Thu Jan 10 11:32:40 2019, Chub, Update, VAC, Manual valve interfaced with CDS
|
Fri Jan 11 16:38:57 2019, gautam, Update, General, Some alignment checks 
|
Mon Jan 14 10:06:53 2019, gautam, Update, VAC, Vent 82 complete
|
Tue Jan 15 15:27:36 2019, gautam, Update, General, Lasers and other stuff turned back on
|
Mon Jan 23 15:16:52 2017, gautam, Update, Optical Levers, ETMY Oplev HeNe needs to be replaced
|
Mon Jan 23 17:24:26 2017, Steve, Update, Optical Levers, ETMY Oplev HeNe is running hot
|
Tue Jan 24 17:52:15 2017, Craig, Update, Optical Levers, ETMY Oplev HeNe is replaced 6x
|
Wed Mar 1 08:28:04 2017, Steve, Update, Optical Levers, oplev laser RIN 
|
Thu Mar 2 13:59:04 2017, Steve, Update, Optical Levers, oplev laser RIN
|
Thu Mar 2 17:58:45 2017, rana, Update, Optical Levers, oplev laser RIN
|
Fri Mar 3 17:24:21 2017, Steve, Update, Optical Levers, oplev laser RIN
|
Wed Mar 8 15:28:37 2017, Steve, Update, Optical Levers, oplev laser RIN 
|
Mon Apr 10 09:49:32 2017, Steve, Update, Optical Levers, oplev laser RIN test planning
|
Mon Apr 10 14:21:57 2017, rana, Update, Optical Levers, oplev laser RIN test planning
|
Tue May 30 13:36:58 2017, Steve, Update, Optical Levers, ETMY Oplev HeNe is replaced
|
Tue Jan 15 18:16:00 2019, gautam, Update, Optical Levers, ETMY Oplev HeNe needs replacement 
|
Fri Jan 18 12:52:07 2019, gautam, Update, Optical Levers, BS/PRM Oplev HeNe replaced
|
Fri Jan 18 15:34:37 2019, gautam, Update, Thermal Compensation, Elliptical reflector part number
|
Sun Jan 20 23:41:00 2019, Jon, Omnistructure, VAC, Notes on vac serial comm, adapter wiring
|
Fri Jan 18 17:44:14 2019, gautam, Update, VAC, Pumping on RGA volume
|
Tue Jan 22 20:45:21 2019, gautam, Update, VAC, New N2 setup
|
Wed Jan 23 18:11:56 2019, gautam, Update, Electronics, Ethernet Power Strip IP conflict
|
Fri Jan 25 12:49:53 2019, gautam, Update, Electronics, Ethernet Power Strip IP conflict resolved
|
Tue Jan 29 16:12:21 2019, Chub, Update, ,
|
Thu Jan 24 22:55:50 2019, gautam, Update, Electronics, Satellite box S/N 102 investigation 
|
Tue Jan 29 17:19:16 2019, gautam, Update, Electronics, Satellite box S/N 105 repaired
|
Tue Jan 15 10:52:38 2019, gautam, Update, SUS, EY door opened
|
Tue Jan 15 15:49:47 2019, gautam, Update, SUS, EY door opened
|
Sat Jan 19 15:33:18 2019, gautam, Update, SUS, ETMY OSEMs faulty 
|
Tue Jan 22 20:36:53 2019, gautam, Update, SUS, ETMY OSEMs faulty
|
Wed Jan 23 12:39:18 2019, gautam, Update, SUS, EY chamber work 6x
|
Wed Jan 23 23:12:44 2019, gautam, Update, SUS, Prep for FC cleaning
|
Thu Jan 24 15:32:31 2019, gautam, Update, SUS, Y arm cavity side first contact applied 
|
Tue Jan 29 22:12:40 2019, gautam, Update, SUS, Alignment prep
|
Wed Jan 30 11:54:24 2019, gautam, Update, SUS, More alignment prep 
|
Wed Jan 30 19:25:40 2019, gautam, Update, SUS, Xarm cavity alignment 
|
Fri Feb 1 01:24:06 2019, gautam, Update, SUS, Almost ready for pumpdown tomorrow
|
Fri Feb 1 13:16:50 2019, gautam, Update, SUS, Pumpdown 83 underway
|
Fri Feb 1 21:52:57 2019, gautam, Update, SUS, Pumpdown 83 underway
|
Fri Feb 1 14:44:14 2019, gautam, Update, SUS, Y arm FC cleaning and reinstall  
|
Wed Jan 16 16:25:25 2019, gautam, Update, SUS, Yarm locked
|
Fri Jan 18 21:34:18 2019, gautam, Update, SUS, Unused optic on EY table
|
Sat Jan 19 05:07:45 2019, Koji, Update, SUS, Unused optic on EY table
|
Tue Feb 5 10:22:03 2019, chub, Update, , oil added to RP-1 & 3
|
Wed Feb 6 10:07:23 2019, Chub, Update, , pre-construction inspection
|
Wed Jan 9 20:01:25 2019, Jon, Update, VAC, Second pumpdown completed 
|
Thu Jan 10 10:23:46 2019, gautam, Update, VAC, overnight leak rate
|
Sat Feb 2 21:53:24 2019, Koji, Update, VAC, overnight leak rate
|
Sun Feb 3 15:15:21 2019, gautam, Update, VAC, overnight leak rate 
|
Sun Feb 3 20:52:34 2019, Koji, Update, VAC, overnight leak rate
|
Mon Feb 4 12:23:24 2019, gautam, Update, VAC, pumpdown 83 - leak tests
|
Tue Feb 5 10:11:30 2019, gautam, Update, VAC, leak tests complete, pumpdown 83 resumed 
|
Tue Feb 5 19:30:14 2019, gautam, Update, VAC, Main volume at 20 uTorr
|
Thu Feb 7 13:55:25 2019, gautam, Update, VAC, RGA turned on
|
Thu Feb 7 19:28:46 2019, gautam, Update, VAC, IFO recovery
|
Fri Feb 8 02:00:34 2019, gautam, Update, SUS, ITMY has tendency of getting stuck
|
Thu Feb 7 17:27:53 2019, Koji, Summary, Tip-TIlt, Five FiveNine Optics Optics delivered
|
Fri Feb 8 00:20:56 2019, gautam, Summary, Tip-TIlt, Five FiveNine Optics Optics delivered
|
Fri Feb 8 20:35:57 2019, gautam, Summary, Tip-TIlt, Coating spec 
|
Thu Feb 14 15:37:35 2019, gautam, Update, VAC, Vacromag failure  
|
Thu Feb 14 18:16:24 2019, Jon, Update, VAC, Vacromag failure
|
Thu Feb 14 23:14:12 2019, gautam, Update, CDS, c1rfm errors
|
Fri Feb 15 15:22:08 2019, gautam, Update, CDS, c1rfm errors persist
|
Mon Feb 4 20:13:39 2019, gautam, Update, SUS, ETMY suspension oddness  
|
Thu Feb 7 19:34:18 2019, gautam, Update, SUS, ETMY suspension oddness 
|
Fri Feb 8 20:48:52 2019, gautam, Update, LSC, IFO recovery
|
Mon Feb 11 15:41:49 2019, gautam, Update, LSC, TRY 60 Hz solved - but clipping persists
|
Mon Feb 11 16:38:34 2019, gautam, Update, LSC, ETMY OL calibration updated 
|
Fri Feb 15 18:42:57 2019, gautam, Update, LSC, TRY 60 Hz solved
|
Fri Feb 15 11:58:45 2019, Jon, Update, VAC, Vac system is back up
|
Fri Feb 15 18:41:18 2019, rana, Update, VAC, Vac system is back up
|
Fri Feb 15 19:50:09 2019, rana, Update, VAC, Vac system is back up
|
Fri Feb 15 20:07:02 2019, Jon, Update, VAC, Updated vacuum punch list
|
Fri Feb 15 21:15:42 2019, gautam, Update, VAC, dd backup of c1vac made
|
Mon Feb 11 19:53:59 2019, gautam, Summary, Loss Measurement, Loss measurement setup 
|
Tue Feb 12 18:00:32 2019, gautam, Summary, Loss Measurement, Loss measurement setup
|
Tue Feb 12 22:59:17 2019, gautam, Summary, Loss Measurement, Y arm loss 
|
Wed Feb 13 02:28:58 2019, gautam, Summary, Loss Measurement, Y arm loss
|
Thu Feb 14 21:29:24 2019, gautam, Summary, Loss Measurement, Inferred Y arm loss  
|
Sun Feb 17 17:35:04 2019, gautam, Summary, Loss Measurement, Inferred X arm loss   
|
Tue Feb 19 19:03:18 2019, rana, Update, Computers, Martian router -> WPA2
|
Tue Feb 19 22:52:17 2019, gautam, Update, ASS, Y arm clipping doubtful  
|
Wed Feb 20 18:26:05 2019, gautam, Update, IOO, IPPOS recommissioned 
|
Fri Feb 22 12:19:46 2019, gautam, Update, IOO, TT coil driver Vmon
|
Mon Feb 25 20:20:07 2019, Koji, Update, SUS, DIN 41612 (96pin) shrouds installed to vertex SUS coil drivers
|
Wed Feb 27 21:34:21 2019, gautam, Update, General, Suspension diagnosis
|
Sat Mar 2 14:19:35 2019, gautam, Update, CDS, FSS Slow servo gains not burt-ed
|
Sun Mar 3 14:16:31 2019, gautam, Update, IOO, Megatron hard-rebooted
|
Mon Jul 9 17:29:28 2018, Udit Khandelwal, Summary, Tip-TIlt, TipTilt mirror holder final changes   
|
Tue Mar 5 15:56:27 2019, gautam, Summary, Tip-TIlt, Discussion points about TT re-design
|
Fri Mar 8 08:40:26 2019, Anjali, Configuration, , Frequency stabilization of 1 micron source
|
Thu Mar 14 23:26:47 2019, Anjali, Update, ALS, ALS delay line electronics
|
Sun Mar 17 13:35:39 2019, Anjali, Update, ALS, Power splitter characterization   
|
Sun Mar 17 21:06:17 2019, Anjali, Update, ALS, Amplifier characterisation   
|
Mon Mar 18 18:10:14 2019, Koji, Summary, General, Task items and priority
|
Mon Mar 18 20:22:28 2019, gautam, Update, ALS, ALS stability test
|
Wed Mar 20 12:31:30 2019, Jon, Update, VAC, Doing vac controls work
|
Wed Mar 20 20:07:22 2019, Jon, Update, VAC, Doing vac controls work
|
Thu Mar 21 12:46:22 2019, Jon, Update, VAC, More vac controls upgrades
|
Thu Mar 21 17:22:52 2019, Jon, Update, VAC, More vac controls upgrades
|
Thu Mar 21 18:09:36 2019, Koji, Update, CDS, db file preparation for acromag c1susaux
|
Thu Dec 20 21:29:41 2018, Jon, Omnistructure, Upgrade, Vacuum Controls Switchover Completed
|
Fri Dec 21 11:13:13 2018, gautam, Omnistructure, VAC, N2 line valved off 
|
Fri Dec 21 12:57:10 2018, Koji, Omnistructure, VAC, N2 line valved off
|
Thu Jan 3 15:08:37 2019, gautam, Omnistructure, VAC, Vac status unknown  
|
Fri Jan 4 17:43:24 2019, gautam, Update, CDS, Timing issues
|
Wed Jan 9 11:33:35 2019, gautam, Update, CDS, Timing issues still persist 
|
Fri Jan 4 10:25:19 2019, Jon, Omnistructure, VAC, N2 line valved off
|
Thu Mar 21 18:36:59 2019, Jon, Omnistructure, Upgrade, Vacuum Controls Switchover Completed
|
Wed Mar 20 19:26:25 2019, Jon, Update, VAC, Protection against AC power loss
|
Thu Mar 21 21:50:31 2019, rana, Update, VAC, Protection against AC power loss
|
Mon Mar 25 10:21:05 2019, Jon, Update, Upgrade, c1susaux upgrade plan  
|
Tue Mar 26 04:25:13 2019, Johannes, Update, Upgrade, c1susaux upgrade plan
|
Tue Mar 26 18:35:06 2019, Jon, Update, Upgrade, Modbus IOC is running on c1susaux2
|
Thu Mar 28 23:29:00 2019, Koji, Update, SUS, Suspension PD whitening and I/F boards modified for susaux replacement  
|
Fri Mar 29 11:43:15 2019, Jon, Update, Upgrade, Found c1susaux database bug
|
Fri Mar 29 15:47:58 2019, gautam, Update, AUX, AUX laser fiber moved from AS table to PSL table
|
Sun Mar 31 18:39:45 2019, Anjali, Update, AUX, AUX laser fiber moved from AS table to PSL table  
|
Tue Apr 2 14:53:57 2019, gautam, Update, CDS, c1vac added to burt
|
Mon Apr 1 12:01:52 2019, Jon, Update, CDS,
|
Mon Apr 1 22:33:00 2019, gautam, Update, CDS, ITMY freed
|
Tue Apr 2 15:02:53 2019, Jon, Update, CDS, ITMY freed
|
Fri Apr 5 11:40:57 2019, Anjali, Update, Frequency noise measurement, Frequency noise measurement of 1 micron source   
|
|