ID |
Date |
Author |
Type |
Category |
Subject |
11369
|
Mon Jun 22 14:21:42 2015 |
Steve | Metaphysics | Treasure | Jenne and Den graduated |
Last supper before departing at "Grazie" El Portal. All the best on your journey! |
Attachment 1: ls.jpg
|
|
11372
|
Tue Jun 23 11:18:20 2015 |
Steve | Update | PEM | cleaning around chambers |
Keven is our regular janitor is out for a few weeks.
The sub is careful- gentel Mario. We wiped arouind the vertex cambers north side on the floor and east arm racks.
|
11373
|
Wed Jun 24 08:05:43 2015 |
Steve | Update | PSL | laser turned on |
The laser went off around 11am yesterday. It was turned on |
Attachment 1: laserWasOff.png
|
|
11377
|
Thu Jun 25 15:07:50 2015 |
Steve | Update | safety | Surfs Safety 2015 |
Jessica Pena, Megan Kelly, Eve Chase and Ignacio Magana received 40m specific basic safety traning today. |
Attachment 1: surfs2015.jpg
|
|
11387
|
Wed Jul 1 10:01:25 2015 |
Steve | Update | VAC | RGA scan pd78 day 275 |
|
Attachment 1: rga275d.png
|
|
11388
|
Wed Jul 1 11:45:48 2015 |
Steve | Update | PEM | cleaning around ETMX chamber |
Quote: |
Keven is our regular janitor is out for a few weeks.
The sub is careful- gentel Mario. We wiped arouind the vertex cambers north side on the floor and east arm racks.
|
Mario wiped the floor around the ETMX chamber today. |
11439
|
Thu Jul 23 15:41:41 2015 |
Steve | Update | PEM | fitting ants with TERRO |
Pasadena got 0.2" of rain on Saturday. Temperatures were high with high humidity since than.The ants were back in the Control room east side benches.
We have started using TERRO Liquid Ant Baits in January 2015 This worked very well to this point.
Tree new packages were opened yesterday and the ants are gone.
We can conclude that these baits must be replaced after 6 mounts.
The liquid baits contains BORAX and it is safe.
|
11443
|
Fri Jul 24 13:49:09 2015 |
Steve | Update | safety | Lock doors please ! |
Thursday morning I found the control room emergency exit not locked.
Please check the doors when leaving the lab , specially when you are the last one out. |
11451
|
Tue Jul 28 14:58:59 2015 |
Steve | Update | General | do not place anything on optical table tops |
Specially heavy items: old analoge scope or hardware loaded boxes......etc
The table cover section holding crossbars are not evenly spaced.
You have to center each cover section on the cross bar so it is supported on both sides !
I will clean up on this table tomorrow
|
Attachment 1: tabletops!.jpg
|
|
Attachment 2: tabletops!!.jpg
|
|
11452
|
Tue Jul 28 15:05:09 2015 |
Steve | Update | safety | fire alarm test ? no |
We just had fire alarm trigged avacuation of the 40m lab.
It turned out that the CES building second floor sensor caused this action. |
Attachment 1: 6minGaps.png
|
|
11453
|
Tue Jul 28 15:06:27 2015 |
Steve | Update | IOO | PSL HEPA turned on |

|
Attachment 1: noHepa.jpg
|
|
11454
|
Tue Jul 28 16:42:25 2015 |
Steve | Update | General | Jamies entry was deleted |
Sorry Jamie, I accidentally deleted your elog entry #11453 |
11459
|
Wed Jul 29 14:32:01 2015 |
Steve | Update | General | How not to solder |
Quote: |
Quote: |
Koji and Steve,
The result: bad Guralp x-arm cable.
I will swap the short cables tomorrow at the base.
|
Short 46" long cables at the base plates were swapped. Their solderings looked horrible.
This cable actually worked at 5-5-2015
Bad cable at ETMY station now. The new cable should be a little bit longer ~52"
|
Koji could pull out easily 11 of the wires from their socket. |
Attachment 1: coldSoldering.jpg
|
|
11464
|
Thu Jul 30 10:38:18 2015 |
Steve | Update | PEM | Y sesimostation is back on |
Koji soldered new 50" long cable for the Y station.
|
Attachment 1: Guralps_are_back_on.png
|
|
Attachment 2: Ystation.jpg
|
|
11469
|
Thu Jul 30 15:24:54 2015 |
Steve | Update | PEM | Y sesimostation is back on |
Atm1, New short-50" long cable was installed at ETMY end ( Y-station ) between Guralp-B ( MIT ) and granite base.
Interface box input 2 was left connected to cable 1 and input 1 to cable 2. This plot shows no change.
Atm2, Than I swapped the two long cables at the interface box
Now the signal seems to be ok <2 Hz,
>2 Hz some problem exist.
Channel Name |
Location |
Seismometer |
40m long cable |
Interfacebox input
|
50" short cable
|
C1:PEM-RMS_GUR2X_.... |
ETMX |
Guralp -A |
2 |
2 |
Jenne's friend |
C1:PEM-RMS_GUR1X_.... |
ETMY |
Guralp-B |
1 |
1 |
Koji |
I will look for more bad soldering tomorrow. How many cables did she make?
|
Attachment 1: NewShortCable-Y-B-Gur2.png
|
|
Attachment 2: interfaceInputSwapped.png
|
|
Attachment 3: sameasAtm2.png
|
|
11473
|
Fri Jul 31 10:36:22 2015 |
Steve | Update | PEM | X seismo station short cable removed |
Quote: |
Atm1, New short-50" long cable was installed at ETMY end ( Y-station ) between Guralp-B ( MIT ) and granite base.
Interface box input 2 was left connected to cable 1 and input 1 to cable 2. This plot shows no change.
Atm2, Than I swapped the two long cables at the interface box
Now the signal seems to be ok <2 Hz,
>2 Hz some problem exist.
Channel Name |
Location |
Seismometer |
40m long cable |
Interfacebox input
|
50" short cable
|
C1:PEM-RMS_GUR2X_.... |
ETMX |
Guralp -A |
2 |
2 |
Jenne's friend |
C1:PEM-RMS_GUR1X_.... |
ETMY |
Guralp-B |
1 |
1 |
Koji |
I will look for more bad soldering tomorrow. How many cables did she make?
|
We have to redo this cable also |
Attachment 1: IMG_0009.JPG
|
|
11476
|
Mon Aug 3 08:16:19 2015 |
Steve | Update | SUS | ETMX damping restored |
|
Attachment 1: ETMXrestored.png
|
|
11483
|
Thu Aug 6 09:16:57 2015 |
Steve | Update | VAC | Chiara gets new Ethernet card |
- Yesterday we did put the vacuum system into safe to reboot mode for the ethernet card swap.
- Atm1, IFO pressure
- Atm2, as prepared valve configuration where " moving " means closed and disconnected
|
Attachment 1: ChiaraNetCard.png
|
|
Attachment 2: 23.png
|
|
11487
|
Mon Aug 10 15:25:05 2015 |
Steve | Update | PEM | wasp nest |
The wasp nest will be removed tomorrow from from the out side of the east arm window.
The resonant frequency of the newly arrived gravity bee detector is not known.
|
Attachment 1: waspN.jpg
|
|
11505
|
Fri Aug 14 09:07:45 2015 |
Steve | Update | PEM | Gur interface box is wonky |
Atm1, Before cable swap
Atm2, The long cables were swapped at the input of the interface box.
We can conclude that the problem is in the interface box
I wonder if interface box input 3 is wired? |
Attachment 1: Gur1&2.png
|
|
Attachment 2: longCablesSwapped.png
|
|
11514
|
Tue Aug 18 11:16:17 2015 |
Steve | Update | PEM | Gur interface box is wonky |
The Guralp ADC interface box D060506 is ready for inspection. It is in front of 1X1 with open top and running.
Obviously c7 as 1 miroF cap is missing.
Quote: |
Let's dismantle the I/F unit from the rack and connect the cable with the lid open.
We need to trace the signal.
|
|
Attachment 1: IMG_0009.JPG
|
|
11517
|
Wed Aug 19 07:58:25 2015 |
Steve | Update | PEM | Gur interface box |
Koji and Steve,
We took transferfunctions of each channel yesterday. They were identical ?. I will check the cables from ADC to DAQ next. |
Attachment 1: GurADCbox.jpg
|
|
11522
|
Fri Aug 21 08:38:37 2015 |
Steve | Update | IOO | PMC locked |
PMC needed to be locked manually. |
Attachment 1: PMClocked.png
|
|
11523
|
Fri Aug 21 17:15:13 2015 |
Steve | Update | PEM | Gur interface box |
Quote: |
As reported previously, the transfer functions of the channels look fine. (i.e. All channels almost identical.)
I checked the chain from the unit input to the DAQ BNC connectors. They were all OK.
Today I have been checking the signals on the unit with the long DB37 cables connected.
I could not see anything on the Gur2 channels on the board. I looked at the DB37 for Gur2 and felt something is wrong.
I opened the housing of the cable and realized that all the pins are not fully inserted.
The wires were crimped improperly and prevents them to be fully inserted.
=> We need to redo the crimping to insert them.
=> We need to check the other side too.
|
I'm making a new long cable. Both connector ends of this X arm long cable were terrible. It was removed from the cable tray yesterday.
The Y arm Guralp is running fine. The interface box is open in front of 1X1 on a cart and it is alive! Please be aware of it ! |
11531
|
Tue Aug 25 16:39:06 2015 |
Steve | Update | safety | safety training |
Alessandra Marrocchesi received 40m specific basic safety training yesteday. |
11537
|
Fri Aug 28 17:04:12 2015 |
Steve | Update | PEM | Gur interface box cable |
Ara! Onara suru tsu-mori datta keh-do, un-chi ga de-chatta...
Quote: |
Quote: |
As reported previously, the transfer functions of the channels look fine. (i.e. All channels almost identical.)
I checked the chain from the unit input to the DAQ BNC connectors. They were all OK.
Today I have been checking the signals on the unit with the long DB37 cables connected.
I could not see anything on the Gur2 channels on the board. I looked at the DB37 for Gur2 and felt something is wrong.
I opened the housing of the cable and realized that all the pins are not fully inserted.
The wires were crimped improperly and prevents them to be fully inserted.
=> We need to redo the crimping to insert them.
=> We need to check the other side too.
|
I'm making a new long cable. Both connector ends of this X arm long cable were terrible. It was removed from the cable tray yesterday.
The Y arm Guralp is running fine. The interface box is open in front of 1X1 on a cart and it is alive! Please be aware of it !
|
The new cable was made this way:
Pins were located with ohm meter for locations and both ends were cut off.The Belden 1424A cable than was soldered to DB37 and Guralp circular connector " IKPT06F16-26S-ND "
This cable will connect the ADC interface box CCD# DO 60506 to Guralp seismometer at the sout end.
The Guralp's each 3 axies will be connected through a twisted pair to the differential input op amp
Gur ouput vertical axis + - on circular connector A, B to DB37 pin 1 &20
Gur output N/S axis + - on circular connector C, D to DB37 pin 2 & 21
Gur output E/W axis + - on circular connector E, F to DB37 pin 3 & 22
Power +12 VDC from DB37 pin 29 to Gur circular connector pin c (lower case)
Power -12 VDC from DB37 pin 24 to Gur circular connector pin M Note: this connection was absent at the first test of this cable!
Ground from DB37 pin 10 to Gur circular connector pin b (lower case)
Summery: I may destored the opamp at the Guralp A at the south end.
|
Attachment 1: fixedNewLongCable.png
|
|
11554
|
Tue Sep 1 10:36:06 2015 |
Steve | Update | PEM | Gurs swapped |
Quote: |
To help find out if Steve really melted the inside of our precious seismometer, lets hook it up using the handheld seismo wand and see if it produces volts when we shake the ground.
Also, please stop using names like GurA or Gur1 or GurSuzy. We have GurX and GurY because they are at those ends. Anything else is confusing.
|
I moved Gur A from ETMX to ETMY . Gur B at ETMY was disconnected and its cable connected to Gur A
It seems that Gur A is alive. I will stop using A and B names after we stop swapping components. |
Attachment 1: GurA@ETMY.png
|
|
11566
|
Thu Sep 3 08:53:55 2015 |
Steve | Update | SUS | ETMY Oplev laser power is falling |
Rana, Steve
We investigated the ETMY oplev table set up and did not find a red herring.
Two 2 years vs one day plot below.
ps: thanks Q for fixing DTT, the auto scaling is not working at sampling rate 10 min and 1 hr period?? 
|
Attachment 1: ETMYoplev2y.png
|
|
11575
|
Fri Sep 4 09:36:48 2015 |
Steve | Update | LSC | IR beatnote confusion..... |
Quote: |
I was thinking that the "FOSC" product line (which is called a "coupler" instead of a "splitter/combiner") was what we wanted.
Koji brought to my attention that the 90/10 splitters we already have are of this line. So, I rigged a few up to shine a hopefully beating pair of fields on the fiber coupled thorlabs PD.
I was able to get ~80uW each of PSL and AUX X light on the PD, which produced a -10dBm beatnote! Thus, I think these FOSC splitters are indeed what we want.
I then threw this IR beatnote at our ALS signal chain. The beatnote was too big to throw through our ~+27dB RF amps, so I just sent the -10dBm over to the LSC rack.
The IR beat spectrum is somwhat noisier from 10-100Hz, but, more interesting, is that the sub-4Hz noise is identical in the two beats, and very coherent. This excludes ALS noise arising from anything happening in the green beat optics on the PSL table.
Obviously, the high frequency noise is largely the same and coherent too, but also coherent with the AUX X PDH control signal, so it is understood.
|
FOSC-2-64-50-L-1-H64F-2
Single mode coupler, 2x2, 1064nm +/-20nm, 50/50 ratio, 900micron loose tube jacket, Hi1060flex fiber, 1m fiber length, FC/APC connectors
Four of these items ordered yesterday from http://afwtechnologies.com.au/sm_coupler.html |
11576
|
Fri Sep 4 10:25:19 2015 |
Steve | Configuration | IOO | AOM stage is ready |
New stage can hold the correct polarization.
DRAWING CORRECTION: Post block height was lowered to be 1.88" from 2.0" |
Attachment 1: stage_AOM-EOM.jpg
|
|
Attachment 2: A-EOMholder.pdf
|
|
11591
|
Fri Sep 11 10:56:47 2015 |
Steve | Update | endtable upgrade | ETMY optical table feedthrough |
The ETMY enclosure feedthrough - north is installed. The sealing material is hard to work with.
The upper empty blocks will be replaced by something soft to make changing cables easy.
|
Attachment 1: ETMY-Nfeedt.jpg
|
|
11593
|
Mon Sep 14 10:41:03 2015 |
Steve | Update | VAC | TP2 dry pump replaced |
TP2 dry fore pump sn PLE10082 was replaced at pressure 717 mTorr, TP2 50K rpm 0.33A @ 112,677 hrs
Top seal life was 8,160 hrs
Model SH110, Sn LP1007L556 was installed. It's fore line pressure after 30 minutes of running 38 mTorr, TP2 turbo at 50K rpm 0.18A
|
Attachment 1: TP2_dry_pump_replaced.png
|
|
11600
|
Tue Sep 15 16:49:08 2015 |
Steve | Update | endtable upgrade | ETMY optical table feedthrough |
ETMY optical table enclosure feedthrough- south is in. Now it is time to see how air tightness increases performance.
Quote: |
The ETMY enclosure feedthrough - north is installed. The sealing material is hard to work with.
The upper empty blocks will be replaced by something soft to make changing cables easy.
|
|
Attachment 1: ETMYsFeedt.jpg
|
|
11608
|
Thu Sep 17 02:22:53 2015 |
Steve | Update | endtable upgrade | ETMY optical table feedthrough |
I doubt we'll see any effect until we carefully seal the holes. If there's 1 hole in your boat it still sinks.
Quote: |
ETMY optical table enclosure feedthrough- south is in. Now it is time to see how air tightness increases performance.
|
|
11610
|
Thu Sep 17 08:36:14 2015 |
Steve | Update | PEM | earth quake |
No damage. The BS sensor UR 0.220 V has been low for some times.
Dataviewer does not work for long term trend. |
Attachment 1: Chilian_eq_8.3M.png
|
|
Attachment 2: BS_UR_0.220V.png
|
|
Attachment 3: LowSensingV_BS-UR.png
|
|
11612
|
Thu Sep 17 16:04:09 2015 |
Steve | Update | PEM | Gurs |
ETMY - Guralp (B-MIT) was covered with copper lined can yesterday afternoon. It's long cable is connected to ADC interface box input 1
The vertex Trillium was covered just ~2 days before Ignacio left.
ETMX - Guralp (A-Caltech) is not covered. The long 40m cable is disconnected at the the south end.
|
11625
|
Mon Sep 21 11:12:14 2015 |
Steve | Update | VAC | cold cathode is flaky |
CC4 cold cathode gauge jump triggered interlock to close VM1 valve to protect the RGA.
The IFO pressure is 1e-5 Torr
Vac normal was recovered by opening VM1
|
Attachment 1: cc4jumps.png
|
|
11633
|
Tue Sep 22 08:58:38 2015 |
Steve | Update | VAC | cold cathode is flaky |
The cold cathode gauge is back to normal. cc4 is the last gauge is "functioning"
MKS is not responding. The spare controller and gauges are back for repair.
|
Attachment 1: 4and80days.png
|
|
11642
|
Fri Sep 25 11:08:33 2015 |
Steve | Update | SUS | wire standoffs |
Our last effort to change the existing Al-6061 wire standoffs was at April 2012
We requested sapphire and/or ruby materials with smaller R at the bottom of the groove. Groove polishing was asked for.
Insaco Inc. quote 84740 as " best effort " NO POLISHING. The groove cut to be with eximer laser.
Jeff Lewis as 9-12-2012: the LIGO sapphire prisms grooves were NOT POLISHED but Resonatics used the corner of a rasor blade to scrape off the
ablated material wich was redeposited in and around the grooves.
|
Attachment 1: wireStandOff_SOS.PDF
|
|
11643
|
Fri Sep 25 14:52:08 2015 |
Steve | Update | SUS | ETMX is not drifting |
We have talked about the drift of ETMX sus on the Wednesday meeting.
It has stopped moving on Jan 8, 2015 and it has been reasanable stable since than.
|
Attachment 1: ETMXstoppedDrifting.png
|
|
Attachment 2: 25daysArmsT.png
|
|
11644
|
Fri Sep 25 17:00:38 2015 |
Steve | Update | VAC | cold cathode is flaky |
The IFO pressure is estimated ~1E-6 Torr with modified Vac normal valve configuration.
CC4 is in a jumping mode between 2e-5 and 1e-6 Torr
Pressure based interlock kicks in to close VM1 at 2e-5 Torr to protect the RGA.
I did open VM1 repeatedly in the last few mornings but as cc4 jumps VM1 closes.
As VM1 closed to RGA scans are not seeing the IFO. I will look at some scans on Monday.
Mean while I opened VM2 to lower the pressure for the RGA. This change will be read by "Current Status: Undefined State"
So do not panic, the IFO pressure is normal.
I need someone's help to raise the interlock threshold to 5e-5 Torr
I'm buying a new cold cathode gauge on Monday.
note: cc1 is out of order!
just read P1 the pressure is < 7e-4 Torr This gauge is very reliable and it is at the low end of it's range.
|
Attachment 1: flakyCC4.png
|
|
11654
|
Wed Sep 30 15:44:06 2015 |
Steve | Update | General | Sun Fire X4600 |
Gautam and Steve,
The decommissioned server from LDAS is retired to the 40m with 32 cores and 128GB of memory in rack 1X7 http://docs.oracle.com/cd/E19121-01/sf.x4600/ |
11659
|
Fri Oct 2 15:11:08 2015 |
Steve | Update | PEM | cable squashed |
Cable numbered #53 from Accelerometer 4 to 1X7 / DAQ input c26 was squased while removing network card from Sun Fire x4600 today.
This cable has to be tested. |
11660
|
Fri Oct 2 15:33:09 2015 |
Steve | Update | safety | safety training |
Gautom has received 40m specific basic safety training today. |
11666
|
Mon Oct 5 10:11:35 2015 |
Steve | Update | VAC | RGA scan pd78 day 386 |
RGA background scan.
The IFO is closed off from RGA with VM1
CC4 ( and CC1) is still flaky and it's interlock closes VM1
|
Attachment 1: RGA_background.png
|
|
11668
|
Mon Oct 5 16:41:22 2015 |
Steve | Update | SUS | ETMY OL laser replaced |
This JDSU 1103P laser, sn P892324 lived for 2 years. It's power output is 0.05 mW now
It was replaced with brand new JDSU 1103P, sn P919645, Mfg date 12/2014 with 2.75 mW output.
There is 0.14 mW light returning to the qpd = 7,250 counts without AR 632 lenses |
11695
|
Fri Oct 16 18:27:52 2015 |
Steve | Update | VAC | vacuum normal condition |
Vacuum normal configuration with VM1-closed, VM2-open valve positions. Power load normal 24V 0.2A
Maglev rotation 560 Hz at room temp body temp.
"NO COMM" error message on medm screen. Gauge controller pressures are read able.
All vac comp LEDs are green. We have to reboot on Monday to enable communication.
|
Attachment 1: oct16Fpm2015.png
|
|
11705
|
Wed Oct 21 10:03:15 2015 |
Steve | Update | VAC | after running out of N2 |
Quote: |
[ericq, Gautam, Steve]
Following roughly the same procedure as ELOG 11354, c1vac1 and c1vac2 were rebooted. The symptoms were identical to the situation in that ELOG; c1vac1 could be pinged and telneted to, but c1vac2 was totally unresponsive.
The only change in the linked procedure was that we did not shut down the maglev. Since I unwittingly had it running for days without V4 open while Steve was away, we now know that it can handle shorter periods of time than that...
Upon reboot, many channels were readable again, unfortunately the channels for TP2 and TP3 are still blank. We were able to return to "Vacuum normal state," but because of unknowned communication problems with VM1's interlock, we can't open VM1 for the RGA. Instead we opened VM2 to expose the RGA to the main IFO volumn, but this isn't part of the "Normal" state definite, so things currently read "Undefined state".
|
Precondition:
1, Pressure gauges had no communication ( NO COMM ) with c1vac2
2, Lost N2 supply on Oct 9 This triggered a normal all valve closed condition. At this point you replace N2 cylinders and manually swich valves to recreate VAC NORMAL configuration in the correct sequential order.
The very last thing you do is open V1 gate valve.
a, check TP2 that is the forepump of the Maglev. Foreline pressure to drypump ~ 10- 100 mTorr, rotation speed 50 Krpm
b, open V4 if P2 <1Torr
c, check Maglev rotating at 560 Hz
d, open V1 if P1 <500 mTorr
e, check TP3 foreline, rotation speed and open V5 if P3 <1 Torr with VA6 closed
f, open VA6 if PAN <1 Torr
g, open annulos valves one by one , like VASE if PASE <1 Torr and so on...........Now the Current State: should read Vac Normal
3, Maglev run for 7 days with V4 closed. This encreased its foreline pressure to estimated few Torrs and its body temp rose ~30C on the outside.
So it was sweating and it may be back streamed.
The present RGA data is indicating that it had to be very mild.
The RGA will have better sensitivity with VM1 open and VM2 closed.
The PSL output shutter stayed open during these period is pointing to IFO pressure stayed P1 <3 mTorr
PROBLEM: P1 and P2 plot should show nothing where there is no communication.http://nodus.ligo.caltech.edu:8080/40m/151016_182003/oct16Fpm2015.png
How do we check if pressure based software interlocks are working in this no communication condition? |
Attachment 1: 1d_after_reboot.png
|
|
11706
|
Wed Oct 21 15:42:56 2015 |
Steve | Update | VAC | vacuum gauge check |
Convectron gauge check:
Brand new 10 years old convectron gauge at atm was swapped into the place of existing gauges to see if they read close to 760 Torrs
They did reasonable well at the low end. I tried to imitate calibration and bring down the high end with little success.
( P1 and P2 were reading 7e-4 to ~660 Torr The correction of the upper end pushed up the lower end too. I will correct this later
P3 and P4 high ends are way off )
The point is that they work. Convectron gauges will be replaced and calibrated at the next vent.
Interlocks were not triggered during this test. I was expected to close the PSL shutter when P1 was reading 760 Torr
This hide some problem or not understanding.
It was good to see CC1 and CC4 working at the moment
Somehow I succeded opening VM1 and closed VM2 = vacuum normal
I just hope it stays open overnight to get comparable RGA scan.
|
Attachment 1: Gauges.png
|
|
11707
|
Thu Oct 22 08:52:04 2015 |
Steve | Update | VAC | clean RGA scan after sweaty Maglev |
Clean comparable scan at vacuum normal. There was no backstreaming. |
Attachment 1: clean_scan.png
|
|