Entry  Fri Jul 25 13:30:53 2008, Sharon, Update, , Changes in ASS computer 
Entry  Fri Jul 25 17:32:46 2008, Sharon, Update, , ASS computer 
Entry  Mon Jul 28 12:02:32 2008, Sharon, Update, , accelerometers settings 
Entry  Mon Jul 28 17:58:05 2008, Sharon, Update, , TOP screen changes 
Entry  Tue Jul 29 21:04:55 2008, Sharon, Update, , OSEM's Power Spectrum 8x
Entry  Wed Jul 30 12:36:19 2008, Sharon, Update, , Weekly update 
Entry  Fri Aug 8 11:04:34 2008, Sharon, Update, , MCL Wiener filter m_per_m.png
Entry  Fri Aug 15 16:45:43 2008, Sharon, Update, , Converting from FIR to IIR fir2iir50.pngfir2iir400.pngfir2iir1000.png
Entry  Tue Aug 19 10:36:34 2008, Sharon, Update, , Calibrating accelerometers 
Entry  Tue Aug 19 14:25:38 2008, Sharon, Update, PEM, Accelerometer's calibration - update acccalibafter.pngacccalibbefore.png
Entry  Tue Aug 19 17:00:19 2008, Sharon, Update, , Wiener TF calibration - update m_per_m.png
Entry  Tue Aug 19 17:15:34 2008, Sharon, Update, , MEDM 
Entry  Wed Aug 20 17:02:01 2008, Sharon, Update, , More FIR to IIR  polefit1.pdf
Entry  Fri Aug 22 13:58:39 2008, Sharon, Summary, , Trend of the Wiener TF Same_start_time1.pdfsame_length.pdf
Entry  Tue Jun 21 00:38:21 2011, Sonali, Update, Green Locking, repositioned "QPDY_PD" ETMY_table_2011_June20.pngETMY_table_change1.jpg
Entry  Wed Jun 22 01:59:43 2011, Sonali, Update, Green Locking, fibre-coupling of the IR beam  ETMY_june_21.jpgcollimation_700nm_21_june.JPG
Entry  Thu Jun 23 02:12:12 2011, Sonali, Update, Green Locking, work schedule. 
Entry  Sat Jun 25 00:00:28 2011, Sonali, Update, Green Locking, Fibre Coupling. Fibre_coupling_successful_24_june.jpgBeam_output_on_screen.jpg
Entry  Tue Jun 28 16:52:37 2011, Sonali, Update, Green Locking, Routing of fibre to PSL complete. coupled_fibre.jpgthe_fibre_route.jpgETMY_aftr_fibre_coupling2.png
Entry  Fri Jul 15 17:42:21 2011, Sonali, Update, Green Locking, PSL layout for superposition of the PSL,ETMX and ETMY beams. PSL_change1.pdfPSLnewspace1.pdf
Entry  Wed Jul 20 10:10:19 2011, Sonali, Update, Green Locking, Weekly summary 
Entry  Wed Jul 27 01:57:28 2011, Sonali, Update, Green Locking, Weekly Summary 
Entry  Thu Jul 28 13:51:00 2011, Sonali, Update, Green Locking, ZHL-32A-S. 
Entry  Thu Jul 28 19:49:12 2011, Sonali, Update, PSL, PMC trans beam aligned. 
Entry  Tue Aug 8 10:27:22 2023, Stella Kraus, Update, Lab Organization, Moved HF2LI IMG_7669.JPG
Entry  Wed Jun 24 11:20:40 2009, Stephanie, Update, General, Multiply Resonant EOM Update EOM_CktDiagram.JPGEOM_VoltagePlot.JPG
Entry  Wed Jul 1 11:00:52 2009, Stephanie, Update, General, Multiply Resonant EOM Update EOMCKT.pngPR1_VoltagePlot.pdf
Entry  Wed Jul 8 10:56:04 2009, Stephanie, Update, General, Multiply Resonant EOM Update DSC_0566.JPGInitialBuiltCkt.pdfBuiltCkt_ExpectedResponse.png
Entry  Wed Jul 15 12:11:17 2009, Stephanie, Update, General, Multiply Resonant EOM Update MeasuredTransferFunction_R.jpgBuiltCkt_ExpectedResponse.pngMeasuredTransferFunction.jpg
Entry  Wed Jul 15 18:35:11 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt1_Final.pngBuiltCkt1_TransferFunctions.png
Entry  Wed Jul 22 11:08:36 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt_Picture.pngBuiltCkt2_Final.png1stSegment.png2ndSegment_ExtraL.pngComplete_ExtraL.png
Entry  Fri Jul 24 17:47:52 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt2_Picture_Simplified.pngBuiltCkt2_Simplified.pngSimplified.png
Entry  Wed Jul 29 12:00:49 2009, Stephanie, Update, General, Multiply Resonant EOM Update ImpedanceTestingPhysicalSetup.pngImpResponses.pngImpedanceTestingSetup.pngImpedanceTestingCktDiagram.png1nF.png
Entry  Fri Jul 31 09:52:38 2009, Stephanie, Update, General, Multiply Resonant EOM Update BuiltCkt2_Simplified_EOM.pngImpedanceAG4395A_with10pF.pngBuiltCkt2_Simplified_EOM_R.pngImpedanceAG4395A_withEOM.png
Entry  Fri Jul 31 11:04:42 2009, Stephanie, Update, General, Multiply Resonant EOM Update BoxPic.pngBoxPic2.png
Entry  Wed Aug 5 11:49:49 2009, Stephanie, Update, General, Multiply Resonant EOM Update OSASetup.pngSMAPic.pngWithSMA.png
    Reply  Wed Aug 5 15:18:12 2009, Stephanie, Update, General, Multiply Resonant EOM Update SMA.png
    Reply  Thu Aug 6 19:54:04 2009, Stephanie, Update, PSL, HEPAs back to normal 
Entry  Tue Aug 11 14:15:28 2009, Stephanie, Update, General, Multiply Resonant EOM Update 
Entry  Wed Aug 12 12:08:16 2009, Stephanie, Update, General, Multiply Resonant EOM Update Modulation.pngLinearity.pngLinearity_V.png
    Reply  Thu Sep 9 09:54:41 2021, Stephen, Summary, BHD, BHD OMC invacuum wiring - cable lengths bhd_cable_length_check_cable_bracket_to_components.pngbhd_cable_length_check_flange_to_cable_bracket.pngbhd_cable_length_check_cable_bracket_to_omc_bracket.png
Entry  Fri Oct 1 12:12:54 2021, Stephen, Update, BHD, ITMY (3002) CAD layout pushed to Box 3002_20211001_ITMY_BHD_for_Koji_presentation_images.easm40m_upgrade_layout_20200611-ITMY_Beam_Dim.pdf
Entry  Wed Oct 21 16:18:12 2009, Steve, Summary, SAFETY, LIGO Safety Officers visited the 40m  
Entry  Fri Feb 3 20:58:56 2012, Steve, Configuration, General, Illuminator Picture P1080526.JPG
Entry  Tue Aug 14 08:43:42 2012, Steve, Update, IOO, laser off and on 1day.png
    Reply  Tue Aug 14 14:26:40 2012, Steve, Update, Cameras, cameras touched up cameras.png
    Reply  Fri Aug 17 08:33:46 2012, Steve, Update, Cameras, video cameras in the dark dark.jpg
    Reply  Fri Aug 17 10:38:15 2012, Steve, Update, Cameras, video cameras in the dark 
    Reply  Mon Aug 20 09:49:01 2012, Steve, Update, Cameras, video cameras in the DARK onlyOSEMs.jpgOSEMsand_IR.jpgOSEMsandOplev633.jpg
Entry  Mon Aug 20 11:36:44 2012, Steve, Update, SUS, ETMX is not happy 