  10568   Mon Oct 6 10:23:43 2014 SteveUpdateVACUnexpected power shutdown

Quote:

We had an unexpected power shutdown for 5 sec at ~ 9:15 AM.

Chiara had to be powered up and am in the process of getting everything else back up again.

Steve checked the vacuum and everything looks fine with the vacuum system.

PSL Innolight laser and the 3 units of IFO air conditions turned on.

The vacuum system reaction to losing power: V1 closed and Maglev shut down. Maglev is running on 220VAC so it is not connected to VAC-UPS.  V1 interlock was triggered by Maglev "failure" message.

Maglev was reset and started. After Chiara was turned on manually I could bring up the vac control screen through Nodus and opened V1

"Vacuum Normal" valve configuration was recovered instantly.

 

Chiara needs UPS 

It is arriving Thursday

  10576   Tue Oct 7 16:17:15 2014 SteveUpdateGeneralreason for 8 sec power outage

Quote:

We had a unexpected power shutdown for 5 sec at ~ 9:15 AM.

Chiara had to be powered up and am in the process of getting everything else back up again.

Steve checked the vacuum and everything looks fine with the vacuum system.

 

There was an equipment malfunction in one of Pasadena's substation that caused the outage. After about an 8 second delay, back up circuits restored power. This affected about 1/2 of the campus.

Mike 

-----Original Message-----
From: Steve Vass [mailto:steve@ligo.caltech.edu] 
Sent: Tuesday, October 07, 2014 2:18 PM
To: Anchondo, Michael
Subject: 5s

Hi Mike,

Can you tell me about yesterday's power outage?

Thanks, Steve
  10579   Tue Oct 7 16:55:16 2014 SteveUpdateVACUnexpected sweaty valves

 Pump  spool valves V5, V4, V3 sweating a lot. VM3 and VC2 not so much.

They are VAT valves F28-62887-03, 11, 14 and so on ~15-16 years old.

 I'm speculating that some plastic is aging-braking down at the atmospheric-pneumatic side of valves.
The vacuum side is not effected, according to vacuum pressure readings.

May be some condensation from the small turbos? No

I'm looking for an identical valve to examine, but I can not find one.

We are using industrial grade 99.96% Nitrogen to actuate these valves.

Valves are not effected are  dry: VA6, V6, V7 and all annuloses.

 

Attachment 1: sweatyV5.jpg
sweatyV5.jpg
Attachment 2: sweatyV5f.jpg
sweatyV5f.jpg
  10584   Wed Oct 8 08:46:57 2014 SteveUpdateVACVAT valves actuator lubricant

Quote:

 Pump  spool valves V5, V4, V3 sweating a lot. VM3 and VC2 not so much.

They are VAT valves F28-62887-03, 11, 14 and so on ~15-16 years old.

 I'm speculating that some plastic is aging-braking down at the atmospheric-pneumatic side of valves.
The vacuum side is not effected, according to vacuum pressure readings.

May be some condensation from the small turbos? No

I'm looking for an identical valve to examine, but I can not find one.

We are using industrial grade 99.96% Nitrogen to actuate these valves.

Valves are not effected are  dry: VA6, V6, V7 and all annuloses.

 

VAT's answer:

Yes, our engineers are aware of this issue.  They say:

The pneumatic actuator needs lubricant as the O-ring (Viton) slides in the cylinder. Without grease the O-ring would be abraded and leaking after only a relatively few cycles.  The lubricant used in our pneumatic actuators is an emulsion of oil and Teflon flakes.   Vibration, many cycles and sometimes high temperature lead to the separation of the oil and Teflon.   That is apparently the issue you are seeing.

VAT is and has been testing and qualifying new lubricants, and this is one of the factors we are always looking to improve.  The formula we used 15 years ago in these valves seems to have performed reasonable  well.  Our formula today should perform even better.

We realize this explanation does not help you with these existing valves, but 15 years of service is not too bad is it? 

Steve -NOTE:bonnet seal is metal so there is no way this oil can get into our vacuum ( only if the bellow leaks )

  10587   Thu Oct 9 11:56:35 2014 SteveUpdateVACPower outage II & recovery

Quote:

Post 30-40min unexpected power outage this morning, Steve checked the status of the vacuum and I powered up Chiara.

I brought back the FE machines and keyed all the crates to bring back the slow machines but for the vac computers.

c1vac1 is not responding as of now. All other computers have come back and are alive.

 

 IFO vacuum, air condition and PMC HV are still down. PSL out put beam is blocked on the table.

  10590   Thu Oct 9 17:33:28 2014 SteveUpdateVACPower outage II & recovery

Quote:

Quote:

Post 30-40min unexpected power outage this morning, Steve checked the status of the vacuum and I powered up Chiara.

I brought back the FE machines and keyed all the crates to bring back the slow machines but for the vac computers.

c1vac1 is not responding as of now. All other computers have come back and are alive.

 

 IFO vacuum, air condition and PMC HV are still down. PSL out put beam is blocked on the table.

 We are pumping again. This is a temporary configuration. The annuloses are at atmosphere. The reset reboot of c1Vac1 and 2 opened everything except the valves that were disconnected.

TP2 lost it's vent solenoid power supply and dry pump during the power outage.

They were replaced but the new small turbo controller is not set up as the old TP2 was so it does not allow V4 to open. 

Tomorrow I will swap back the old controller,  pump down the annuloses and close off the ion pumps.

I removed the beam block from the PSL table and opened the shutter. CC4 has the real pressure 2e-5 Torr  

CC1 is not real.

Attachment 1: pumpingAgain.png
pumpingAgain.png
  10596   Fri Oct 10 14:27:44 2014 SteveUpdateCDSc1Vac1 and c1vac2 reboot was a failure

Quote:

Quote:

 

 I have brought back c1auxex and c1auxey.  Hopefully this elog will have some more details to add to Rana's elog 10015, so that in the end, we have the whole process documented.

The old Dell computer was already in a Minicom session, so I didn't have to start that up - hopefully it's just as easy as opening the program.

I plugged the DB9-RJ45 cable into the top of the RJ45 jacks on the computers.  Since the aux end station computers hadn't had their bootChanges done yet, the prompt was "VxWorks Boot" (or something like that).  For a computer that was already configured, for example the psl machine, the prompt was "c1psl", the name of the machine.  So, the indication that work needs to be done is either you get the Boot prompt, or the computer starts to hang while it's trying to load the operating system (since it's not where the computer expects it to be).  If the computer is hanging, key the crate again to power cycle it.  When it gets to the countdown that says "press any key to enter manual boot" or something like that, push some key.  This will get you to the "VxWorks Boot" prompt. 

Once you have this prompt, press "?" to get the boot help menu.  Press "p" to print the current boot parameters (the same list of things that you see with the bootChange command when you telnet in).  Press "c" to go line-by-line through the parameters with the option to change parameters.  I discovered that you can just type what you want the parameter to be next to the old value, and that will change the value.  (ex.  "host name   : linux1   chiara"   will change the host name from the old value of linux1 to the new value that you just typed of chiara). 

After changing the appropriate parameters (as with all the other slow computers, just the [host name] and the [host inet] parameters needed changing), key the crate one more time and let it boot.  It should boot successfully, and when it has finished and given you the name for the prompt (ex. c1auxex), you can just pull out the RJ45 end of the cable from the computer, and move on to the next one.

 

 Koji, Jenne and Steve

 

Preparation to reboot:

1, closed VA6, V5 disconnected cable to valves ( closed all annuloses )

2, closed V1, disconnected it and stopped Maglev rotation

3, closed V4, disconnected its cable

   See Atm1,  This set up is insured us so there can not be any accidental valve switching to vent the vacuum envelope if reboot-caos strikes.[moving=disconnected]

4, RESET c1Vac1 and c1Vac2 one by one and together. They both went at once. We did NOT power recycled.

    Jenne entered the new "carma" words on  the old Dell laptop and checked the good answers. The reboot was done.

    Note: c1Vac1 green-RUN indicator LED is yellow. It is fine as yellow.

5, Checked and TOGGLED valve positions to be correct value ( We did not correct the the small turbo pumps monitor positions, but they  were alive )

6,  V4 was reconnected and opened. Maglev was started.

7,  V1 cable reconnected and opened at full rotation speed of 560 Hz

8,  V5 cable reconnected,  valve opened..............VA6 cable connected and opened........

9,   Vacuum Normal valve configuration was reached.

 

 Yesterday's  reboot was prepared as stated above with one difference. 

  c1Vac1 and c1Vac2 were DOWN before reset. The disconnected valves stayed closed (plus VC1) . This saved us, so the main volume was not vented.

  All others OPENED. PR1 and PR2  rouphing pumps turned ON.  Ion pumps gate valve opened too. The ion pumps did not matter either because they were pump down recently.

  We'll have to rewrite how to reboot vacuum.

  

 

 

 

Attachment 1: c1vac1resetReboot.png
c1vac1resetReboot.png
Attachment 2: c1Vac1&2down.jpg
c1Vac1&2down.jpg
  10597   Fri Oct 10 14:41:04 2014 SteveUpdateVACPower outage II & recovery

Quote:

Quote:

Quote:

Post 30-40min unexpected power outage this morning, Steve checked the status of the vacuum and I powered up Chiara.

I brought back the FE machines and keyed all the crates to bring back the slow machines but for the vac computers.

c1vac1 is not responding as of now. All other computers have come back and are alive.

 

 IFO vacuum, air condition and PMC HV are still down. PSL out put beam is blocked on the table.

 We are pumping again. This is a temporary configuration. The annuloses are at atmosphere. The reset reboot of c1Vac1 and 2 opened everything except the valves that were disconnected.

TP2 lost it's vent solenoid power supply and dry pump during the power outage.

They were replaced but the new small turbo controller is not set up as the old TP2 was so it does not allow V4 to open. 

Tomorrow I will swap back the old controller,  pump down the annuloses and close off the ion pumps.

I removed the beam block from the PSL table and opened the shutter. CC4 has the real pressure 2e-5 Torr  

CC1 is not real.

 Tp2 is controlled by old controller. Annuloses pumped down. Valve configuration: "vacuum normal "

  Ion pumps closed at  <1e-4 mT

Attachment 1: recovery_poweroutage.png
recovery_poweroutage.png
  10599   Mon Oct 13 14:44:52 2014 SteveUpdateVACRGA scan pd78 -day 13

 Our first RGA scan since May 27, 2014 elog10585

 The Rga is still warming up. It was turned on 3 days ago as we recovered from the second power outage.

 

Attachment 1: RGAscan13Oct2014.png
RGAscan13Oct2014.png
  10658   Fri Oct 31 15:34:47 2014 SteveUpdatePSLPSL HEPAs are running again

Quote:

The PSL HEPA stopped working while it was running at 80%. I have closed the PSL enclosure.

Steve is working to fix this.

 The Variac burned out and it was replaced. Each unit was checked out individually. HEPA -north is still noisy at full speed.

Attachment 1: HepaVariac.jpg
HepaVariac.jpg
  10677   Thu Nov 6 10:18:12 2014 SteveUpdateGeneralfiber insulation in cable tray

Quote:

[Steve, Diego, Manasa]

Since the beatnotes have disappeared, I am taking this as a chance to put the FOL setup together hoping it might help us find them.

Two 70m long fibers now run along the length of the Y arm and reach the PSL table.

The fibers are running through armaflex insulating tubes on the cable racks. The excess length ~6m sits in its spool on the top of the PSL table enclosure.

Both the fibers were tested OK using the fiber fault locator. We had to remove the coupled end of the fiber from the mount and put it back in the process. So there is only 8mW of end laser power at the PSL table after this activity as opposed to ~13mW.  This will be recovered with some alignment tweaking.

After the activity I found that the ETMY wouldn't damp. I traced the problem to the ETMY SUS model not running in c1iscey. Restarting the models in c1iscey solved the problem.

 

 AP Armaflex  tube 7/8" ID X 1" wall insulation for the long fiber in wall mounted cable trays installed yesterday.

The 6 ft long sections are not glued. Cable tied into the tray pressed against one an other, so they are air tight. This will allow us adding more fibers later.

 Atm2: Fiber PSL ends  protection added on Friday.

 

Attachment 1: APT07810.jpg
APT07810.jpg
Attachment 2: fromYend.jpg
fromYend.jpg
  10678   Thu Nov 6 11:40:58 2014 SteveUpdateGeneralHe/Ne telescope

Liyuan is measuring the He/Ne telescopes in the Y arm between the tube and CES wall. He'll be here till 1pm

  10684   Fri Nov 7 10:29:56 2014 SteveUpdateGeneralHe/Ne telescope

Quote:

Liyuan is measuring the He/Ne telescopes in the Y arm between the tube and CES wall. He'll be here till 1pm

 Liyuan is continuing his measurement in the Y arm till noon today.

  10691   Mon Nov 10 07:36:35 2014 SteveUpdateSUSPRM damping recovered

PRM sus damping recovered and PMC locked.

  10714   Fri Nov 14 08:25:29 2014 SteveUpdateSUSmorning issues

PRM, SRM and the ENDs are kicking up.  Computers are down.  PMC slider is stuck at low voltage.

Attachment 1: morning.png
morning.png
  10716   Fri Nov 14 15:26:45 2014 SteveUpdatesafetyDiego gets safety traning

Diego Bersanetti received 40m specific safety training today.

  10738   Mon Dec 1 07:30:29 2014 SteveUpdateSUSETMX damping restored

ETMX sus damping restored and PMC locked manually.

  10739   Mon Dec 1 15:41:38 2014 SteveUpdateGeneralX end fiber insulated and on cable tray

Quote:

Quote:

Quote:

[Steve, Diego, Manasa]

Since the beatnotes have disappeared, I am taking this as a chance to put the FOL setup together hoping it might help us find them.

Two 70m long fibers now run along the length of the Y arm and reach the PSL table.

The fibers are running through armaflex insulating tubes on the cable racks. The excess length ~6m sits in its spool on the top of the PSL table enclosure.

Both the fibers were tested OK using the fiber fault locator. We had to remove the coupled end of the fiber from the mount and put it back in the process. So there is only 8mW of end laser power at the PSL table after this activity as opposed to ~13mW.  This will be recovered with some alignment tweaking.

After the activity I found that the ETMY wouldn't damp. I traced the problem to the ETMY SUS model not running in c1iscey. Restarting the models in c1iscey solved the problem.

 

 AP Armaflex  tube 7/8" ID X 1" wall insulation for the long fiber in wall mounted cable trays installed yesterday.

The 6 ft long sections are not glued. Cable tied into the tray pressed against one an other, so they are air tight. This will allow us adding more fibers later.

 Atm2: Fiber PSL ends  protection added on Friday.

 

[Steve, Manasa] 

Two 70m long fibers are now running through armaflex insulating tubes along the X arm on the cable racks. The excess length of the fiber sits in its spool on top of the PSL enclosure. 

Fibers were checked after this with the fiber fault locator (red laser) and found OK.

 X-arm  AP Armaflex tube insulation is cable tightened into cable tray. Only turning 6 ft sections are taped together.

Remaining things to do: install ends protection tubing

  10741   Mon Dec 1 17:13:57 2014 SteveUpdateVACRGA scan pd78 -day 63

Quote:

 Our first RGA scan since May 27, 2014 elog10585

 The Rga is still warming up. It was turned on 3 days ago as we recovered from the second power outage.

 

 

Attachment 1: RGAscanD63.png
RGAscanD63.png
  10750   Wed Dec 3 08:36:49 2014 SteveUpdateLSCgood IFO status
Attachment 1: goodStatus.png
goodStatus.png
  10781   Thu Dec 11 15:40:04 2014 SteveUpdatesafetysafety training

 

 Katherine Dooley has received 40m specific basic safety training in the 40m lab

  10790   Fri Dec 12 10:38:22 2014 SteveUpdatePEMleaky roof

The first real rain of this year finds only one leak at the 40m

Attachment 1: leakyroof.jpg
leakyroof.jpg
  10837   Tue Dec 23 14:33:24 2014 SteveUpdateVACChiara gets UPS

Quote:

Quote:

We had an unexpected power shutdown for 5 sec at ~ 9:15 AM.

Chiara had to be powered up and am in the process of getting everything else back up again.

Steve checked the vacuum and everything looks fine with the vacuum system.

PSL Innolight laser and the 3 units of IFO air conditions turned on.

The vacuum system reaction to losing power: V1 closed and Maglev shut down. Maglev is running on 220VAC so it is not connected to VAC-UPS.  V1 interlock was triggered by Maglev "failure" message.

Maglev was reset and started. After Chiara was turned on manually I could bring up the vac control screen through Nodus and opened V1

"Vacuum Normal" valve configuration was recovered instantly.

 

Chiara needs UPS 

It is arriving Thursday

 EricQ and Steve,

Steve preset the vacuum for safe-reboot mode with C1vac1 and C1vac2 running normal: closed valves as shown, stopped Maglev & disconnected valves V1 plus valves with moving labels.

(The position indicator of the valves changes to " moving " when its cable disconnected )

Eric shut down Chiara, installed APC's UPS Pro 1000 and restarted it.

All went well. Nothing unexpected happened. So we can conclude that the vacuum system with running C1vac1 and C1vac2 is not effected by Chiara's losing AC power.

Attachment 1: prepUP.png
prepUP.png
  10838   Tue Dec 23 15:37:32 2014 SteveUpdateVACTP3 drypump replaced

Quote:

Quote:

 

 TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.

Where are the foreline pressure gauges? These values are not on the vac.medm screen.

The new tip seal dry pump lowered the small turbo foreline pressure 10x

TP2fl after 2 day of pumping 65mTorr

 TP2 dry pump replaced at fore pump pressure 1 Torr,  TP2 50K_rpm 0.34A

 Top seal life 6,362 hrs

 New seal performance at 1 hr  36 mTorr, 

 Maglev at 560 Hz, cc1 6e-6 Torr

 

 TP3 dry pump  replaced at 540 mT as TP3 50K_rpm 0.3A with annulos load. It's top seal life time was 11,252 hrs

 

 

  10843   Fri Dec 26 17:45:21 2014 SteveUpdateVACvac pressure rose to 1.3 mTorr

We run out of N2 for the vacuum system. The pressure peaked at 1.3 mTorr with MC locked. V1 did not closed because the N2 pressure sensor failed.

We are back to vac normal. I will be here tomorrow to check on things.

Attachment 1: noN2.png
noN2.png
Attachment 2: backtoVacNormal.png
backtoVacNormal.png
  10845   Sun Dec 28 07:29:16 2014 SteveUpdateVACvacuum is normal

Quote:

We run out of N2 for the vacuum system. The pressure peaked at 1.3 mTorr with MC locked. V1 did not closed because the N2 pressure sensor failed.

We are back to vac normal. I will be here tomorrow to check on things.

 ITMX damping restored.

Attachment 1: 3d.png
3d.png
  10850   Sun Jan 4 12:49:18 2015 SteveUpdateSUSrecent earthquakes

All suspensions were tripped. Damping were restored. No obvious sign of damage. BS OSEM-UR may be sticking ?

Attachment 1: recentEQ.png
recentEQ.png
  10858   Tue Jan 6 10:04:39 2015 SteveUpdateIOOhappy IOO
Attachment 1: IOO.png
IOO.png
  10865   Wed Jan 7 11:20:22 2015 SteveUpdateLSCX arm T-QPD gets SM1 thread adapter

C1:SUS-ETMX_QPD is removed and internal SM1 thread adapter epoxied into position as it is at the Y end

This adapter will take FL1064-10 line filter holder

Line filter is attached and qpd needs alignment.

  10871   Wed Jan 7 14:41:46 2015 SteveUpdateGeneralOphir pmeter filter found

Quote:

Quote:

Ophir power meter gets new filter with calibration. This is not cheap. It was the second time we lost it.

Filter leash is attached.

 Some one already took  off the filter and did not care to put it back on. This is carelessness!

Missing filter found. Labeled drawer OPHIR in control room - behind soldering station-  with spare battery and filter

  10882   Fri Jan 9 10:52:37 2015 SteveUpdateSUSPIT trend plots at the ends

100 and 10 days trends of ETMX and ETMY_SUSPIT.  One can see clearly the earthquaks of Dec.30 and 31 on the 10 day plot. You can not see the two shakes  M3.0 & M4.3 of Jan. 3 

The long term plot looks OK , but   the 10 day plot show the problem of ETMX as it was shaken 4 times.

 

Attachment 1: susPITends.png
susPITends.png
  10922   Tue Jan 20 09:32:19 2015 SteveUpdatePEMdusty Monday morning

Yesterday morning was dusty. I wonder why?

The PRM sus damping was restored this morning.

Attachment 1: dustyMorning.png
dustyMorning.png
  10934   Fri Jan 23 10:07:15 2015 SteveUpdateSUSSUS Drift ETMX vs ETMY

ETMX YAW stopped drifting Jan 8, 2015

Quote:

I made little scripts to go with the sus driftmon buttons, that will servo the alignment sliders until the susyaw and suspit values match the references on the driftmon screen.

Attachment 1: SUSdrift30d.png
SUSdrift30d.png
  10948   Wed Jan 28 08:53:01 2015 SteveUpdatePEMSeismometer Vertex is covered

 

Quote:

I have just put the seismometers back into their nominal positions, on the concreted slabs.  The T-240 is in the vertex, and the 2 Guralps are at the end stations.

The vertex location doesn't have a spaghetti pot right now.  There is an aluminum support for cable trays that is welded to the supports under the beam tube that is in the way.  The pot looks like it will fit barely, if it were slid totally horizontally into place.  However we can't do that with the seismometer in place.  I'll chat with Steve this afternoon about our options. 

Since I don't know that we are planning on ever putting a cable tray on the inside of the beamtube, perhaps we can cut ~6 inches of this piece away. 

Aluminum support beam removed and seismometer is covered.

  10983   Fri Feb 6 10:03:23 2015 SteveUpdatePEMdusty days

 

Quote:

Yesterday morning was dusty. I wonder why?

The PRM sus damping was restored this morning.

Yesterday afternoon at 4 the dust count peaked 70,000 counts

Manasa's alergy was bad at the X-end yesterday. What is going on?

There was no wind and CES neighbors did not do anything.

Attachment 1: duststorm.png
duststorm.png
  10989   Mon Feb 9 08:40:49 2015 SteveUpdateSUSrecent earthquake 4.9

Baja 4.9 m earth quake tripped suspentions, except ETMX Sus damping recovered. MC is locking.
 

Attachment 1: M4.9Baja.png
M4.9Baja.png
  11068   Wed Feb 25 14:35:32 2015 SteveUpdatesafetysafety audit 2015

Safety audit went soothly. We thank all participients.

Correction list:

1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type.

2, Floor cable bridge at the vacuum rack to be replaced. It is cracked.

3, Sprinkler head to be moved eastward 2 ft in room 101

4, Annual crane inspection is scheduled for 8am Marc 3, 2015

5, Annual safety glasses cleaning and transmission measurement will get done tomorrow morning.

Attachment 1: safety2015audit.jpg
safety2015audit.jpg
  11085   Fri Feb 27 14:17:51 2015 SteveUpdatesafetysafety audit 2015

Safety glasses were measured and they are all good. I'd like to measure your personal glass if it is not on this picture.

Quote:

Safety audit went soothly. We thank all participients.

Correction list:

1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type.

2, Floor cable bridge at the vacuum rack to be replaced. It is cracked.

3, Sprinkler head to be moved eastward 2 ft in room 101

4, Annual crane inspection is scheduled for 8am Marc 3, 2015

5, Annual safety glasses cleaning and transmission measurement will get done tomorrow morning.

 

Attachment 1: 1064Tchecked.jpg
1064Tchecked.jpg
  11092   Tue Mar 3 09:42:40 2015 SteveUpdateSUSETMX is drifting

The temperature of the east and south ends  are normal, they are about the same.

 

Attachment 1: ETMXdrifting.png
ETMXdrifting.png
Attachment 2: ETMXvsTemp.png
ETMXvsTemp.png
  11093   Tue Mar 3 11:38:11 2015 SteveUpdatesafetyprofessional crane inspection

 

Quote:

Safety glasses were measured and they are all good. I'd like to measure your personal glass if it is not on this picture.

Quote:

Safety audit went soothly. We thank all participients.

Correction list:

1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type.

2, Floor cable bridge at the vacuum rack to be replaced. It is cracked.

3, Sprinkler head to be moved eastward 2 ft in room 101

4, Annual crane inspection is scheduled for 8am Marc 3, 2015

5, Annual safety glasses cleaning and transmission measurement will get done tomorrow morning.

 

Konecranes' Fred inspected and load tested all tree cranes at with 450 lbs

Attachment 1: 450lbs2015.jpg
450lbs2015.jpg
  11100   Thu Mar 5 10:32:58 2015 SteveUpdateSUSBS oplev servo turned off

The BS oplev servo was kicking up the BS. It was turned off

  11131   Wed Mar 11 13:54:18 2015 SteveUpdateGeneraltemporaly storage in the east arm

Green glass for aLIGO OMC shield is temporarly stored in the inside of the Y-arm.

Attachment 1: greenG.jpg
greenG.jpg
Attachment 2: EastArm.jpg
EastArm.jpg
  11147   Thu Mar 19 16:58:19 2015 SteveSummaryIOOMC alignment not drifting; PSL beam is drifting

Polaris mounts ordered.

Quote:

In the attached plot you can see that the MC REFL fluctuations started getting larger on Feb 24 just after midnight. Its been bad ever since. What happened that night or the afternoon of Feb 23?
The WFS DC spot positions were far off (~0.9), so I unlocked the IMC and aligned the spots on there using the nearby steering mirrors - lets see if this helps.

Also, these mounts should be improved. Steve, can you please prepare 5 mounts with the Thorlabs BA2 or BA3 base, the 3/4" diameter steel posts, and the Polanski steel mirror mounts? We should replace the mirror mounts for the 1" diameter mirrors during the daytime next week to reduce drift.

 

Attachment 1: driftingInputBeam2.jpg
driftingInputBeam2.jpg
  11149   Fri Mar 20 10:51:09 2015 SteveSummaryIOOMC alignment not drifting; PSL beam is drifting

Are the two  visible small srews holding the adapter plate only?

If yes, it is the weakest point of the IOO path.

Attachment 1: eom4.jpg
eom4.jpg
Attachment 2: eom3.jpg
eom3.jpg
  11156   Sun Mar 22 18:42:40 2015 SteveUpdateVACvac pressure rose to 1.2mTorr

 

Quote:

We run out of N2 for the vacuum system. The pressure peaked at 1.3 mTorr with MC locked. V1 did not closed because the N2 pressure sensor failed.

We are back to vac normal. I will be here tomorrow to check on things.

We run out of N2 for the vacuum system 6 hrs ago. The pressure rose to 1.2 mTorr with V1 closed. The interlock worked! See Nirogen presure reading fixed at http://nodus.ligo.caltech.edu:8080/40m/10968

 

The vacuum interlock: Nitrogen pressure transducer is reading the pneumatic pressure continously at the pump spool and c1vac1 processing it. When it drops below 60 PSI it closes V1 gate valve and V4 & V5.  Gate valve V1 needs minimum 60 PSI to close. It is critical that V1 is closed before you run out of Nitrogen so the IFO pressure is contained.

 

IFO vacuum is back to Vac Normal. The MC is locked.

cc4 = 2E-6 Torr with VM1 open.

 

Daily N2 consumption measured to be 530PSI as 3 days on 3-27-2015 but note: it does vary !

I have seen it as high as 900 psi  The long term average ~750 psi

Attachment 1: NoN2.png
NoN2.png
Attachment 2: PressureReadingWorks.png
PressureReadingWorks.png
  11158   Mon Mar 23 09:42:29 2015 SteveSummaryIOO4" PSL beam path posts

To achive the same beam height each components needs their specific post height.

 Beam Height Base Plate Mirror Mount Lens Mount  Waveplates-Rotary 0.75" OD. SS Post Height                      
             
4" Thorlabs BA2   Newport LH-1   2.620"  
4" Thorlabs BA2 Polaris K1     2.620"  
4" Thorlabs BA2 Polaris K2     2.220"  
4" Thorlabs BA2   Thorlabs LMR1   2.750"  
4" Thorlabs BA2     New Focus 9401 2.120"  
4" Thorlabs BA2 Newport U100     2.620"  
4" Thorlabs BA2 Newport U200     2.120"  
4" Newport 9021   LH-1   2.0" PMC-MM lens with xy translation stage: Newport 9022, 9065A    Atm3
4" Newport 9021   LH-1   1.89 MC-MM lens with translation stage: Newport 9022, 9025        Atm2

We have 2.625" tall, 3/4" OD SS posts for Polaris K1 mirror mounts: 20 pieces

Ordered Newport LH-1 lens mounts with axis height 1.0 yes

 

Attachment 1: .75odSSpost.pdf
.75odSSpost.pdf
Attachment 2: MC_mml_trans_clamp.jpg
MC_mml_trans_clamp.jpg
Attachment 3: PMCmmLn.jpg
PMCmmLn.jpg
  11170   Wed Mar 25 08:29:31 2015 SteveUpdateLSCMeh

  I turned on the HEPA at the south end during the LSC. Sorry I ment to turn it off.

Quote:

[Jenne, Den]

Overall a "meh" night for locking I think.  The script to all-RF worked several times earlier in the evening, although it was delicate and failed at least 50% of the time.  Later in the evening, we couldn't get even ~10% of the lock attempts all the way to RF-only. 

Den looked into angular things tonight.  With the HEPA bench at the Xend on (which it was found to be), the ETMX oplevs were injecting almost a factor of 10 noise (around 10ish Hz?) into the cavity axis motion (as seen by the trans QPD) as compared to oplevs off.  Turning off the HEPA removed this noise injection.

Den retuned the QPD trans loops so that they only push on the ETMs, so that we can turn off the ETM oplevs, and leave the ITMs and their oplevs alone. 

We are worried again about REFL55.  There is much more light on REFL55 than there is on REFL11 (a 90/10 beam splitter divides the light between them), and we see this in the DC output of the PDs, but there seems to be very little actual signal in REFL55.  Den drove a line (in PRCL?) while we had the PRMI locked with the arms held off resonance, and REFL55 saw the line a factor of 1,000 less than REFL 11 or REFL165.  The analog whitening gain for REFL11 is +18dB, and for REFL55 is +21dB, so it's not that we have significantly less analog gain (that we think).  We need to look into this tomorrow.  As of now, we don't think there's much hope for transitioning PRMI to REFL55 without a health checkup. 

 

  11175   Thu Mar 26 10:41:06 2015 SteveUpdateIOOThe PMC is not clamped

The PMC is seated on 3 SS balls and it is free to move. I'm sure it will move in an earthquake. Not much, because the input and output K1 mirror frame will act as an earthquake stop.Atm2

Are there a touch of super glue on the balls? No, but there are V grooves at the bottom and on the top of each ball.Atm3

 

Attachment 1: IMG_0001.JPG
IMG_0001.JPG
Attachment 2: PMCstops.jpg
PMCstops.jpg
Attachment 3: PMCballv.jpg
PMCballv.jpg
  11184   Tue Mar 31 09:03:32 2015 SteveUpdateVACRGA scan pd78 day 182

 

 

Attachment 1: RGApd78d182.png
RGApd78d182.png
  11188   Wed Apr 1 10:50:59 2015 SteveUpdatePEMconstruction ahead

The 40m fenced area will start storing this large ~ 8000 lbs chamber on April 14. The asphalt will be cut, jack hammered the next 2-3 days in order to lay concrete.

Their schedule is from 8 to 5 starting tomorrow.  We are asking them to work from 6 to 3pm

ETMX is about 12-15 ft away

Attachment 1: largeMITchamber.jpg
largeMITchamber.jpg