40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 152 of 341  Not logged in ELOG logo
Entry  Mon Mar 28 21:12:14 2011, Jenne, Update, PSL, New PMC Base Riser Design PMC_riser.eprt
    Reply  Mon Mar 28 22:56:14 2011, rana, Update, PSL, New PMC Base Riser Design 
    Reply  Mon Mar 28 23:51:54 2011, Jenne, Update, PSL, New PMC Base Riser Design 
Entry  Tue Mar 24 19:55:24 2009, Jenne, Update, LSC, New PO DC 
    Reply  Tue Mar 24 23:23:05 2009, rana, Update, LSC, New PO DC 
    Reply  Thu May 30 17:18:58 2013, Jenne, Update, ASC, New POP path 
    Reply  Sat Jun 1 14:14:56 2013, Jenne, Update, ASC, New POP path POX_table_30May2013progress.pdfPOP_QPD_lensSolution.png
    Reply  Fri Jun 14 03:10:40 2013, Jenne, Update, ASC, New POP path - PDs in place, need cabling 
    Reply  Fri Jun 14 17:54:11 2013, Jenne, Update, ASC, New POP path - cabling work 
    Reply  Wed Jun 19 22:02:03 2013, Jenne, Update, ASC, New POP path - ready to try 
Entry  Wed Oct 28 17:06:30 2015, ericq, Update, ASC, New PRC Angular FF filters installed 
Entry  Tue Apr 1 22:03:44 2014, Koji, Summary, ASC, New PRM ASC is running 
    Reply  Wed Apr 2 19:50:12 2014, Koji, Summary, ASC, New PRM ASC is running 
    Reply  Wed Apr 2 23:08:51 2014, Koji, Summary, ASC, New PRM ASC is running PRM_QPD.pdfQPD_spe.pdf
Entry  Fri Nov 20 13:54:45 2009, Alberto, Omnistructure, Environment, New Paper and Cardboard Recycling Bins Introduced to the 40m DSC_1030.JPGDSC_1031.JPG
Entry  Thu Dec 16 10:52:42 2010, josephb, Update, Cameras, New PoE digital cameras basler.jpg
Entry  Tue Apr 12 09:05:21 2022, Jordan, Update, VAC, New Pressure Gauge Install/Pump Spool Vent 6x
    Reply  Wed Apr 13 12:50:07 2022, Tega, Update, VAC, New Pressure Gauge Install/Pump Spool Vent VAC_FRG_UPGRADE.png
Entry  Fri Jul 11 17:49:12 2014, Nichin, Update, Electronics, New Prologix GPIB-Ethernet controller 
    Reply  Sun Jul 13 11:37:36 2014, Jamie, Update, Electronics, New Prologix GPIB-Ethernet controller 
    Reply  Mon Jul 14 12:49:07 2014, Nichin, Update, Electronics, New Prologix GPIB-Ethernet controller 
Entry  Wed May 26 10:58:29 2010, josephb, Update, CDS, New RCG checkout for use with all machines plus some issues 
Entry  Wed May 5 16:32:39 2010, Alberto, Update, 40m Upgrading, New REFL55 PD, 11MHz rejection 2010-05-05_REFL55_CalibratedOpticalResponse0-60MHz.png
Entry  Mon Jul 13 14:08:10 2015, ericq, Update, Electronics, New RF amps, housed ampBox.jpgampTFs.pngampTFs.zipampBox2.jpg
Entry  Wed Jan 7 12:15:17 2015, manasa, Update, General, New RF cables 
Entry  Thu May 5 13:13:32 2011, Jenne, Update, LSC, New RFPD screens are in 
Entry  Sun Apr 24 13:17:08 2022, Tommy, Update, Electronics, New RFSoC2x2 Overlay 
Entry  Tue Jul 24 12:06:41 2012, Masha, Update, PEM, New RMS channels, New C1PEM Overview NewRMSFrames.png
Entry  Thu Dec 10 17:12:43 2020, Jon, Update, , New SMA cables on order 
    Reply  Sat Dec 19 00:25:20 2020, Jon, Update, , New SMA cables on order 
    Reply  Sat Dec 19 02:42:56 2020, Koji, Update, , New SMA cables on order 
Entry  Fri May 8 14:27:25 2020, Hang, Update, BHD, New SRC gouy phase mode_spec_finesse.pdfmode_spec_ideal.pdf
Entry  Tue Apr 20 18:02:22 2010, Jenne, Update, COC, New SRM and PRM Hung 
Entry  Thu Jul 1 17:05:36 2010, josephb, kiwamu, steve, Update, CDS, New SUS Chassis in rack 
Entry  Wed Jul 30 18:45:01 2008, rana, Configuration, SUS, New SUS Drift Technology 
Entry  Thu Dec 9 00:32:56 2021, Tega, Update, CDS, New SUS medm screen update Screen_Shot_2021-12-09_at_12.29.30_AM.pngScreen_Shot_2021-12-09_at_12.42.35_AM.png
    Reply  Thu Dec 9 18:22:36 2021, Tega, Update, CDS, New SUS medm screen update Screen_Shot_2021-12-09_at_6.21.09_PM.png
    Reply  Fri Dec 10 18:55:58 2021, Tega, Update, CDS, New SUS medm screen update BLRMS_ITMY_screenshot.png
Entry  Thu Jul 4 17:14:53 2013, rana, Update, SUS, New SUS screen OM1.png
    Reply  Thu Jul 4 19:37:37 2013, Koji, Update, SUS, New SUS screen 
Entry  Tue Mar 15 13:49:44 2022, Ian MacMillan, Bureaucracy, Treasure, New Screwdriver Bits 
Entry  Tue Jul 28 20:42:50 2015, Jessica, Summary, General, New Seismometer Data Coherence Coherence1.pngCoherence2.png
Entry  Mon Apr 22 20:17:05 2013, Charles, Update, ISS, New Servo w/switching filters 6x
    Reply  Tue Apr 6 07:19:11 2021, Jon, Update, CDS, New SimPlant cymac 
Entry  Mon Apr 14 17:59:05 2014, Jenne, Configuration, PEM, New T-240 cable 
Entry  Tue Oct 6 07:37:20 2020, yehonathan, Update, Wiki, New TIS measurements of 40m Optics ITMU_sn01-02_tis_1.pdf
Entry  Wed Jul 6 17:17:22 2016, Praful, Update, Computer Scripts / Programs, New Tabs and Working Summary Pages 
    Reply  Wed Jul 6 21:05:36 2016, Koji, Update, Computer Scripts / Programs, New Tabs and Working Summary Pages cron_mail.txt.zip
    Reply  Wed Jul 6 21:09:09 2016, not Koji, Update, Computer Scripts / Programs, New Tabs and Working Summary Pages 
    Reply  Wed Jul 6 21:16:17 2016, Max Isi, Update, Computer Scripts / Programs, New Tabs and Working Summary Pages 
ELOG V3.1.3-