdateGreen LockingXend green layout corrections- An Aluminum mirror instead of 2"
unknown mirror for the pick-off for the rejected
beam from the green faraday isolator (Steve)
  
  9034   Mon Aug 19 17:40:32 2013 SteveUpdateGreen LockingXend green layout corrections Shutter moved, no more clipping.
Pick-off mirror 2" replaced
by 1" one. Laseroptik HR 532nm, incident
 beforeC.jpgnowC.jpgstillMultiple.jpg 
  9033   Mon Aug 19 16:18:56 2013 manasaUpdateGreen LockingXend green alignedASX scripts for PZT dither have been fixed
appropriately. Script resides in 
  
  9032   Mon Aug 19 15:23:07 2013 KojiUpdateIOOMC mirrors' ASC has non-zero inputs[Jenne, Koji]
This disturbance in the MC ASC channels
were fixed.
  
  9031   Mon Aug 19 14:22:36 2013 ranaUpdateGreen LockingXend green aligned    
  9030   Mon Aug 19 11:30:20 2013 JenneUpdateIOOMC mirrors' ASC has non-zero inputs[Masayuki, Jenne]
When I came in this morning, I noticed
that the Mode Cleaner had not been locked
  
  9029   Mon Aug 19 11:12:54 2013 SteveUpdateVACRGA scan at day 13 
 
 rgaScan13d.png 
  9028   Mon Aug 19 10:16:15 2013 PicassoMetaphysicsTreasureoutsider art   ranasglory.png 
  9027   Mon Aug 19 10:03:17 2013 SteveHowToGeneralhow not to leave a cableWe can not leave cables connected like
this. This is a burned toast award.
 NONOcable.jpg 
  9026   Mon Aug 19 09:54:13 2013 SteveUpdatesafetyMasayuki receives safety trainingMasayuki Nakano, a student of Seiji's from
ICRR / U Tokyo, is visiting us here at the
40m lab for the next couple months.
  
  9025   Mon Aug 19 09:36:32 2013 KojiUpdateGreen LockingXend green aligned[Rana Koji]
This is an elog about the activity
on Friday night.
 ALS_OUTOFLOOP_130816.pdf 
  9024   Mon Aug 19 07:53:48 2013 SteveUpdateSUSETMX damping restoredETMX sus damping restored   
  9023   Sun Aug 18 20:07:41 2013 ranaUpdateComputer Scripts / Programsuserapps SVN upJoeB and JamieR are working somewhat coherently
on a set of python libraries to fulfill all
of our command line CDS wants. This is being
  
  9022   Sun Aug 18 17:56:16 2013 ranaSummaryCDSMEDM Screen CPU UsagesI noticed at LLO (?) that the LSC screen
there uses up ~25-30% of the CPU time on
a single core for the control room iMac workstations
 obama1404_666531c.jpg 
  9021   Sun Aug 18 16:04:07 2013 ranaSummaryCDSFB lights all RED: mxstream restartSun Aug 18 15:52:50 2013
Found the FB lights (C1:FEC-NN_FB_NET_STATUS
and C1:DAQ-DC0_C1XXX_STATUS) RED for everything
 IFO-Trend.png 
  9020   Fri Aug 16 21:15:04 2013 ranaUpdateCDSNew/old CDS laptop for X-EndI took the "aso-laptop" and made
it into Ubuntu a couple months ago. Today
I added it to the Martian network and then
  
  9019   Fri Aug 16 19:36:49 2013 CharlesUpdatePSLPMC_trans ChannelRana and I connected the PMC_trans output
to the BNC connector board on the west end
of the PSL table (the channel is labeled).
  
  9018   Fri Aug 16 13:25:50 2013 KojiUpdateASSASX model/screen cleaning up[Koji Manasa]
Yesterday we cleaned up the ASX model
and screens to have more straight forward
  
  9017   Fri Aug 16 09:35:18 2013 SteveUpdateVACVacuum Normal state recognition is back

    

       
            
 VacuumNormal.pngvacValvesDisabled.jpg 
  9016   Thu Aug 15 21:42:53 2013 CharlesUpdateISSISS - Schematic + PCB Layout After many, many moons of getting
to know exactly how frustrating Altium can
be, I have completed the PCB layout for my
 ISS_v3.pdfISS_v3-Power_Reg.pdf 
  9015   Thu Aug 15 19:05:07 2013 manasaUpdateGreen LockingALS out of loop noiseBeat notes were recovered for both the
arms.
I locked the arms to IR using PDH
 ALS_OutLoop.pdf 
  9014   Thu Aug 15 12:30:17 2013 manasaUpdateGreen LockingLost beat notes[Koji, Nic, Manasa]
Update from last night.
Koji and I realigned the green optics
  
  9013   Thu Aug 15 09:34:12 2013 SteveUpdateGeneralWilcoxon cables rescuedEric and Steve,
 We removed Wilcoxon Accelerometer
PS and Amplifier unit under the BS optical
 rescuedGraycables.jpgwilconoxOut.jpgchanGains.jpg 
  9012   Thu Aug 15 01:51:50 2013 KojiSummaryGeneralRFM<->Dolphin bridge distributed to c1rfm and c1mcsSince the RFM-Dolphin bridges for the ASX
model was added to the c1rfm model, c1rfm
kept timing-out from the single sample time
  
  9011   Wed Aug 14 08:24:20 2013 SteveUpdateVACpumpdown at day 8 
 
 pd76md8.png 
  9010   Tue Aug 13 22:21:12 2013 KojiSummaryGeneralMinicircuit Filter TFs (AG4395A test)As a part of the network analyzer test
in the previous entry, the transfer functions
of Mini-Circuits filters we have at the 40m
 Minicircuit_LPF.pdfMinicircuit_BPF.pdfMinicircuit_HPF.pdf130813.zip 
  9009   Tue Aug 13 21:49:32 2013 KojiSummaryGeneralTesting new AG4395A network analyzerNew AG4395, sn MY41101114  for West
Bridge Labs was delivered. For the test purpose
it is at the 40m now.
 AG4395A_noise.pdf 
  9008   Tue Aug 13 21:09:03 2013 manasaUpdateGreen LockingArms ready for ALSI aligned
both the X and Y end green to the arms.
The transmitted green were aligned
  
  9007   Tue Aug 13 17:20:54 2013 KojiUpdateCDS[Fixed] c1iscex needs helpc1x01 timing issue was solved. Now all
of the models on c1iscex are nicely running.
Symptons
  
  9006   Tue Aug 13 13:30:41 2013 Alex ColeConfigurationElectronicsCable Routing I routed cables (RG405 SMA-SMA) from
several demodulator boards in rack 1Y2 to
the RF Switch in rack 1Y1 using the overhead
 photo_(6).JPG 
  9005   Tue Aug 13 11:54:40 2013 Alex ColeHowToElectronicsRF PD Fiber-Coupled Laser OperationThis post pertains to the fiber-coupled
diode laser mounted in rack 1Y1.
To turn the laser on, first turn
 photo_(4).pdf 
  9004   Tue Aug 13 11:40:19 2013 Alex ColeSummaryElectronicsRFPD Demod Filter Frequency Response Measurement For the RF PD Frequency Response
Measurement project, we get each PD signal
from the "PD RF Mon" output of
 photo_(3).JPGtest.jpg 
  9003   Tue Aug 13 11:04:44 2013 SteveUpdatePEMfluorecent lightsOur fluorecent
lights became obsolete.  We'll have
change fixtures over to some more energy
  
  9002   Tue Aug 13 07:40:53 2013 SteveUpdateCDSc1iscex needs help 
 Sorrensen ps ouput of +15V
at rack 1X9 was current limited to 10.3V
 c1iscexSick.png 
  9001   Mon Aug 12 23:13:14 2013 JenneUpdateASCPRCL ASS software in place

    

       
            
  
  9000   Mon Aug 12 21:27:03 2013 manasaUpdateCDSc1iscex needs helpI started to modify the c1asx model to
reduce the RFM model from hitting its max
time.
  
  8999   Mon Aug 12 17:30:03 2013 KojiUpdateASCPRCL ASS software in placeWhy POPDC???   
  8998   Mon Aug 12 15:39:40 2013 JenneUpdateASCPRCL ASS screens in placeI have added the PRCL ASS to the main ASS
screen, and created the servo and lockin
screens.  The filters loaded are the
  
  8997   Mon Aug 12 14:05:34 2013 JenneUpdateASCPRCL ASS software in place

    

       
            
  
  8996   Mon Aug 12 13:30:33 2013 JamieUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  8995   Mon Aug 12 12:57:59 2013 JenneUpdateCDSX-End Green ASS - Roundup

    

       
            
  
  8994   Mon Aug 12 10:44:22 2013 ranaUpdateLSCPRMI(sb) lock recovered  In the past, we used to use
Stefan's 'ezcademod' or Matt's 'ezlockin'
to do auto phase adjustment.
  
  8993   Sat Aug 10 05:53:51 2013 gautamUpdateCDSX-End Green ASS - RoundupOver
the last three days, I've had the interferometer
to test and optimize the ASX Servo. Based
 New_ASX_MEDM_MAIN.pdf 
  8992   Fri Aug 9 22:51:37 2013 KojiUpdateLSCPRMI(sb) lock recoveredPRMI(sb) lock
was recovered
  
  8991   Fri Aug 9 21:05:28 2013 KojiUpdateSUSfixed: SRM coils fine - problem with slow bias sliderNow the SRM Yaw bias in yaw is functional
without any strage behavior.
  
  8990   Fri Aug 9 16:49:35 2013 Jenne, manasaUpdateElectronicsPost-vent alignment cont'd - RFPDsNotes to the fiber team:
I am aligning beam onto the RFPDs
(I have finished all 4 REFL diodes, and AS55),
  
  8989   Thu Aug 8 21:25:36 2013 KojiUpdateGeneralPost-vent alignment cont'd- IPANG aligned on the QPD. The beam seems
to be partially clipped in the chamber.
- Oplev of the IFO mirrors are aligned.
  
  8988   Thu Aug 8 18:47:41 2013 SujanSummaryPEMUsing weiner filters for subtracting signals MC_L and GUR2_XI used MC_L signal from the Mode Cleaner
as the desired signal with  GUR2_X as witness
signals. I observed good subtraction where
 Results.zip 
ELOG V3.1.3-