7548
|
Mon Oct 15 14:51:16 2012 |
Jenne | Update | SUS | SUS were kicked hard as a result |
|
|
7549
|
Mon Oct 15 17:08:01 2012 |
Steve | Update | VAC | vacuum is back with some disabled valves |
|
   |
7550
|
Mon Oct 15 20:45:58 2012 |
jamie | Update | IOO | c1lsc DAC0 now connected to tip-tilt SOS DW boards | The tip-tile SOS dewhite/AI boards are
now connected to the digital system.
|
|
7551
|
Mon Oct 15 22:16:09 2012 |
Jenne | Update | SUS | All oplev gains turned to 0 | Steve has promised to fix up all of the
oplevs, but it hasn't happened yet, so I've
turned all of the oplev gains to zero, so |
|
7552
|
Mon Oct 15 22:24:45 2012 |
Jenne | Update | Computers | Lots of new White :( | Evan and I are starting to lock, and there
is lots of new, unfortunate white stuff on
several different screens. |
|
7553
|
Tue Oct 16 00:08:26 2012 |
Den | Update | IOO | c1lsc DAC0 now connected to tip-tilt SOS DW boards |
|
|
7554
|
Tue Oct 16 00:33:29 2012 |
Jenne | Update | LSC | POP lens placed on POX table, 2 PRMI movies | [Evan, Jenne]
We aligned the PRMI. We definitely
can lock MICH, but we're not really sure |
|
7555
|
Tue Oct 16 02:34:38 2012 |
Koji | Update | LSC | POP lens placed on POX table, 2 PRMI movies | How
can you lock the PRMI without the REFL beams?
|
|
7556
|
Tue Oct 16 11:38:17 2012 |
Jenne | Update | LSC | More PRMI notes from last night |
|
|
7557
|
Tue Oct 16 11:54:05 2012 |
Jenne | Update | IOO | MC alignment?? | The MC won't survive the boosts right now.
Pizza meeting is in a minute, and I won't
be back to the lab before ~3:30 because of |
|
7558
|
Tue Oct 16 16:46:20 2012 |
Vent Czar and Czarina | Summary | General | vent stuff | We're discussing the plan for the next
vent. Now that we have all the tip-tilt
stuff in hand, we should get ready for the |
|
7559
|
Tue Oct 16 17:06:47 2012 |
Steve | Update | SAFETY | safety training | Ayaka Shoda, visiting graduate student
received basic 40m specific safety training
today |
|
7560
|
Tue Oct 16 17:13:23 2012 |
Czarina | Summary | General | vent stuff - 4 paths | I see 4+
possible paths for us to take, in terms of
a possible vent in the next few weeks: |
|
7561
|
Tue Oct 16 20:40:06 2012 |
Den | Update | IOO | c1lsc DAC0 now connected to tip-tilt SOS DW boards | Full cable path from coil driver
to osem input is now ready. I've tested Ch1-4
of the left AI and left coil driver. 15 pin |
 |
7562
|
Tue Oct 16 21:57:47 2012 |
Den | Update | PEM | accelerometers | All accelerometers are now at the table
behind 1X4, cables are near readout box. |
|
7563
|
Wed Oct 17 08:01:54 2012 |
Steve | Update | General | do not leave op-table open | ETMX optical table was left open. Burned
toast award goes to ......? |
|
7564
|
Wed Oct 17 08:04:31 2012 |
Steve | Update | VAC | Roughing pumps on for oil change | PR1, PR2 and RP3 turned on for warming
up for oil change. Oil changed with 3.2L
of MVT-19 |
|
7565
|
Wed Oct 17 08:05:10 2012 |
Den | Update | General | do not leave op-table open |
|
|
7566
|
Wed Oct 17 08:30:49 2012 |
Steve | Update | SUS | PTICH damping needed |
|
|
7567
|
Wed Oct 17 09:01:37 2012 |
Steve | Update | PEM | ants on the PSL table |
|
|
7568
|
Wed Oct 17 11:15:05 2012 |
Den | Update | SUS | PITCH damping needed |
|
|
7569
|
Wed Oct 17 18:41:27 2012 |
Jenne | Update | Cameras | Camera looking at ETMY baffle | The camera titled "watec_mobile"
is looking at the front of the black glass
baffle (i.e. the side facing the ITM) on |
|
7570
|
Wed Oct 17 19:35:58 2012 |
Koji | Update | Computers | Re: Lots of new White :( | Solved. The power code of c1iscaux was
loose.
|
|
7571
|
Thu Oct 18 02:42:38 2012 |
Den | Update | SUS | PITCH damping needed |
|
7x |
7572
|
Thu Oct 18 03:45:56 2012 |
Jenne | Update | IOO | MCL, WFS triggers |
|
|
7573
|
Thu Oct 18 03:57:20 2012 |
Jenne | Update | Locking | Alignment is really bad?? | The goal of the night was to lock the Y
arm. (Since that didn't happen, I moved
on to fixing the WFS since they were hurting |
|
7574
|
Thu Oct 18 08:00:40 2012 |
jamie | Update | Computers | Re: Lots of new White :( |
|
|
7575
|
Thu Oct 18 12:02:32 2012 |
Den | Update | IOO | MCL, WFS triggers |
|
|
7576
|
Thu Oct 18 15:36:57 2012 |
Steve | Update | Cameras | Watec cameras & Tamron lenses | I purchased 3x 1/2"
ccd cameras and 3x F 50
mm lenses for the lab. |
|
7577
|
Fri Oct 19 00:55:35 2012 |
Jenne | Update | Computers | c1lsc is down (at least all of the models) | When Evan and I were dithering the BS and
ITMY (see his elog), I noticed that c1lsc
was acting weird. the IOP was the only |
|
7578
|
Fri Oct 19 01:11:18 2012 |
Jenne | Update | IOO | MCL, WFS triggers |
|
|
7579
|
Fri Oct 19 01:21:42 2012 |
Evan | Update | Locking | Aligning PZTs, PRM | [Evan, Jenne]
Tonight we made an attempt at getting
the PRM + ITMY aligned with correct input |
|
7580
|
Fri Oct 19 12:45:12 2012 |
Den | Update | CDS | c1lsc is up after reboot | |
|
7581
|
Fri Oct 19 16:24:39 2012 |
rana | Update | Locking | Alignment is really bad?? |
VENT |
|
7582
|
Fri Oct 19 16:45:39 2012 |
Steve | Update | VAC | vent has started |
|
|
7583
|
Fri Oct 19 18:30:07 2012 |
Den | Update | SUS | PITCH damping needed |
|
 |
7584
|
Fri Oct 19 19:26:42 2012 |
Jenne | Update | VAC | vent has started |
|
|
7585
|
Sat Oct 20 01:23:56 2012 |
Den | Update | SUS | PITCH damping needed |
|
  |
7586
|
Sat Oct 20 20:37:55 2012 |
Den | Update | SUS | PITCH damping needed |
|
   |
7587
|
Mon Oct 22 09:10:07 2012 |
Steve | Update | VAC | @750Torr |
|
|
7588
|
Mon Oct 22 11:26:12 2012 |
rana | Update | SUS | PITCH damping needed |
Too bad - I thought it would at least
give a little damping. Since we want the |
|
7589
|
Mon Oct 22 20:44:49 2012 |
Ayaka | Update | Adaptive Filtering | microphone noise | I will do some experiments on acoustic
noise canceling during my stay.
Now I am planning to cancel acoustic |
|
7590
|
Mon Oct 22 21:20:36 2012 |
Jenne | Update | PSL | Beam attenuation optics in place | [Jenne, Raji (before dinner)]
We put the beam attenuation optics
in place. Before putting any optics |
|
7591
|
Tue Oct 23 00:41:55 2012 |
Jenne | Update | Alignment | MC locked, spots centered | [Jenne, Raji]
We replaced the MC Refl path BS with
the Y1, as usual, so that the full ~100mW |
|
7592
|
Tue Oct 23 00:51:41 2012 |
Jamie | Update | Adaptive Filtering | microphone noise |
|
|
7593
|
Tue Oct 23 01:46:53 2012 |
Den | Update | SUS | PITCH damping needed |
|
 |
7594
|
Tue Oct 23 08:45:00 2012 |
Steve | Update | VAC | vent day 3 |
|
 |
7595
|
Tue Oct 23 09:37:33 2012 |
Steve | Update | SUS | passive TT adjustment correction |
|
|
7596
|
Tue Oct 23 10:24:42 2012 |
Ayaka | Update | Adaptive Filtering | microphone noise |
|
|
7597
|
Tue Oct 23 16:18:03 2012 |
Steve | Update | VAC | Roughing pumps on for oil change |
|
|