8669
|
Tue Jun 4 10:44:13 2013 |
Steve | Update | endtable upgrade | PI pzt holders are ready |
The PI pzt holders are back from the shop. They are numbered 1, 2 & 3 and machined to match.
Tapered black delrin opener is to gauge the gap if it is too small to fit pzt. This is to prevent holder to be opened too much. |
Attachment 1: PIpztholders.jpg
|
|
8670
|
Tue Jun 4 10:47:57 2013 |
Steve | Update | safety | safety training |
Our early bird surf student Gautem has received 40m specific basic safety training today. |
8681
|
Wed Jun 5 15:48:02 2013 |
Steve | Update | General | fast 2004 qpd |
Thank you Ben Abbott forwarding this information:
QPD Amplifier D990272 https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?.submit=Number&docid=D990272&version= at the X-end. It plugs into a Generic QPD Interface, D990692, https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?.submit=Number&docid=D990692&version= according to my drawings, that should be in 1x4-2-2A. |
Attachment 1: D990272qpd.jpg
|
|
Attachment 2: interfaceD990692.jpg
|
|
8682
|
Wed Jun 5 15:55:16 2013 |
Steve | Update | General | Projector - lightbulb ordered |
Quote: |
Update: We don't have our BIG screen 
There was no light from the projector when I came in this morning. I suspected it might have to do with the lifetime of the bulb. But turning the projector OFF and ON got the projector working....but only for about 10-15 seconds. The display would go OFF after that. I will wait for some additional help to dismount it and check what the problem really is.
|
-
Shipping Estimate Friday June 7, 2013 - Monday June 10, 2013
Delivery Estimate: Wednesday June 12, 2013 - Monday June 17, 2013 by 8:00pm
-
Sold by: Lampedia
|
8685
|
Thu Jun 6 09:58:13 2013 |
Steve | Update | endtable upgrade | enclosure to chamber connection |
Thin wall connector from McMCarr#55275K25 was tested in 150 mW, 1 mm beam size of 1064 nm overnight. It did not show any degradation.
Super-Compressible Duct for Air
Hose is made from 0.005" thick, double-ply metalized polyester with a fabric-enclosed steel wire support.
Atm2, Enclosure viewport adaptor is shown in place of the viewport.
Soft gaskit - durumeter hardness 10A - McMCarr#9010K51 was added on the 10" od sufaces of conflat and viewport adaptor to insure being air tight.
The duct connector clamped with soft braided elastic " Velstrech" brand loop.
|
Attachment 1: thinwallconnector.jpg
|
|
Attachment 2: 06061301.PDF
|
|
8717
|
Tue Jun 18 10:37:00 2013 |
Steve | Summary | General | new laser pointers |
Red-green laser pointers added to the depleted stock of 2011
The two pointers output measured 4.4 mW green and 2 mW red
|
8732
|
Thu Jun 20 09:33:42 2013 |
Steve | Update | General | cleanup |
Office work benches were cleaned up yesterday. Anti-image filter boards were moved to north wall of the control room. Koji's pd- electronics box placed next to water dispenser.
The removed ETMY optical table: TMC 4' x 2' x 4" with Aluminum enclosure was placed on table in the east arm. |
Attachment 1: tmc3x2.jpg
|
|
8736
|
Fri Jun 21 16:30:04 2013 |
Steve | Update | General | Capacitor Inventory |
The 3 Panasonic Ceramic Kits Books, 1206 NPO, SMT are well stocked. The 4 th one needs to be refilled at some values.
I labeled them on the cover for fast access. See Atm1
The Metalized Polyester Film Book with through holes mount are in good shape also. Atm2
The AVX Ceramic 1206, Garrett cab, range: 1pF - 22 microF 50V...... 67 values
Note here: that the value of dielectric, capacitance / voltage will vary
NPO: 1 pF - 1 nF / 50V .......37 values
X7R : 1 nF - 0.082 microF / 50V, 0.1 microF / 100V.......27 values
Y5V: 4.7 microF / 6.3 V, 10 microF / 10V, 22 microF / 6.3V.........3 values
|
Attachment 1: CeramicCaps1206NPOsmt.jpg
|
|
Attachment 2: PolyesterFilmCapThroughHole250VDC.jpg
|
|
8743
|
Tue Jun 25 10:23:20 2013 |
Steve | Update | safety | surf safety training |
Alex Cole and Craig Cahillane received 40m specific, basic safety training last week.
|
Attachment 1: surfs2014.jpg
|
|
8763
|
Thu Jun 27 10:45:41 2013 |
Steve | Update | General | 40MARS wireless network problems |
Quote: |
Quote: |
I'm not sure what's going on today but we're seeing ~80% packet loss on the 40MARS wireless network. This is obviously causing big problems for all of our wirelessly connected machines. The wired network seems to be fine.
I've tried power cycling the wireless router but it didn't seem to help. Not sure what's going on, or how it got this way. Investigating...
|
I'm still seeing some problems with this - some laptops are losing and not recovering any connection. What's to be done next? New router?
|
We had the same problem yesterday. However the Vacuum Dedicated laptop worked with fewer disconnects. Christian is coming over this after noon to look at this issue.
This happened a few weeks ago and it recovered misteriously. Jamie did not understand it. |
8765
|
Thu Jun 27 15:58:27 2013 |
Steve | Update | PEM | PSL enclosure particle counts |
Particle counts were measured inside the PSL enclosure at 40VAC variac setting.
Directly under HEPAs, on the east half of the optical table : 0.3 micron 20 particles / cu ft, 0.5 micron 0 p / cu ft, 0.7 micron 0 p / cu /ft
Away from the HEPAs, on the west edge of the op table: 0.3 micron 960 particles / cu ft, 0.5 micron 50 p / cu ft, 0.7 micron 20 p / cu ft
We may want to increase the RPM a little bit.
Checked our counters against recently calibrated Met One GT-526:
#1 is right on, #2 measured 25% less (it will go for calibration)
Flow bench at the south end : zero particle for all 3 sizes
IOO chamber particle logging measures 0.5 and 1 micron. Chamber opening limit is set to 10,000 particles max of 0.5 micron
At 10,000 p of 0.5 micron means ~100,000 - 180,000 p of 0.3 micron
We may have to lower the limit. |
8782
|
Fri Jun 28 11:33:32 2013 |
Steve | Update | | 40MARS wireless network problem |
Quote: |
I'm not sure what's going on today but we're seeing ~80% packet loss on the 40MARS wireless network. This is obviously causing big problems for all of our wirelessly connected machines. The wired network seems to be fine.
I've tried power cycling the wireless router but it didn't seem to help. Not sure what's going on, or how it got this way. Investigating...
|
Mike and Christian brought over a Mac laptop for surf Alex.
They power cycled the wireless router of 40Marsh and labtops are working. Seeing 75-80% signals on all 3 Dell lab top sisters at both end of the lab |
8785
|
Fri Jun 28 14:57:15 2013 |
Steve | Update | General | closing lab doors |
I found the south end emergency doors not latched completely. There was a ~ 3/8" vertical gap from top to bottom.
Please pull or push doors harder if they not catch fully. |
8813
|
Tue Jul 9 17:03:06 2013 |
Steve | Update | Green Locking | fiber layed for Y arm |
Alex, Gautam and Steve,
Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.
It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- pvc, slit corrugated loom tubing " 1.5" ID
The fiber is not protected between 1Y1 and 1Y4 |
Attachment 1: fromETMYtowardPSL.jpg
|
|
Attachment 2: fibreETMYtoPSL50m.jpg
|
|
Attachment 3: PSLfiberfromETMY.jpg
|
|
8822
|
Wed Jul 10 14:49:00 2013 |
Steve | Update | Green Locking | more fiber protective tubing layed |
Quote: |
Craig, Gautam and Steve,
Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.
It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- nylon slit corrugated loom tubing " 1.5" ID
The fiber is not protected between 1Y1 and 1Y4
|
Installed 0.5" ID 10 ft long protective tubing at the PSL end of the ETMY fiber this morning. Here I had to cable tie a bunch of cables at the east side of the PSL enclosure.
They were hanging off the table blocking space were the sliding doors move.
At the ETMX end of the X-arm fiber received the same protective tubing. |
Attachment 1: fibreETMXprotectedendOnly.jpg
|
|
8827
|
Thu Jul 11 09:15:10 2013 |
Steve | Update | endtable upgrade | ETMY optable grounded |
ETMY optical table top was grounded to the ETMY chamber through 1 Mohms this morning. I also strain releifed relieved a few cables that were pulling on components directly. |
8828
|
Thu Jul 11 09:24:03 2013 |
Steve | Update | General | there should be nothing left on optable tops |
There are 4 oscilloscopes left on the AP optical table top.... It's only 25 lbs... Do not leave anything on the optical table tops! |
8834
|
Fri Jul 12 09:00:10 2013 |
Steve | Update | General | Halogen illumination cables disconnected |
Alex and Steve,
Old halogen chamber illuminator cabling disconnected and potenciometer board removed at 1Y1 in order to give room for pd calibration fibre set up. |
Attachment 1: 1Y1oldilluminatersDisconnected.jpg
|
|
8847
|
Mon Jul 15 14:12:15 2013 |
Steve | Update | VAC | RGA scan at day 144 |
Pumpdown 75, vacuum normal condition at day 144
|
Attachment 1: pd75mRGA144d.png
|
|
Attachment 2: pd75m144d.png
|
|
8856
|
Tue Jul 16 13:48:26 2013 |
Steve | Update | PEM | cranes cleaned |
Keven and Steve,
The 3 cranes tested and wiped off as preparation for upcoming vent. |
8904
|
Tue Jul 23 08:21:31 2013 |
Steve | Update | VAC | Vent has started |
Thanks for the good preparation. IFO pressure P1=20 Torr |
Attachment 1: beforVent.png
|
|
Attachment 2: startVent.png
|
|
8907
|
Tue Jul 23 14:00:03 2013 |
Steve | Update | VAC | the vent is completed |
The 40m IFO has reached atmospher in 5 hours. It is ready to open chamber condition. The RGA is pumped with the maglev.
P1 pirani gauge is contact dependent as you see it on the linear plot It will be replaced during this vent.
The venting speed was 2-4 Torr / min
Atm2 shows how the BS is sensing the venting air cylinder changes.
The 4th cylinder of instrument grade air bump is overlapping with our janitor working at the BS chamber.
|
Attachment 1: Atm.png
|
|
Attachment 2: 5cyl.png
|
|
Attachment 3: ventSum1d.png
|
|
8915
|
Wed Jul 24 10:35:41 2013 |
Steve | Update | VAC | BS, ITMY doors are removed |
Quote: |
We will open the BS and ITMY doors first thing tomorrow morning. I plan to try to be in around 9 am. The first order of business will be to flip the folding mirrors that are not currently flipped (SR2, SR3, PR3).
|
Jenne, Annalisa & Steve |
Attachment 1: beforeDoorsOff.png
|
|
Attachment 2: particlecount10d.png
|
|
8933
|
Mon Jul 29 16:04:40 2013 |
Steve | Update | VAC | AC removed |
Manasa, Eric, Evan, Koji and Steve,
Access connector removed in order to complete alignment. Light aluminum with acetate windows AC installed.
|
Attachment 1: acout.png
|
|
Attachment 2: AlAcACa.jpg
|
|
Attachment 3: AlAcACb.jpg
|
|
8945
|
Wed Jul 31 09:51:43 2013 |
Steve | Update | safety | Sujan receives safety training |
Sujan got 40m specific basic safety training this morning. |
Attachment 1: IMG_0031.JPG
|
|
8946
|
Wed Jul 31 10:27:00 2013 |
Steve | Update | VAC | instrument grade air is discontinoued |
We have been using Air Liquide Instrument Grade Air for venting the 40m vacuum envelope. It is no longer available.
The replacement is Alphagas 1, total hydrocarbon <0.1% ppm
LINK TO Alphagaz

Air Liquide > ALPHAGAZ™ Specifications

ALPHAGAZ™ Specifications
ALPHAGAZ™ range of Pure Gases for Analysis: two purity levels tailored to cover all your analytical needs.
Because each analytical application is sensitive to critical impurities that can affect your results, tests in our research center and analyzer manufacturers' studies confirm that the main impurities are moisture, oxygen and hydrocarbons.
Based on these critical impurities, Air Liquide has developed ALPHAGAZ™ brand with a Maximum Impurity Level (H2O, O2, CnHm).
- The Maximum Impurity Level is the same across the whole product range. This constitutes a guarantee of quality with regard to major critical impurities and contamination tracers. ALPHAGAZ™ 2 offers an even greater guarantee in terms of purity (CO, CO2, H2).
- The Minimum Total Purity is a prerequisite for product quality, but we do not stop there: Air Liquide selects and controls its gas sources by defining specifications regarding impurities that are critical for your analysis or application.
ALPHAGAZ™ 1 |
ALPHAGAZ™ 1 |
ALPHAGAZ™ 2 |
ALPHAGAZ™ 2 |
ALPHAGAZ™ AUTO IV |
ALPHAGAZ™ CO2 SFC |
He, N2, H2,
Ar, O2 |
Air |
He, N2, H2,
Ar, O2 |
Air |
Air*, N2, O2 |
CO2 |
Specifications (ppm vol): |
H2O < 3 ppm
O2 < 2 ppm
CnHm < 0.5 ppm |
H2O< 3 ppm
CnHm< 0.1 ppm
CO2 < 1 ppm
CO < 1 ppm |
H2O < 0.5 ppm
O2 < 0.1 ppm
CO2 < 0.1 ppm
CO < 0.1 ppm
CnHm < 0.1 ppm
H2 < 0.1 ppm |
H2O < 0,5 ppm
CnHm < 50 ppb
CO2 < 0,1 ppm
CO < 0,1 ppm
NOx < 10 ppb *
SO2 < 10 ppb* |
CnHm < 0.2 ppm
CO2 < 0.5 ppm
CO < 0.5 ppm
NO/NOx < 0.1 ppm |
H2O < 5 ppm
O2 < 2 ppm
CnHm < 2 ppm
NVOC* < 2 ppm
CO < 5 ppm
NO + NO2 < 2 ppm
S Total < 1 ppm
H2 < 0.5 ppm |
|
20 ± 1 % O2 (Europe)
21 ± 1% O2 (North America) |
|
20,9 ± 1 % O2
*: Detection limit |
*20 ± 1 % O2 |
*NVOC: Non Volatile Organic Compounds |
Minimum Total Purity |
|
8953
|
Thu Aug 1 16:03:52 2013 |
Steve | Update | General | reopen BS & IOO |
Quote: |
[Koji, Manasa]
We missed to check that we had the green transmitted to the PSL after flipping the SRC and PRC folding mirrors.
There is no green transmission reaching the PSL even after locking the arms to green.
We should fix this tomorrow. The BS heavy door should come off.
Steve! Do not start pump down tomorrow !
|
We closed the chambers last night with heavy doors and reopened it today. |
Attachment 1: IOOnorth.jpg
|
|
8963
|
Mon Aug 5 10:50:48 2013 |
Steve | Update | VAC | RGA background |
RGA background at day 12 of this vent . The maglev is pumping on the rga through VM2
|
Attachment 1: v75bgMd12.png
|
|
8970
|
Tue Aug 6 10:06:29 2013 |
Steve | Update | VAC | Pumpdown is at 500Torr |
The pumpdown has started at 8:38am
Manasa was here to confirm good alignment of the IFO
Inner jam nuts of AC bellow were torqued to 45 ft/lbs and door nuts were check on opened chambers.
Annulos were roughed down to 500 mTorr
Oplev servos turned off, PSL and green shutters closed before pumpdown started
|
Attachment 1: befPd.png
|
|
8973
|
Tue Aug 6 16:45:31 2013 |
Steve | Update | VAC | Pumpdown is completed |
IFO P1=1mT PSL shutter is opened
|
Attachment 1: 8hrPd76.png
|
|
Attachment 2: 1mT.png
|
|
8976
|
Wed Aug 7 10:51:49 2013 |
Steve | Update | VAC | Pumpdown at 26hrs |
Cold cathode gauge CC1 -h (horizontal) just coming on 9.2e-5 Torr
P2 is the fore line pressure of the maglev. One can see the 4 Torr load during switching over to turbo pumping.
CC4 5e-9 Torr is the performance of the maglev pumping on the RGA only.
The annuloses are not pumped now. They are closed off to see how much outgassing plus leak they have.
Configuration: vacuum normal, annuloses not pumped
Condition: normal
Precondition: 14 days at atm, IOO chamber north door was taken off as a new entrance, the ETMX chamber was not opened.
What is new in the vacuum system: new P1 pirani gauge, gold plated clean allen wrench and ..........what else was dropped?
Note: the wireless laptop did not fail once all day yesterday. I want to give credit to the person who is responsible for this.
|
Attachment 1: 26hr.png
|
|
Attachment 2: 14datm.png
|
|
8978
|
Wed Aug 7 15:36:29 2013 |
Steve | Update | VAC | TP2 drypump replaced |
TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.
Where are the foreline pressure gauges? These values are not on the vac.medm screen.
The new tip seal dry pump lowered the small turbo foreline pressure 10x
TP2fl after 2 day of pumping 65mTorr |
Attachment 1: forelinesPs.jpg
|
|
8984
|
Thu Aug 8 07:57:23 2013 |
Steve | Update | VAC | pumpdown at 48 hrs |
Quote: |
TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.
|
|
Attachment 1: 48hrsPd76.png
|
|
8985
|
Thu Aug 8 10:31:28 2013 |
Steve | Update | VAC | few reminders of this vent |
1, Vacuum envelope grounds must be connected all times! After door removal reconnect both cables immediately.
2, The crane folding had a new issue of getting cut as picture shows.
3, Too much oplev light is scattered. This picture was taken just before we put on the heavy door.
4, We were unprepared to hold the smaller side chamber door 29" od of the IOC
5, Silicon bronze 1/2-13 nuts for chamber doors will be replaced. They are not smooth turning.
|
Attachment 1: GROUND!.jpg
|
|
Attachment 2: bad_Folding.jpg
|
|
Attachment 3: toomuchred.jpg
|
|
Attachment 4: BETTERholder.jpg
|
|
9002
|
Tue Aug 13 07:40:53 2013 |
Steve | Update | CDS | c1iscex needs help |
Sorrensen ps ouput of +15V at rack 1X9 was current limited to 10.3V @ 2A
Increased threshold to 2.1A and the voltage is up to 14.7V |
Attachment 1: c1iscexSick.png
|
|
9003
|
Tue Aug 13 11:04:44 2013 |
Steve | Update | PEM | fluorecent lights |
Our fluorecent lights became obsolete. We'll have change fixtures over to some more energy efficient one. Do you have any recommendation regarding to less noise performer unit?
We may go this direction of LED fluorecent lamps ? |
9011
|
Wed Aug 14 08:24:20 2013 |
Steve | Update | VAC | pumpdown at day 8 |
|
Attachment 1: pd76md8.png
|
|
9013
|
Thu Aug 15 09:34:12 2013 |
Steve | Update | General | Wilcoxon cables rescued |
Eric and Steve,
We removed Wilcoxon Accelerometer PS and Amplifier unit under the BS optical tabel yesterday. The six cabels going to DAQ were labeled and left in place. Gain setting were 100, except channel 3 was 10.
The ~ 40 m long 2 sets of 3 cables were very happy to get their kinks out. Especially the set going just south of ITMX optical table.
We have to take better care of these cables! Your data will be useless this way. |
Attachment 1: rescuedGraycables.jpg
|
|
Attachment 2: wilconoxOut.jpg
|
|
Attachment 3: chanGains.jpg
|
|
9017
|
Fri Aug 16 09:35:18 2013 |
Steve | Update | VAC | Vacuum Normal state recognition is back |
Quote: |
Quote: |
Quote: |
Quote: |
Apparently all of the ION pump valves (VIPEE, VIPEV, VIPSV, VIPSE) opened, which vented the main volume up to 62 mTorr. All of the annulus valves (VAVSE, VAVSV, VAVBS, VAVEV, VAVEE) also appeared to be open. One of the roughing pumps was also turned on. Other stuff we didn't notice? Bad.
|
Several of the suspensions were kicked pretty hard (600+ mV on some sensors) as a result of this quick vent wind. All of the suspensions are damped now, so it doesn't look like we suffered any damage to suspensions.
|
CLOSE CALL on the vacuum system:
Jamie and I disabled V1, VM2 and VM3 gate valves by disconnecting their 120V solenoid actuator before the swap of the VME crate.
The vacuum controller unexpectedly lost control over the swap as Jamie described it. We were lucky not to do any damage! The ion pumps were cold and clean. We have not used them for years so their outgassing possibly accumulated to reach ~10-50 Torr
I disconnected_ immobilized and labelled the following 6 valves: the 4 large ion pump gate valves and VC1, VC2 of the cryo pump. Note: the valves on the cryo pump stayed closed. It is crucial that a warm cry pump is kept closed!
This will not allow the same thing to happen again and protect the IFO from warm cryo contamination.
The down side of this that the computer can not identify vacuum states any longer.
This vacuum system badly needs an upgrade. I will make a list.
|
While I was doing the oil change of the roughing pumps I accidentally touched the 24 V adjustment knob on the power supply.
All valve closed to default condition. I realized that the current indicator was red at 0.2A and the voltage fluctuated from 3-13V
Increased current limiter to 0.4A and set voltage to 24V I think this was the reason for the caos of valve switching during the VME swap.
|
Based on the facts above I reconnected VC1 and VC2 valves. State recognition is working. Ion pumps are turned off and their gate valves are disabled.
We learned that even with closed off gate valves while at atmosphere ion pumps outgass hydrocarbons at 1e-6 Torr level. We have not used them for this reason in the passed 9 rears.
I need help with implementing V1 interlock triggered by Maglev failure signal and-or P2 pressure.
MEDM screen agrees with vacuum rack signs. |
Attachment 1: VacuumNormal.png
|
|
Attachment 2: vacValvesDisabled.jpg
|
|
9024
|
Mon Aug 19 07:53:48 2013 |
Steve | Update | SUS | ETMX damping restored |
ETMX sus damping restored |
9026
|
Mon Aug 19 09:54:13 2013 |
Steve | Update | safety | Masayuki receives safety training |
Masayuki Nakano, a student of Seiji's from ICRR / U Tokyo, is visiting us here at the 40m lab for the next couple months.
He received 40m specific basic safety training this morning. |
9027
|
Mon Aug 19 10:03:17 2013 |
Steve | HowTo | General | how not to leave a cable |
We can not leave cables connected like this. This is a burned toast award. |
Attachment 1: NONOcable.jpg
|
|
9029
|
Mon Aug 19 11:12:54 2013 |
Steve | Update | VAC | RGA scan at day 13 |
|
Attachment 1: rgaScan13d.png
|
|
9034
|
Mon Aug 19 17:40:32 2013 |
Steve | Update | Green Locking | Xend green layout corrections |
Shutter moved, no more clipping.
Pick-off mirror 2" replaced by 1" one. Laseroptik HR 532nm, incident angle 30-45 degrees, AR 532 nm
Green REFL PD moved to 4" close to pick-off mirror. Pd being close to pick-off does not separate multiple reflections on it. I'll replace Laseroptic mirror with Al one. It is not easy to find.
Hole cut into side wall for doubler oven cable to exit.
|
Attachment 1: beforeC.jpg
|
|
Attachment 2: nowC.jpg
|
|
Attachment 3: stillMultiple.jpg
|
|
9039
|
Tue Aug 20 10:59:15 2013 |
Steve | Update | Green Locking | Xend green layout corrections |
Quote: |
Shutter moved, no more clipping.
Pick-off mirror 2" replaced by 1" one. Laseroptik HR 532nm, incident angle 30-45 degrees, AR 532 nm
Green REFL PD moved to 4" close to pick-off mirror. Pd being close to pick-off does not separate multiple reflections on it. I'll replace Laseroptic mirror with Al one. It is not easy to find.
Hole cut into side wall for doubler oven cable to exit.
|
Beam trap for Pd refl is in place. Cabeling is ti·died up.
Laseroptic 1" mirror is replaced by Al 1" mirror. Problem remains the same. This diffraction patter has to be coming from the Faraday.
Atm1, good separation when Pd is far 
Atm2, bad separation when Pd is close  |
Attachment 1: faraway.jpg
|
|
Attachment 2: closer.jpg
|
|
9083
|
Wed Aug 28 11:15:02 2013 |
Steve | Update | Green Locking | Xend green layout corrections |
Quote: |
Quote: |
Shutter moved, no more clipping.
Pick-off mirror 2" replaced by 1" one. Laseroptik HR 532nm, incident angle 30-45 degrees, AR 532 nm
Green REFL PD moved to 4" close to pick-off mirror. Pd being close to pick-off does not separate multiple reflections on it. I'll replace Laseroptic mirror with Al one. It is not easy to find.
Hole cut into side wall for doubler oven cable to exit.
|
Beam trap for Pd refl is in place. Cabeling is ti·died up.
Laseroptic 1" mirror is replaced by Al 1" mirror. Problem remains the same. This diffraction patter has to be coming from the Faraday.
Atm1, good separation when Pd is far 
Atm2, bad separation when Pd is close 
|
The extra high post 3.375" for PZT is ready. We also have 2 more 2" green Laseroptik mirrors. I'm ready to swap them in.
The 75 mm focal length lens was placed in front of the green REFL PD yesterday. |
9084
|
Wed Aug 28 11:23:41 2013 |
Steve | Update | VAC | crane repair sheduled |
Quote: |
1, Vacuum envelope grounds must be connected all times! After door removal reconnect both cables immediately.
2, The crane folding had a new issue of getting cut as picture shows.
3, Too much oplev light is scattered. This picture was taken just before we put on the heavy door.
4, We were unprepared to hold the smaller side chamber door 29" od of the IOC
5, Silicon bronze 1/2-13 nuts for chamber doors will be replaced. They are not smooth turning.
|
Fred Goldbar of KoneCranes will come 7:30am Wednesday, September 4 to look at this issue.
It is changed to Thursday morning. |
9085
|
Wed Aug 28 15:41:42 2013 |
Steve | Update | VAC | RGA scan at day 23 |
Valve configuration: Vacuum Normal
pd76-m-d23
|
Attachment 1: pd75md23.png
|
|
9092
|
Fri Aug 30 14:31:57 2013 |
Steve | Update | General | cleaning up |
I cleaned up around MC2 and 1Y1 area this morning.
ETMY NPRO moved from the side to the center of the low shelf. Thorlab catalog " as spacer " removed after lunch.
The Lightwave Controller values: LT 40.4C, LTEC +0.1V, T 41.041C, Pwr 239 mW, Adj 0, DC 1.82A, DPM 0.0V, Neon OFF, Ldon OFF, Display 5, DT 21.0C, Dtec +1.0V
|
Attachment 1: MC2areaCP.jpg
|
|
Attachment 2: 1Y1areaCleanedUp.jpg
|
|
Attachment 3: ETMY_NPROmoved.jpg
|
|
9097
|
Tue Sep 3 10:54:33 2013 |
Steve | HowTo | General | How To Coil Cables |
B grade Nobel is awarded.
If cables could dream?
This skill should be mandatory for LIGOX graduates. |