40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 164 of 341  Not logged in ELOG logo
    Reply  Wed Aug 22 08:44:09 2018, Steve, Update, General, earth quake yesterday_EQs.png
    Reply  Thu Aug 23 08:24:38 2018, Steve, Update, SUS, ETMX trip follow-up ETMX-UL_glitch.pngPEM_4d.png
    Reply  Fri Aug 24 08:04:37 2018, Steve, Update, General, small earth quake small_EQ.png
    Reply  Fri Aug 24 10:51:23 2018, Steve, Update, VAC, pumpdown 81 at day 38 d38.png
    Reply  Fri Aug 24 14:58:30 2018, Steve, Update, SUS, ETMX trips again glitches.png
    Reply  Mon Aug 27 09:14:45 2018, Steve, Update, PEM, small earth quakes  small_EQs_vs_SUSs.png
    Reply  Tue Aug 28 15:29:19 2018, Steve, Frogs, PEM, Rat is cut rat#2.png.png
    Reply  Wed Aug 29 09:20:27 2018, Steve, Update, SUS, local 4.4M earth quake 4.4_La_Verne.png3.4_&_4.4M_EQ.png
    Reply  Wed Aug 29 09:56:00 2018, Steve, Update, VAC, Maglev controller needs service 
Entry  Wed Aug 29 14:51:05 2018, Steve, Update, General, tomorrow morning 
    Reply  Tue Sep 18 14:02:37 2018, Steve, Update, safety, safety training 
    Reply  Thu Sep 20 08:17:14 2018, Steve, Update, SUS, local 3.4M earth quake local_3.4M.png
    Reply  Wed Sep 26 10:07:16 2018, Steve, Update, VAC, why reboot c1vac1 NOcomm.pngReboot_&_sawp.pngc1vac1&2_.jpg
    Reply  Thu Oct 4 08:25:50 2018, Steve, Update, VAC, rga scan pd81 at day 78 pd81d78.png
    Reply  Fri Oct 12 08:27:05 2018, Steve, Update, VAC, drypump forepump.png
    Reply  Fri Oct 12 17:37:03 2018, Steve, Update, VAC, pressure gauge choices  
    Reply  Mon Oct 15 13:59:42 2018, Steve, Update, VAC, drypump replaced drypump_swap.png
Entry  Wed Oct 17 09:31:24 2018, Steve, Update, PSL, main laser off Inno2wFlipped_off.png
    Reply  Mon Oct 22 15:19:05 2018, Steve, Update, VAC, Maglev controller serviced our_controller_is_back.png
    Reply  Thu Oct 25 16:17:14 2018, Steve, Update, safety, safety training 
Entry  Fri Nov 2 09:47:57 2018, Steve, Metaphysics, Treasure, Zojirushi is dead DSC01773.JPGzoji.JPG
Entry  Fri Nov 2 10:24:20 2018, Steve, Update, PEM, roof cleaning 
Entry  Mon Nov 5 15:55:39 2018, Steve, Metaphysics, Treasure, Zojirushi is dead zoji.JPG
Entry  Tue Nov 6 10:03:02 2018, Steve, Update, Electronics, Contec board found DSC01836.JPG
    Reply  Tue Nov 6 15:32:24 2018, Steve, Update, PSL, MC_Transmitted MC_Trans.png
    Reply  Wed Nov 7 08:32:32 2018, Steve, Update, VAC, c1vac1 FAIL lights on (briefly)...checked Vac_MC_OK.png
    Reply  Tue Nov 13 16:15:01 2018, Steve, Update, VAC, rga scan pd81 at day 119 pd81-d119.pngpd81-560Hz-d119.png
Entry  Wed Nov 14 14:35:38 2018, Steve, Update, ALARM, emergency calling list for 40m Lab  
    Reply  Fri Nov 16 10:26:12 2018, Steve, Update, VAC, single viton O-rings Single-O-ring.png
    Reply  Fri Nov 16 15:09:31 2018, Steve, Configuration, VAC, not venting cryo and ion pumps 
    Reply  Mon Nov 19 17:09:00 2018, Steve, Update, VAC, Vent 81 beforeVent82.pngvent81completed.png
    Reply  Mon Nov 26 15:58:48 2018, Steve, Update, VAC, Vent 81 
    Reply  Tue Nov 27 10:50:20 2018, Steve, Update, PEM, earth quake Mexico 5.5M.Mexico.png
    Reply  Tue Nov 27 17:06:51 2018, Steve, Configuration, VAC, Agilent 84FS turbo installed as TP2 
    Reply  Thu Nov 29 08:13:33 2018, Steve, Update, PEM, EQ 3.9m So CA 3.9mSoCA.pngVac_as_today.pngas_is.png
    Reply  Tue Feb 3 15:20:13 2015, Steve, Koji, Update, VAC, Pneumatic pressure is being read again N2pressureReadingIsBack.png
Entry  Thu Aug 1 16:33:39 2013, Sujan, Update, PEM, Guralp2 seismometer installed at North side of POX table IMG_1213.JPG
Entry  Thu Aug 8 18:43:12 2013, Sujan, Summary, PEM, Optimally subtracting signals from two seismometers. Results.pdf
Entry  Thu Aug 8 18:47:41 2013, Sujan, Summary, PEM, Using weiner filters for subtracting signals MC_L and GUR2_X Results.zip
Entry  Thu Oct 14 23:33:45 2010, Suresh, Update, IOO, 2W NPRO laser output power versus temperature tempscan.pngScan2010.zip
Entry  Fri Oct 15 21:25:23 2010, Suresh, Update, IOO, 2W NPRO laser output power drop question 
Entry  Wed Oct 27 16:15:35 2010, Suresh, Update, SUS, Re-glued magnet to the PRM 
Entry  Wed Oct 27 21:33:42 2010, Suresh, Update, Locking, Green from the far end re-obtained 
Entry  Wed Oct 27 21:51:29 2010, Suresh, Update, PSL, Attenuation of PSL NPRO removed 
Entry  Thu Oct 28 03:21:35 2010, Suresh, Update, Locking, Aligned the MC2 transmission photodiode 
Entry  Tue Nov 2 00:17:01 2010, Suresh, Configuration, Locking, Temporary changes to the Video Mux 
Entry  Thu Nov 4 03:13:46 2010, Suresh, Update, Locking, Fibre coupling 1064nm light at the south-end table 
Entry  Thu Nov 4 19:00:57 2010, Suresh, Update, Locking, Fibre coupling 1064nm light at the south-end table 
Entry  Thu Nov 4 19:26:51 2010, Suresh, Update, Locking, Changes to the Video MUX reversed 
Entry  Mon Nov 8 18:30:33 2010, Suresh, Update, IOO, MC Trans Mon QPD gain increased by 50x 
ELOG V3.1.3-