40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 164 of 350  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  12074   Wed Apr 13 11:00:28 2016 SteveUpdateendtable upgradeX endtable repopulationETMX optical table is grounded to ETMX
chamber through 1 Mohms

The doubling oven temp controller
  
  12082   Tue Apr 19 10:58:53 2016 SteveUpdatesafetysafety scans at PSL & tablesThe PSL had one 1064 nm beam to be blocked
around the north east side. The end enclosures
are fine.
  
  12084   Wed Apr 20 14:36:45 2016 SteveUpdatePEMdusty labIt is worth wiping table top covers. Use
isopropanol soaked lint free wipes.

 
 AP_accm.jpgwiped_AP.jpgtemp-partic_6months.png3_years_PEM.png 
  12086   Thu Apr 21 15:12:38 2016 SteveUpdateVACRGA is not working 




  
  12087   Fri Apr 22 13:58:13 2016 SteveUpdatePEMleaky roof is fixedDan sealed the leak today.

 
 leakyRoof_(2).jpg 
  12088   Mon Apr 25 11:07:06 2016 SteveUpdateSUSspare SOS towerEarth quake stops need viton tips.

Wirestandoffs are still aluminum.
 ETMXreplacment.jpg 
  12089   Tue Apr 26 15:22:35 2016 SteveUpdateendtable upgradeCleaning ETMX vacuum dirty windowGautom is progressing with the layout nicely.
The X-arm transmission window have not seen
cleaning for decades. This should be the
 ETMX-Tvp.jpgETMX-TvpDetail.jpg 
  12091   Wed Apr 27 09:05:10 2016 SteveUpdateGeneralAP viewport 
           
     Sad situation
 APg.jpgAP.jpgAPspiderWebs.jpg 
  12094   Wed Apr 27 15:04:47 2016 SteveUpdateendtable upgradeCleaning ETMX vacuum dirty windowIt looks very promising.

 
 1cETMX-Tcmp.jpg 
  12096   Thu Apr 28 08:49:47 2016 SteveUpdatePEMpossible noise sources schedule
Building:        
Campus (see attached Map)        

       
 Campus_B&W_Map-2.pdf 
  12117   Sun May 15 19:48:08 2016 SteveUpdateVACrun out of N23-4 hrs ago we run out of nitrogen. We
are back to Vacuum Normal

 
 noN2.png 
  12119   Tue May 17 14:46:51 2016 SteveUpdateVACRGA scan at day 595We have good RGA scan now. There was no
scan for 3 months.
 RGAscan595d.pngpd78-560Hz-d600.png 
  12122   Thu May 19 16:29:20 2016 SteveUpdateendtable upgradeOptical layout almost complete 

 
 ETMX_4x3_closed.jpgsealedETMXenclosure.jpg 
  12133   Wed May 25 08:32:55 2016 SteveUpdateSUSlocal EQ 3.5mLocal EQ 3.5 mag  at 2:28 UTC May
24, 2016 Rancho Cucamonga, Ca.....no damage

 
 3.5Cucam.pnglocal3.5cucam.png 
  12134   Wed May 25 11:51:40 2016 SteveUpdatesafetySURF 2016 safety


  
  12141   Tue May 31 16:52:58 2016 SteveUpdatesafetyNONOPlease do not place anything on the top
of the cabinets that is not tied down. It
will end up on our head in an earth quake.
 nono.jpg 
  12142   Wed Jun 1 09:06:38 2016 SteveUpdateLSCNew stands for TransMon/Oplev QPDsMachined from I-beam 6061 T6 Aluminum 5"
x 0.5 x 3.25

 pdIb.PDFpdstand.pdf 
  12144   Wed Jun 1 15:01:56 2016 SteveUpdateSUS wire standoffs updateThere are some issues with 5 mm sapphire
prism Atm5. It will cause  interference
between one of the prisms and the Side OSEM.
 06011603.PDF06011602.PDFsapphire_stand_off_v2.pdfside_OSEM_ETMY.jpg5p2wsf.png 
  12149   Fri Jun 3 14:24:13 2016 SteveUpdateSUSlocal EQ 3.1 mLocal EQ 3.1 mag at Jun 2, 2016 11:06:16
PM UTC, Muscoy CA........no damage

Our STS should seen this shake.
 eq3.1mMuscoyCa.png 
  12157   Wed Jun 8 10:20:14 2016 SteveUpdatesafetySURF 2016 safetyAakash Patil received 40m specific basic
safety training.

  
  12165   Fri Jun 10 09:52:51 2016 SteveUpdateSUS EQ 5.2 mag Borego SpringEQ  5.2 mag at Jun 10, 8:04 am UTC,
Borego Spring, CA  ~150 mi away.........no
obvoius damage, damping restored, MC is locking,
 5.2mBoregoSpring.pngeqBSs.png 
  12170   Mon Jun 13 09:08:17 2016 SteveUpdatePSLPMC slow driftThe PMC transmission slow degration or
it's input beam is not stable.

 
 PMCslowDrift.png 
  12171   Mon Jun 13 10:01:58 2016 SteveUpdateSUSETMX jumps 




 noDamping24hrs.pngETMXjumps.png 
  12174   Tue Jun 14 10:13:34 2016 SteveUpdateVACtemporary N2 supply lineThe drill room floor will be retiled Thursday,
June 16. Temporary nitrogen line set up will
allow emptying the hole area.
 afterN2work.png 
  12182   Wed Jun 15 10:19:10 2016 SteveConfigurationCDSGPS antennas... debuggingVisual
inspection of rooftop GPS antennae:
 6x 
  12186   Thu Jun 16 08:52:14 2016 SteveUpdateGeneralilluminators turned offPSL, BS, ITMY and ETMX the illuminators
were left on over night.
  
  12187   Thu Jun 16 11:10:17 2016 SteveUpdateSUSspare ETMX optics preparation to be hanged



D
Location
 SOSsus_Page_1.pngSOSsus_Page_2.pngETMXspareTowerFace.jpgETMXspareTowerBack.jpgmagnets-dumbbells.jpg 
  12198   Mon Jun 20 08:26:56 2016 SteveUpdatePSLAOM picturesGood job Johannes and Subham.

 
 AOMinplace.jpginplaceAOM.jpgAOMin.png 
  12199   Mon Jun 20 09:36:10 2016 SteveUpdateSUS EQ 3.1 m Big Bear Lake, CANo suspention lost damping.

 
 eq3.1BigBearLakeCA.png 
  12200   Mon Jun 20 11:11:20 2016 SteveConfigurationCDSGPS receiver not resetting properlyI called https://www.endruntechnologies.com/pdf/USM3014-0000-000.pdf 
and they said it's very likely just needs
a software update. They will email Jamie
  
  12209   Tue Jun 21 14:12:10 2016 SteveUpdatePEM vacuum envelope wipedI wiped down the cranes with wet towel
and Mario our janitor did the chamber tops
with the tubes.
 60dPEM.png 
  12216   Mon Jun 27 15:26:03 2016 SteveOmnistructureALARMfire alarm testThe fire alarm came on around 15:05 
for about 2-3 minutes. We all  left
the lab and counted heads.  I called
 fireAlarmTest.png 
  12217   Mon Jun 27 15:47:17 2016 SteveUpdateGeneralQPR clean room glovesI got some
QPR Nitrile gloves. They are LIGO approved.White
nitrile gloves are naturally anti-static-
  
  12218   Tue Jun 28 09:14:27 2016 SteveUpdateSUS ETMX optics preparation to be rehangedGiven the effect on the contrast defect,
the consensus at the meeting Wednesday 6-22 
was that we should continue to use the existing
 nylonFCss.jpg 
  12226   Wed Jun 29 08:20:04 2016 SteveUpdateSUS First Contact shelf life
We'll follow LIGO policy:
Our
policy is to use first contact within 1 year
of purchase for use in the interferometers.
  
  12227   Wed Jun 29 14:32:22 2016 SteveUpdateSUS how to remove epoxy from optics 

Hi Steve -
  
  12228   Wed Jun 29 15:34:00 2016 SteveUpdatesafetySURF 2016 safetyPraful Vasiceddy received 40m specific
basic safety training.

  
  12229   Wed Jun 29 16:02:29 2016 SteveUpdateSUS ETMX beam baffleIn the attached photo from 2012, one can
see the installed black glass baffle. According
to the drawings (LIGO-DNNNXXX) this one has
 IMG_1608.JPG 
  12231   Thu Jun 30 10:03:16 2016 SteveUpdateSUS how to remove epoxy from opticsProposed Acetone soak dish for SOS epoxy
softening.

It has good acces through 5"
 SOSsoakDish.jpgSOSsoakDish_tv.jpg 
  12237   Fri Jul 1 09:20:44 2016 SteveUpdateVACvent 78  VENT
OBJECTIVES:

1, Fix ETMX sus "jump issue"
 vent78.pngvent78at250T.png 
  12238   Fri Jul 1 15:48:10 2016 SteveUpdateVACvent 78 at 710 TorrI just disconnected the 6th instrument
grade air cylinder from the vacuum envelope
at 720 Torr. Now it will reach equilibrium
 pd78at710T.png 
  12241   Tue Jul 5 09:25:31 2016 SteveUpdateSUS how to remove epoxy from opticsGlass soaking dish with teflon guides.




 SOSsoakingDish.jpgSOSsoakingD.jpg 
  12248   Wed Jul 6 08:34:00 2016 SteveUpdateVACRGA scan at day 639The last RGA scan of this pumpdown 78

Pressure plot of 640 days long
pd 78
 RGAscan639d.pngpd78d640.png 
  12249   Wed Jul 6 09:34:26 2016 SteveUpdateGeneralPRM sensing voltage LRYesterday Q noticed that PRM_sensor_LR
was 0.098V  This actually went to ~
zero on 7-3
 PRM_LR.png 
  12250   Wed Jul 6 10:58:07 2016 SteveUpdateVACvent 78 valve configurationVacuum Status: Chamber Open

All chamber annuloses are vented. 
Vac Monitor screen is not communicating with
 CamberOpen.png 
  12264   Thu Jul 7 09:13:54 2016 SteveUpdateSUSSOS gluing fixtureAtm 1,
It's right arm is perfect.

Atm 3-4, The left one has bended
 SOSgluingFixRarmWend.jpgSOSgluingFixRarm.jpgSOSgluingFixLarm45.jpgSOSgluingFixLarm.jpgSOSgluingFixture.jpg 
  12311   Tue Jul 19 15:16:43 2016 SteveUpdatesafetysafety trainingOur new graduate student Lydia received
40m specific safety training.
  
  12312   Tue Jul 19 15:30:08 2016 SteveUpdateGeneralHEPA dryer and dustI set up a simple HEPA filter dryer to
dry your clean room garment before 
you can put it away into your storage box.
 HEPAdryer.jpg 
  12314   Wed Jul 20 11:39:07 2016 SteveUpdateVACvent 78 day 20RGA background scan




 vent78-d20.png 
  12315   Wed Jul 20 13:58:55 2016 SteveUpdateSUSSUS damping out of vac chamberCheater
cable to be used in clean room pitch
gluing alingment.
 ETMXrack.jpgfromETMX-satBox.jpgsusDampingSatboxCab.jpgsusDampingSatboxCabl.jpg 
ELOG V3.1.3-