  11352   Wed Jun 10 15:54:14 2015 SteveUpdateVACVacuum comp. rebooted

Koji and Steve succeded rebooting C1vac1, C1vac2 and pressure reading is working now

More tomorrow .........

 

Attachment 1: afterReb061015.png
afterReb061015.png
  11354   Fri Jun 12 08:40:17 2015 SteveUpdateVACVacuum comp. rebooted

Koji and Steve,

One computer expert and one vacuum expert required.

Quote:

The serial connections to the vacuum gauges were recovered by rebooting c1vac1 and c1vac2.

Steve claimed that the vacuum screen had showed "NO COMM" at the vacuum pressure values.
The epics connection to c1vac was fine. We could logged in to c1vac1 with telnet too although c1vac2 had no response.

After some inspection, we decided to reboot the slow machines. Steve manually XXXed YYY valves (to be described)
to prepare for any possible unwanted switching. Initially Koji thought only c1vac2 can be rebooted. But it was wrong.
If the reset button is pushed, all of the modules on the same crate is reset. So everything was reset. After ~3min we still
don't have the connection to c1vac1 restored. We decided to another reboot. This time I pushed c1vac1 reset button.
After waiting about two minutes, the ADCs started to show green lights and the switch box started scanning.
We recovered the telnet connection to c1vac1 and epics functions. c1vac2 is still note responding to telnet, and
the values associated with c1vac2 are still blank.

Steve restored the valves and everything was back to normal.

Atm 1,  problem condition: gauges are not reading for a week, error message "NO COMM" and all computer LEDs are green

Atm 2, prepare to safe reboot:

            a, close V1, disconnect it's power cable and turn off Maglev, wait till rotation stops

            b, close PSL shutter ( take adrenaline if needed )

            c, close V4, V5, VA6 valves and disconnect their cables. "Moving" error message indicating this condition.

               V1 is not showing "Moving" because its power cable disconnected only! It will show it if its position indicator cable is disconnected too. There is no need for that.

               These valves closed and disabled will not allow accidental venting of main volume.

            d, push reset, reseting c1vac2 will reset c1vac1 also, wait ~ 6 minutes

"Vacuum Normal" valve configuration was restored after succesful reboot as follows:

             a, reconnect cable and open V4 and V5 at P2 & P3 <1e-1 Torr

             b, observe that P2  < 1e-3 Torr and retsart Maglev

             c, wait till Maglev reaches full speed of 560 Hz and reconnect-open V1

             d, reconnect-open VA6 at P3 <1e-3 Torr

NOTE: VM1 valve was locked in open position and it was not responding before and after reboot

          Error message on Atm2 is indicating this locked condition: "opening VM1 will vent IFO"

          This is a fauls message. The valve is frozen in open position. We need a softwear expert help.

 

 

Attachment 1: vacMonNoGauges.png
vacMonNoGauges.png
Attachment 2: prepReboot.png
prepReboot.png
  11369   Mon Jun 22 14:21:42 2015 SteveMetaphysicsTreasureJenne and Den graduated

Last supper before departing at  "Grazie" El Portal. All the best on your journey!

Attachment 1: ls.jpg
ls.jpg
  11372   Tue Jun 23 11:18:20 2015 SteveUpdatePEMcleaning around chambers

Keven is our regular janitor is out for a few weeks.

The sub is careful- gentel Mario. We wiped arouind the vertex cambers north side on the floor and east arm racks.

 

  11373   Wed Jun 24 08:05:43 2015 SteveUpdatePSLlaser turned on

The laser went off around 11am yesterday. It was turned on

Attachment 1: laserWasOff.png
laserWasOff.png
  11377   Thu Jun 25 15:07:50 2015 SteveUpdatesafetySurfs Safety 2015

Jessica Pena, Megan Kelly, Eve Chase and Ignacio Magana received 40m specific basic safety traning today.

Attachment 1: surfs2015.jpg
surfs2015.jpg
  11387   Wed Jul 1 10:01:25 2015 SteveUpdateVACRGA scan pd78 day 275

 

 

Attachment 1: rga275d.png
rga275d.png
  11388   Wed Jul 1 11:45:48 2015 SteveUpdatePEMcleaning around ETMX chamber
Quote:

Keven is our regular janitor is out for a few weeks.

The sub is careful- gentel Mario. We wiped arouind the vertex cambers north side on the floor and east arm racks.

 

Mario wiped the floor around the ETMX chamber today.

  11439   Thu Jul 23 15:41:41 2015 SteveUpdatePEMfitting ants with TERRO

Pasadena got 0.2" of  rain on Saturday. Temperatures were high with high humidity since than.The ants were back in the Control room east side benches.

We have started using TERRO Liquid Ant Baits in January 2015   This worked very well to this point.

Tree new packages were opened  yesterday and the ants are gone.

We can conclude that these baits must be replaced after 6 mounts.

The liquid baits contains BORAX  and it is safe.

 

  11443   Fri Jul 24 13:49:09 2015 SteveUpdatesafetyLock doors please !

Thursday morning I found the control room emergency exit not locked.

Please check the doors when leaving the lab , specially when you are the last one out.

  11451   Tue Jul 28 14:58:59 2015 SteveUpdateGeneraldo not place anything on optical table tops

angrySpecially heavy items: old analoge scope or hardware loaded boxes......etc

 The table cover section holding crossbars are not evenly spaced.no

You have to center each cover section on the cross bar so it is supported on both sides !

 

I will clean up on this table tomorrow

 

 

Attachment 1: tabletops!.jpg
tabletops!.jpg
Attachment 2: tabletops!!.jpg
tabletops!!.jpg
  11452   Tue Jul 28 15:05:09 2015 SteveUpdatesafetyfire alarm test ? no

We just had fire alarm trigged avacuation of the 40m lab.

It turned out that the CES building second floor sensor caused this action.

Attachment 1: 6minGaps.png
6minGaps.png
  11453   Tue Jul 28 15:06:27 2015 SteveUpdateIOOPSL HEPA turned on

crying

Attachment 1: noHepa.jpg
noHepa.jpg
  11454   Tue Jul 28 16:42:25 2015 SteveUpdateGeneralJamies entry was deleted

Sorry Jamie, I accidentally deleted your elog entry #11453

  11459   Wed Jul 29 14:32:01 2015 SteveUpdateGeneralHow not to solder

 

Quote:

 

Quote:

Koji and Steve,

The result: bad Guralp x-arm cable.

I will swap the short cables tomorrow at the base.

 

Short 46" long cables at the base plates were swapped. Their solderings looked horrible.

This cable actually worked at 5-5-2015

Bad cable at ETMY station now.  The new cable should be a little bit longer ~52"

Koji could pull out easily 11 of the wires  from their socket.

Attachment 1: coldSoldering.jpg
coldSoldering.jpg
  11464   Thu Jul 30 10:38:18 2015 SteveUpdatePEMY sesimostation is back on

Koji soldered new 50" long cable for the Y station.

 

Attachment 1: Guralps_are_back_on.png
Guralps_are_back_on.png
Attachment 2: Ystation.jpg
Ystation.jpg
  11469   Thu Jul 30 15:24:54 2015 SteveUpdatePEMY sesimostation is back on

Atm1,  New short-50" long cable was installed at ETMY end ( Y-station ) between Guralp-B ( MIT ) and granite base.

Interface box input 2 was left connected to cable 1 and input 1 to cable 2. This plot shows no change.

 

Atm2, Than I swapped the two long cables at the interface box

                                                                                                   Now the signal seems to be ok <2 Hz,

                                                                                                                                                       >2 Hz some problem exist.

      Channel Name Location Seismometer 40m long cable

Interfacebox input

 

 50" short cable

C1:PEM-RMS_GUR2X_.... ETMX Guralp -A  2   2                             Jenne's friend                
C1:PEM-RMS_GUR1X_.... ETMY  Guralp-B  1   1  Koji

I will look for more bad soldering tomorrow. How many cables did she make?

 

 

Attachment 1: NewShortCable-Y-B-Gur2.png
NewShortCable-Y-B-Gur2.png
Attachment 2: interfaceInputSwapped.png
interfaceInputSwapped.png
Attachment 3: sameasAtm2.png
sameasAtm2.png
  11473   Fri Jul 31 10:36:22 2015 SteveUpdatePEMX seismo station short cable removed

 

Quote:

Atm1,  New short-50" long cable was installed at ETMY end ( Y-station ) between Guralp-B ( MIT ) and granite base.

Interface box input 2 was left connected to cable 1 and input 1 to cable 2. This plot shows no change.

 

Atm2, Than I swapped the two long cables at the interface box

                                                                                                   Now the signal seems to be ok <2 Hz,

                                                                                                                                                       >2 Hz some problem exist.

      Channel Name Location Seismometer 40m long cable

Interfacebox input

 

 50" short cable

C1:PEM-RMS_GUR2X_.... ETMX Guralp -A  2   2                             Jenne's friend                
C1:PEM-RMS_GUR1X_.... ETMY  Guralp-B  1   1  Koji

I will look for more bad soldering tomorrow. How many cables did she make?

 

 

We have to redo this cable also

Attachment 1: IMG_0009.JPG
IMG_0009.JPG
  11476   Mon Aug 3 08:16:19 2015 SteveUpdateSUSETMX damping restored
Attachment 1: ETMXrestored.png
ETMXrestored.png
  11483   Thu Aug 6 09:16:57 2015 SteveUpdateVACChiara gets new Ethernet card
  1. Yesterday we did put the vacuum system into safe to reboot mode  for the ethernet card swap.
  2. Atm1, IFO pressure
  3. Atm2, as prepared valve configuration where " moving " means closed and disconnected

 

Attachment 1: ChiaraNetCard.png
ChiaraNetCard.png
Attachment 2: 23.png
23.png
  11487   Mon Aug 10 15:25:05 2015 SteveUpdatePEMwasp nest

The wasp nest will be removed tomorrow from from the out side of the east arm window.

The resonant frequency of the newly arrived gravity bee detector is not known.
 

Attachment 1: waspN.jpg
waspN.jpg
  11505   Fri Aug 14 09:07:45 2015 SteveUpdatePEMGur interface box is wonky

Atm1, Before cable swap

Atm2, The long cables were swapped at the input of the interface box.

We can conclude that the problem is in the interface box

I wonder if interface box input 3 is wired?

Attachment 1: Gur1&2.png
Gur1&2.png
Attachment 2: longCablesSwapped.png
longCablesSwapped.png
  11514   Tue Aug 18 11:16:17 2015 SteveUpdatePEMGur interface box is wonky

The Guralp ADC  interface box  D060506 is ready for inspection. It is in front of 1X1 with open top and running.cool

Obviously c7 as 1 miroF cap is missing.blush

Quote:

Let's dismantle the I/F unit from the rack and connect the cable with the lid open.
We need to trace the signal.

 

Attachment 1: IMG_0009.JPG
IMG_0009.JPG
  11517   Wed Aug 19 07:58:25 2015 SteveUpdatePEMGur interface box

Koji and Steve,

We took transferfunctions of each channel yesterday. They were identical ?. I will check the cables from ADC to DAQ next.

Attachment 1: GurADCbox.jpg
GurADCbox.jpg
  11522   Fri Aug 21 08:38:37 2015 SteveUpdateIOOPMC locked

PMC needed to be locked manually.cheeky

Attachment 1: PMClocked.png
PMClocked.png
  11523   Fri Aug 21 17:15:13 2015 SteveUpdatePEMGur interface box

 

Quote:

As reported previously, the transfer functions of the channels look fine. (i.e. All channels almost identical.)
I checked the chain from the unit input to the DAQ BNC connectors. They were all OK.

Today I have been checking the signals on the unit with the long DB37 cables connected.
I could not see anything on the Gur2 channels on the board. I looked at the DB37 for Gur2 and felt something is wrong.

I opened the housing of the cable and realized that all the pins are not fully inserted.
The wires were crimped improperly and prevents them to be fully inserted.

=> We need to redo the crimping to insert them.
=> We need to check the other side too.

I'm making a new long cable. Both connector ends of this X arm long cable were terrible. It was removed from the cable tray yesterday.

The Y arm Guralp is running fine. The interface box is open in front of 1X1 on a cart and it is alive!    Please be aware of it !

  11531   Tue Aug 25 16:39:06 2015 SteveUpdatesafetysafety training

Alessandra Marrocchesi received 40m specific basic safety training yesteday.

  11537   Fri Aug 28 17:04:12 2015 SteveUpdatePEMGur interface box cable
Ara! Onara suru tsu-mori datta keh-do, un-chi ga de-chatta...
Quote:

 

Quote:

As reported previously, the transfer functions of the channels look fine. (i.e. All channels almost identical.)
I checked the chain from the unit input to the DAQ BNC connectors. They were all OK.

Today I have been checking the signals on the unit with the long DB37 cables connected.
I could not see anything on the Gur2 channels on the board. I looked at the DB37 for Gur2 and felt something is wrong.

I opened the housing of the cable and realized that all the pins are not fully inserted.
The wires were crimped improperly and prevents them to be fully inserted.

=> We need to redo the crimping to insert them.
=> We need to check the other side too.

I'm making a new long cable. Both connector ends of this X arm long cable were terrible. It was removed from the cable tray yesterday.

The Y arm Guralp is running fine. The interface box is open in front of 1X1 on a cart and it is alive!    Please be aware of it !

The new cable was made this way:

Pins were located with ohm meter for locations and both ends were cut off.The Belden 1424A cable than was soldered to DB37 and Guralp circular connector " IKPT06F16-26S-ND "

This cable will connect the ADC interface box CCD# DO 60506 to Guralp seismometer at the sout end.

The Guralp's each 3 axies will be connected through a twisted pair to the differential input op amp

Gur  ouput  vertical axis + -  on circular connector   A, B  to DB37 pin 1 &20

Gur output        N/S axis + -  on circular connector   C, D to DB37 pin 2 & 21

Gur output       E/W axis + -  on circular connector   E, F to DB37 pin 3 & 22

Power +12 VDC  from DB37 pin 29 to Gur circular connector pin c (lower case)

Power -12 VDC  from DB37 pin 24 to Gur circular connector pin  M Note: this connection was absent at the first test of this cable!

Ground              from DB37 pin 10 to Gur circular connector pin b (lower case)

Summery: I may destored the opamp  at the Guralp A at the south end.

 

 

Attachment 1: fixedNewLongCable.png
fixedNewLongCable.png
  11554   Tue Sep 1 10:36:06 2015 SteveUpdatePEMGurs swapped
Quote:

To help find out if Steve really melted the inside of our precious seismometer, lets hook it up using the handheld seismo wand and see if it produces volts when we shake the ground.

Also, please stop using names like GurA or Gur1 or GurSuzy. We have GurX and GurY because they are at those ends. Anything else is confusing.

I moved Gur A from ETMX to ETMY . Gur B at ETMY was disconnected and its cable  connected to Gur A

It seems that Gur A is alive. I will stop using A and B names after we stop swapping components.

Attachment 1: GurA@ETMY.png
GurA@ETMY.png
  11566   Thu Sep 3 08:53:55 2015 SteveUpdateSUSETMY Oplev laser power is falling

Rana, Steve

We investigated the ETMY oplev table set up and did not find a red herring.

Two 2 years  vs one day plot below.

ps: thanks  Q for fixing  DTT, the auto scaling is not working at sampling rate 10 min and 1 hr period?? surprise

 

Attachment 1: ETMYoplev2y.png
ETMYoplev2y.png
  11575   Fri Sep 4 09:36:48 2015 SteveUpdateLSCIR beatnote confusion.....

 

Quote:

I was thinking that the "FOSC" product line (which is called a "coupler" instead of a "splitter/combiner") was what we wanted. 

Koji brought to my attention that the 90/10 splitters we already have are of this line. So, I rigged a few up to shine a hopefully beating pair of fields on the fiber coupled thorlabs PD. 

I was able to get ~80uW each of PSL and AUX X light on the PD, which produced a -10dBm beatnoteyes Thus, I think these FOSC splitters are indeed what we want. 

I then threw this IR beatnote at our ALS signal chain. The beatnote was too big to throw through our ~+27dB RF amps, so I just sent the -10dBm over to the LSC rack.

The IR beat spectrum is somwhat noisier from 10-100Hz, but, more interesting, is that the sub-4Hz noise is identical in the two beats, and very coherent. This excludes ALS noise arising from anything happening in the green beat optics on the PSL table.

Obviously, the high frequency noise is largely the same and coherent too, but also coherent with the AUX X PDH control signal, so it is understood. 

FOSC-2-64-50-L-1-H64F-2
Single mode coupler, 2x2, 1064nm +/-20nm, 50/50 ratio, 900micron loose tube jacket, Hi1060flex fiber, 1m fiber length, FC/APC connectors

Four of these items ordered yesterday from http://afwtechnologies.com.au/sm_coupler.html

  11576   Fri Sep 4 10:25:19 2015 SteveConfigurationIOOAOM stage is ready

New stage can hold the correct polarization.

DRAWING CORRECTION:  Post block height was lowered to be 1.88" from 2.0"

Attachment 1: stage_AOM-EOM.jpg
stage_AOM-EOM.jpg
Attachment 2: A-EOMholder.pdf
A-EOMholder.pdf A-EOMholder.pdf A-EOMholder.pdf A-EOMholder.pdf
  11591   Fri Sep 11 10:56:47 2015 SteveUpdateendtable upgradeETMY optical table feedthrough

The ETMY enclosure feedthrough - north is installed. The sealing material is hard to work with.

The upper empty blocks will be replaced by something soft to make changing cables easy.

 

Attachment 1: ETMY-Nfeedt.jpg
ETMY-Nfeedt.jpg
  11593   Mon Sep 14 10:41:03 2015 SteveUpdateVACTP2 dry pump replaced

TP2 dry fore pump sn PLE10082 was replaced at pressure 717 mTorr,  TP2 50K rpm 0.33A @ 112,677 hrs

Top seal life was 8,160 hrs

Model  SH110, Sn LP1007L556 was installed. It's fore line pressure after 30 minutes of running 38 mTorr, TP2 turbo at 50K rpm 0.18A

 

 

Attachment 1: TP2_dry_pump_replaced.png
TP2_dry_pump_replaced.png
  11600   Tue Sep 15 16:49:08 2015 SteveUpdateendtable upgradeETMY optical table feedthrough

ETMY optical table enclosure feedthrough- south is in. Now it is time to see how air tightness increases performance.

Quote:

The ETMY enclosure feedthrough - north is installed. The sealing material is hard to work with.

The upper empty blocks will be replaced by something soft to make changing cables easy.

 

 

Attachment 1: ETMYsFeedt.jpg
ETMYsFeedt.jpg
  11608   Thu Sep 17 02:22:53 2015 SteveUpdateendtable upgradeETMY optical table feedthrough

I doubt we'll see any effect until we carefully seal the holes. If there's 1 hole in your boat it still sinks.

Quote:

ETMY optical table enclosure feedthrough- south is in. Now it is time to see how air tightness increases performance.

 

  11610   Thu Sep 17 08:36:14 2015 SteveUpdatePEMearth quake

No damage. The BS sensor UR 0.220 V has been low for some times.

Dataviewer does not work for long term trend.

Attachment 1: Chilian_eq_8.3M.png
Chilian_eq_8.3M.png
Attachment 2: BS_UR_0.220V.png
BS_UR_0.220V.png
Attachment 3: LowSensingV_BS-UR.png
LowSensingV_BS-UR.png
  11612   Thu Sep 17 16:04:09 2015 SteveUpdatePEMGurs

ETMY - Guralp (B-MIT) was covered with copper lined can yesterday afternoon. It's long cable is connected to ADC interface box input 1

The vertex Trillium was covered just ~2 days before Ignacio left.

ETMX - Guralp (A-Caltech) is not covered. The long 40m cable is disconnected at the the south end.

 

  11625   Mon Sep 21 11:12:14 2015 SteveUpdateVACcold cathode is flaky

CC4 cold cathode gauge jump triggered interlock to close VM1 valve to protect the RGA.

The IFO pressure is 1e-5 Torr

Vac normal was recovered by opening VM1

 

Attachment 1: cc4jumps.png
cc4jumps.png
  11633   Tue Sep 22 08:58:38 2015 SteveUpdateVACcold cathode is flaky

The cold cathode gauge is back to normal. cc4 is the last gauge is "functioning"

MKS is not responding. The spare controller and gauges are back for repair.

 

Attachment 1: 4and80days.png
4and80days.png
  11642   Fri Sep 25 11:08:33 2015 SteveUpdateSUSwire standoffs

Our last effort to change the existing Al-6061 wire standoffs was at April 2012

We requested sapphire and/or ruby materials with smaller R at the bottom of the  groove. Groove polishing was asked for.

Insaco Inc. quote 84740 as " best effort " NO POLISHING.  The groove cut to be with eximer laser.

Jeff Lewis as 9-12-2012:  the LIGO sapphire prisms grooves were NOT POLISHED  but Resonatics used the corner of a rasor blade to scrape off the

ablated material wich was redeposited in and around the grooves.
 

Attachment 1: wireStandOff_SOS.PDF
wireStandOff_SOS.PDF
  11643   Fri Sep 25 14:52:08 2015 SteveUpdateSUSETMX is not drifting

We have talked about the drift of ETMX sus on the Wednesday meeting.

It has stopped moving on Jan 8, 2015 and it has been reasanable stable since than.

 

Attachment 1: ETMXstoppedDrifting.png
ETMXstoppedDrifting.png
Attachment 2: 25daysArmsT.png
25daysArmsT.png
  11644   Fri Sep 25 17:00:38 2015 SteveUpdateVACcold cathode is flaky

The IFO pressure is estimated ~1E-6 Torr with modified Vac normal valve configuration.

CC4 is in a jumping mode between 2e-5 and 1e-6 Torr

 Pressure based interlock kicks in to close VM1   at 2e-5 Torr to protect the RGA.

I did open VM1 repeatedly in the last few mornings but as cc4 jumps VM1 closes.

As VM1  closed to RGA scans are not seeing the IFO. I will look at some scans on Monday.

Mean while I opened VM2 to lower the pressure for the RGA. This change will be read by "Current Status: Undefined State"

So do not panic, the IFO pressure is normal.

I need someone's help to raise the interlock threshold to 5e-5 Torr

I'm buying a new cold cathode gauge on Monday.

 

note: cc1 is out of order!

         just read P1  the pressure is < 7e-4 Torr  This gauge is very reliable and it is at the low end of it's range.

 

Attachment 1: flakyCC4.png
flakyCC4.png
  11654   Wed Sep 30 15:44:06 2015 SteveUpdateGeneralSun Fire X4600

Gautam and Steve,

The decommissioned server from LDAS is retired to the 40m   with 32 cores and 128GB of memory in rack 1X7   http://docs.oracle.com/cd/E19121-01/sf.x4600/

  11659   Fri Oct 2 15:11:08 2015 SteveUpdatePEMcable squashed

Cable numbered #53 from Accelerometer 4 to 1X7 / DAQ input c26 was squased while removing network card from Sun Fire x4600 today.

This cable has to be tested.

  11660   Fri Oct 2 15:33:09 2015 SteveUpdatesafetysafety training

Gautom has received 40m specific basic safety training today.

  11666   Mon Oct 5 10:11:35 2015 SteveUpdateVACRGA scan pd78 day 386

RGA background scan.

The IFO is closed off from RGA with VM1

CC4 ( and CC1)  is still flaky and it's interlock closes VM1

 

Attachment 1: RGA_background.png
RGA_background.png
  11668   Mon Oct 5 16:41:22 2015 SteveUpdateSUSETMY OL laser replaced

This JDSU 1103P laser, sn P892324 lived for 2 years. It's power output is 0.05 mW now

It was replaced with brand new JDSU 1103P,  sn P919645, Mfg date 12/2014 with 2.75 mW output.

There is 0.14 mW  light returning to the qpd = 7,250 counts without AR 632 lenses

  11695   Fri Oct 16 18:27:52 2015 SteveUpdateVAC vacuum normal condition

Vacuum normal configuration with VM1-closed, VM2-open valve positions. Power load normal 24V 0.2A

Maglev rotation 560 Hz at room temp body temp.

"NO COMM" error message on medm screen. Gauge controller pressures are read able.

All vac comp LEDs are green. We have to reboot on Monday to enable communication.

 

Attachment 1: oct16Fpm2015.png
oct16Fpm2015.png
  11705   Wed Oct 21 10:03:15 2015 SteveUpdateVACafter running out of N2

 

Quote:

[ericq, Gautam, Steve]

Following roughly the same procedure as ELOG 11354, c1vac1 and c1vac2 were rebooted. The symptoms were identical to the situation in that ELOG; c1vac1 could be pinged and telneted to, but c1vac2 was totally unresponsive. 

The only change in the linked procedure was that we did not shut down the maglev. Since I unwittingly had it running for days without V4 open while Steve was away, we now know that it can handle shorter periods of time than that...

Upon reboot, many channels were readable again, unfortunately the channels for TP2 and TP3 are still blank. We were able to return to "Vacuum normal state," but because of unknowned communication problems with VM1's interlock, we can't open VM1 for the RGA. Instead we opened VM2 to expose the RGA to the main IFO volumn, but this isn't part of the "Normal" state definite, so things currently read "Undefined state".

Precondition:

1, Pressure gauges had no communication ( NO COMM ) with c1vac2

 

2, Lost N2 supply on Oct 9 This triggered a normal all valve closed condition. At this point you replace N2 cylinders and manually swich valves to recreate VAC NORMAL configuration in the correct sequential order.

   The very last thing you do is open V1 gate valve.

   a, check TP2 that is the forepump of the Maglev. Foreline pressure to drypump  ~ 10- 100 mTorr, rotation speed 50 Krpm

   b, open V4 if P2 <1Torr

   c, check Maglev rotating at 560 Hz

   d, open V1 if P1 <500 mTorr

   e, check TP3 foreline, rotation speed and open V5 if P3 <1 Torr with VA6 closed

   f, open VA6 if PAN <1 Torr

  g, open annulos valves one by one , like VASE if PASE <1 Torr and so on...........Now the Current State: should read Vac Normal

 

3, Maglev run for 7 days with V4 closed. This encreased its foreline pressure to estimated few Torrs  and its body temp rose ~30C on the outside.

   So it was sweating and it may be back streamed.

The present RGA data is indicating that it had to be very mild.

The RGA will have better sensitivity with VM1 open and VM2 closed.

The PSL output shutter stayed open during these period is pointing  to IFO pressure stayed P1 <3 mTorr

PROBLEM: P1 and P2 plot should show nothing where there is no communication.http://nodus.ligo.caltech.edu:8080/40m/151016_182003/oct16Fpm2015.png

                   How do we check if pressure based software interlocks are working in this no communication condition?

Attachment 1: 1d_after_reboot.png
1d_after_reboot.png