40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 165 of 355  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  9560   Thu Jan 16 21:38:13 2014 ericqUpdateLSCRepeat of PRC length measurement[ericq,Jenne]
Since we don't have agreement between
the measurements we made the other day and
  
  9559   Thu Jan 16 08:19:29 2014 SteveUpdatePEM4.4 and 3.8M local earth quakes

    

       
            
 local4.4eq.pnglocal3.8eq.png 
  9558   Wed Jan 15 18:42:57 2014 JenneUpdateASCPOP ASC QPD offline for a few hours this afternoonI was in the lab, near the south end of
the ITMX oplev table, looking for something,
and I bumped the POP ASC QPD's power supply. 
  
  9557   Wed Jan 15 18:18:15 2014 GabrieleSummaryLSCPRC length measurement analysis I analyzed the data we took yesterday,
both using AS11 and AS55. For each value
of the phase I estimated the Q/P ratio using
 experimental_data_as11.pdfexperimental_data_as55.pdfsimulation_phase_difference.pdf 
  9556   Wed Jan 15 13:05:30 2014 JenneUpdatePEM4.4 EQ in Fontana, CAIt looks like there was a 4.4 magnitude
earthquake near Fontana, CA around 1:30am
today.  This tripped all of the suspension
  
  9555   Tue Jan 14 19:10:51 2014 GabrieleSummaryLSCPRC length measurement [EricQ, Gabriele]
We could carry out the measurement
of PRC length. The AS110 photodiode was plugged
  
  9554   Tue Jan 14 19:05:48 2014 GabrieleSummaryLSCPRMI locked on sideband[Gabriele, EricQ] 
Finally, we managed to lock PRMI
on sidebands:
  
  9553   Tue Jan 14 10:34:57 2014 SteveUpdatePSLgreen transmission measurmentGariLyn is using our green light on the
west side of the PSL table. The green PDA36As
were moved and the HEPA turned up to 60V
 greenPickUp.jpg 
  9552   Tue Jan 14 10:12:12 2014 SteveUpdatePSLlaser drift monitor set up idea

    

       
            
 bad4thday.png 
  9551   Mon Jan 13 19:31:04 2014 GabrieleSummaryLSCPRMI locking[Gabriele, EricQ]
We wanted to try the PRC length measurement,but
we ended up spending all the afternoon to
  
  9550   Mon Jan 13 16:50:55 2014 SteveUpdateVACMaglev controller needs service

    

       
            
  
  9549   Mon Jan 13 11:08:48 2014 SteveUpdatePSL3 good days of IOO pointing Three good days of IOO pointing:
Friday, Sat and Sun    What
was changed?  May be the clamping on
 3gdPSLpointing.png 
  9548   Sun Jan 12 09:57:24 2014 GabrieleSummaryLSCEffect of PRC length mismatch on error signals

    

       
            
  
  9547   Fri Jan 10 15:33:02 2014 SteveUpdatePSLlaser drift monitor set up idea

    

       
            
 2daysDrift.png 
  9546   Fri Jan 10 15:31:07 2014 ranaSummaryLSCEffect of PRC length mismatch on error signals 
 Its very doubtful that the
MC yaw drift matters for the IFO. That's
  
  9545   Fri Jan 10 10:28:03 2014 SteveUpdatePSLPSL pointing changes  
I looked at IOO QPDs again. QPD_POS
was clamped by one screw. Dog clamp was added
 clamped.png 
  9544   Thu Jan 9 17:58:31 2014 ericqSummaryLSCEffect of PRC length mismatch on error signals[ericq, Gabriele, Manasa]
 We wanted to perform the PRC
length measurement today with an AS11 signal,
  
  9543   Thu Jan 9 17:21:45 2014 ranaUpdateGeneralIFO plan, IPANG telescope

    

       
            
  
  9542   Thu Jan 9 10:34:58 2014 SteveUpdatePSLPSL pointing changes in pitch  IOO QPDs tested in dark, lighted
and open PSL enclosure. The created temperature
change 0.03 C has  effect on monitoring 
 Lfnfdnc.png24hPSLpointing.png 
  9541   Wed Jan 8 19:05:30 2014 GabrieleSummaryLSCEffect of PRC length mismatch on error signals [Gabriele,
EricQ]
 
 as11.pngas55.png 
  9540   Wed Jan 8 17:53:26 2014 manasaUpdateGeneralIFO plan, IPANG telescopeFor the IPANG telescope design, we are
in the 'beyond the Rayleigh range' regime.
So using a single lens to make the beam small
 IPANG_layout.pngIPANG.png 
  9539   Wed Jan 8 16:08:52 2014 ericqSummaryLSCEffect of PRC length mismatch on error signals [ericq,Gabriele]
So, we want an relatively quick measurement
of the PRC length error (with sign!) at the
 phaseVlength.pdf 
  9538   Wed Jan 8 13:46:39 2014 JenneUpdateGeneralIFO plan, PRM baffle

    
        
 PRMcage_6Sept2012.JPG 
  9537   Wed Jan 8 13:01:48 2014 GabrieleSummaryLSCEffect of PRC length mismatch on error signalsI
ran a simulation of a double cavity with
a PRC length mismatched w.r.t. the modulation
 REFL_vs_PRClength.pdf 
  9536   Tue Jan 7 23:53:35 2014 JamieUpdateCDSdaqd can't connect to c1vac1, c1vac2dadq is logging the following error messages
to it's log related to the fact that it can't
connect to c1vac1 and c1vac2:
  
  9535   Tue Jan 7 23:50:27 2014 jamieUpdateCDS/frames space cleared up, daqd stabilizedThe wiper script is done and deleted a
whole bunch of stuff to clean up some space:

controls@fb ~ 0$ /opt/rtcds/caltech/c1/target/fb/wiper.pl
  
  9534   Tue Jan 7 23:24:41 2014 JenneUpdateGeneralIFO plan, list o' things to doIt seems that
the most important short-term task we have
  
  9533   Tue Jan 7 23:13:47 2014 jamieUpdateCDS/frames is full, causing daqd to die


   
        
            
  
  9532   Tue Jan 7 23:09:10 2014 manasaUpdateIOOMC aligned

    

       
            
 WFSdrift.png 
  9531   Tue Jan 7 23:08:01 2014 jamieUpdateCDS/frames is full, causing daqd to die


   
        
            
  
  9530   Tue Jan 7 22:44:45 2014 JenneUpdateCDSdaqd on fb is segfaulting every ~30 secondsThe daqd process is segfaulting and restarting
itself every 30 seconds or so.  It's
pretty frustrating. 
  
  9529   Tue Jan 7 21:00:02 2014 JenneUpdateIOOIP POS, IP ANG alignedAfter locking the arms (after the MC alignment
work), Manasa and I aligned IP POS, IP ANG,
and both end transmission QPDs. 
  
  9528   Tue Jan 7 20:57:41 2014 JenneUpdateIOOMC aligned[Rana, Jenne]
We turned off the WFS servos, and
looked at the MC REFL DC, and saw that it
  
  9527   Tue Jan 7 17:16:04 2014 manasaUpdateIOOMC aligned

    

       
            
 MCspots.png 
  9526   Tue Jan 7 16:41:08 2014 manasaUpdateIOOWFS moving MC suspensions

    

       
            
 2dayMCtrend.pngWFSvsMCsuspensions.png 
  9525   Tue Jan 7 11:11:36 2014 ranaUpdateIOOMC drift 
 NOT drift. The sudden steps
are certainly the result of being kicked.
  
  9524   Tue Jan 7 10:44:13 2014 SteveUpdateIOOMC drift

    

       
            
 2dTrend.pngdriftNotKick.png 
  9523   Mon Jan 6 22:11:46 2014 JenneUpdateLSCPRCL sideband locking still not so happy 
 The PRCL once again doesn't
want to lock on sidebands for me.  I
  
  9522   Mon Jan 6 20:52:09 2014 JenneUpdateIOOMC1/3 kicked this morning at 8:30When I got in this morning at 9-something
(9:45 maybe?), Steve was taking dust photos
on the AS table, of the MC Refl path. 
  
  9521   Mon Jan 6 18:32:17 2014 RANAUpdateIOOMC1/3 kicked this morning at 8:30 The trend shows a big jolt to the
MC1/3 pointing this morning at 8:30.
Was anyone working
 kicked.png 
  9520   Mon Jan 6 16:32:40 2014 KojiSummaryGenerallinux1 RAID crash & recoverySince this configuration change, the daily
backup was speeded up by factor of more than
two.
  
  9519   Mon Jan 6 16:30:31 2014 JenneSummaryPSLPSL pointing monitoringI'm not sure which pointing Rana wanted
to fix today, but here's a measurement of
the MC spots.  They actually look pretty
 MCspots_6Jan2014.png 
  9518   Fri Jan 3 18:21:45 2014 ranaSummaryPSLPSL pointing monitoring 
 I went to the PSL table to
re-align the input pointing to the IMC. After
  
  9517   Fri Jan 3 15:19:39 2014 ranaSummaryPSLPSL pointing monitoring This  PSL_pointing_2013.png 
  9516   Fri Jan 3 11:18:41 2014 SteveSummaryVACpower supply replaced with a short vent

    

       
            
 rebootVENT.png 
  9515   Thu Jan 2 13:35:06 2014 KojiUpdateVAC vacuum monitor is still blankWe probably need to restart the machine,
but I didn't want to touch c1vac1 and c1vac2. 
  
  9514   Thu Jan 2 10:50:24 2014 SteveUpdateVAC vacuum monitor is still blank The date is correct on this monitor.
Last stored RGA scan data Dec 20,
2013
 Help.pngvacation.png20131220lastRGAscan.png 
  9513   Thu Jan 2 10:15:20 2014 JamieSummaryGenerallinux1 RAID crash & recoveryWell done Koji!  I'm very impressed
with the sysadmin skillz.
  
  9512   Wed Jan 1 15:01:29 2014 KojiSummaryGeneralIFO recoveryIFO restart after the recovery of
linux1
Machine recovery in the following
  
  9511   Tue Dec 31 23:19:58 2013 KojiSummaryGenerallinux1 RAID crash & recoveryDec 22 between 6AM and 7AM, physical or
logical failure has occure on the 4th disk
in the RAID array on linux1.
  
ELOG V3.1.3-