Entry  Tue Feb 8 15:22:13 2011, kiwamu, Update, Green Locking, new electronics rack at X end DSC_2861_ss.png
   +  Reply  Thu Feb 10 00:23:25 2011, Jenne, Update, Green Locking, Green TRX DC PD installed on PSL 
Entry  Thu Feb 10 05:06:35 2011, kiwamu, Update, Green Locking, beat noise : a little bit better, and 1Hz peak from amplitude noise coupling Screen_shot_2011-02-10_at_4.01.43.pngScreen_shot_2011-02-10_at_4.52.13.png
Entry  Sun Feb 13 15:02:23 2011, kiwamu, Update, Green Locking, X arm beam offcentering has been measured misposition.png
Entry  Fri Feb 18 15:05:49 2011, kiwamu, Update, Green Locking, transfer function of angle to beat note (length)  a2l_TF.png
Entry  Wed Feb 23 04:56:59 2011, kiwamu, Update, Green Locking, noise curve update noise_suprresion.png
Entry  Thu Feb 24 17:42:00 2011, Aidan, Update, Green Locking, 15% of end laser sideband power transmitted through cavity 
Entry  Thu Feb 24 18:21:24 2011, kiwamu, Update, Green Locking, in-loop and out-of-loop measurements green_lock_setup.pngmeasurement1.pngTRX_REFL11.pngmeasurement2.png
   +  Reply  Thu Feb 24 19:59:25 2011, kiwamu, Update, Green Locking, whitening filter for ALS ACDC.png
Entry  Thu Feb 24 21:46:30 2011, kiwamu, Update, Green Locking, installed a summing box summing_box.pngtransfer_func.png
   +  Reply  Sat Feb 26 02:33:16 2011, kiwamu, Update, Green Locking, sidebands on beatnote beat_note.png
   +  Reply  Sun Feb 27 09:43:59 2011, Aidan, Update, Green Locking, sidebands on beatnote 
   +  Reply  Sun Feb 27 13:09:56 2011, rana, Update, Green Locking, sidebands on beatnote 
Entry  Wed Mar 2 16:51:53 2011, steve, Configuration, Green Locking, mech shutter in place at the south end 
Entry  Wed Mar 2 17:19:58 2011, Aidan, Configuration, Green Locking, Moved PDH PD on end table P1000223-a.jpgP1000218.jpgP1000224.jpg
Entry  Wed Mar 2 18:08:43 2011, Aidan, Update, Green Locking, Ghost beams on green Ghost_Beam_at_ETM_DCBS.pdf
Entry  Thu Mar 3 00:12:52 2011, kiwamu, Update, Green Locking, plan 
Entry  Thu Mar 3 07:25:24 2011, kiwamu, Update, Green Locking, screwed up the end PDH box 
Entry  Fri Mar 4 03:31:35 2011, kiwamu, Update, Green Locking, A first noise budget noise_budget.png
   +  Reply  Fri Mar 4 18:06:34 2011, kiwamu, Update, Green Locking, noise budget : differential noise open_loop_TF.pngservos.png
Entry  Mon Mar 7 18:20:01 2011, kiwamu, Summary, Green Locking, plans 
Entry  Tue Mar 8 06:29:06 2011, kiwamu, Update, Green Locking, Intensity noise setup 
Entry  Tue Mar 8 15:20:31 2011, kiwamu, Update, Green Locking, differential noise on Mar.8th differential_noise20110308.png
   +  Reply  Tue Mar 8 15:33:09 2011, kiwamu, Summary, Green Locking, plan on Mar.8th 
   +  Reply  Wed Mar 9 04:46:13 2011, kiwamu, Update, Green Locking, more intensity noise measurement intensity_setup.pngIntensityNoise.png
   +  Reply  Wed Mar 9 18:17:11 2011, kiwamu, Update, Green Locking, Intensity noise coupling diff_noise.pngIN_TF.png
   +  Reply  Thu Mar 10 14:06:54 2011, kiwamu, Update, Green Locking, Intensity noise limits the beatnote sensitivity diff_noise_Mar8.pngIN_TF_complete.png
   +  Reply  Thu Mar 10 14:22:58 2011, kiwamu, Update, Green Locking, Intensity noise limits the beatnote sensitivity 
   +  Reply  Thu Mar 10 14:29:05 2011, Koji, Update, Green Locking, Intensity noise limits the beatnote sensitivity 
   +  Reply  Thu Mar 10 14:30:53 2011, rana, Update, Green Locking, Intensity noise limits the beatnote sensitivity 
   +  Reply  Thu Mar 10 16:00:53 2011, Aidan, Joe, Update, Green Locking, Intensity stabilization loop using beatnote DC. P1000313.jpgP1000314.jpgP1000315.jpgGREEN_ISS_LOOP.pdfScreenshot-C1ALS_OVERVIEW.adl.png
   +  Reply  Thu Mar 10 21:45:34 2011, rana, Update, Green Locking, Intensity stabilization loop using beatnote DC. 
Entry  Fri Mar 18 12:22:04 2011, kiwamu, Update, Green Locking, Y arm plan for today 
   +  Reply  Fri Mar 18 16:06:30 2011, kiwamu, Update, Green Locking, Re: Y arm plan for today 
   +  Reply  Fri Mar 18 16:31:11 2011, Suresh , Update, Green Locking, Re: Y arm plan for today 
Entry  Fri Mar 18 17:55:58 2011, Suresh, Configuration, Green Locking, Work Plan for Y-end Aux laser installation 
Entry  Mon Mar 21 16:49:11 2011, kiwamu, Summary, Green Locking, plan for this week 
Entry  Mon Mar 21 18:34:10 2011, kiwamu, Update, Green Locking, added a new ADC channel on 1X9 aa_board_1X9.jpg
   +  Reply  Tue Mar 22 00:01:25 2011, kiwamu, Summary, Green Locking, plan for daytime tasks 
Entry  Tue Mar 22 00:03:29 2011, Bryan, Configuration, Green Locking, PSL vs Y arm laser temperature pairing PSL_vs_Y_arm_Temperatures.png
   +  Reply  Tue Mar 22 00:23:20 2011, Jenne, Configuration, Green Locking, PSL vs Y arm laser temperature pairing 
Entry  Tue Mar 22 16:39:51 2011, kiwamu, Update, Green Locking, comaprator installed : 80 pm residual displacement noise_curve20110322.png
   +  Reply  Tue Mar 22 19:03:45 2011, Bryan, Configuration, Green Locking, PSL vs Y arm laser temperature pairing 
Entry  Wed Mar 23 00:51:47 2011, kiwamu, Update, Green Locking, plan for tomorrow 
Entry  Wed Mar 23 05:11:08 2011, kiwamu, Update, Green Locking, servo handig off stripTransit_edit.pngnoise_curve20110322_hUGF.png
   +  Reply  Wed Mar 23 08:50:36 2011, Aidan, Update, Green Locking, servo handig off green-to-red.jpg
Entry  Wed Mar 23 19:16:17 2011, Aidan, Summary, Green Locking, Y-END green equipment is all available three-quarter_inch_pedestal.jpg
   +  Reply  Thu Mar 24 01:16:19 2011, Suresh, Summary, Green Locking, Y-END green equipment is all available 
Entry  Thu Mar 24 13:50:30 2011, Bryan, Configuration, Green Locking, Y arm laser IMG_0188.JPGIMG_0190.JPG
   +  Reply  Thu Mar 24 15:30:59 2011, Bryan, Configuration, Green Locking, PSL vs Y arm laser temperature pairing Temp_Beating_Day02_html_m2d719182.jpg