Entry  Fri Jan 9 10:52:37 2015, Steve, Update, SUS, PIT trend plots at the ends susPITends.png
Entry  Tue Jan 20 09:32:19 2015, Steve, Update, PEM, dusty Monday morning dustyMorning.png
    Reply  Fri Jan 23 10:07:15 2015, Steve, Update, SUS, SUS Drift ETMX vs ETMY SUSdrift30d.png
    Reply  Wed Jan 28 08:53:01 2015, Steve, Update, PEM, Seismometer Vertex is covered 
    Reply  Fri Feb 6 10:03:23 2015, Steve, Update, PEM, dusty days duststorm.png
Entry  Mon Feb 9 08:40:49 2015, Steve, Update, SUS, recent earthquake 4.9 M4.9Baja.png
Entry  Wed Feb 25 14:35:32 2015, Steve, Update, safety, safety audit 2015 safety2015audit.jpg
    Reply  Fri Feb 27 14:17:51 2015, Steve, Update, safety, safety audit 2015 1064Tchecked.jpg
    Reply  Tue Mar 3 09:42:40 2015, Steve, Update, SUS, ETMX is drifting ETMXdrifting.pngETMXvsTemp.png
    Reply  Tue Mar 3 11:38:11 2015, Steve, Update, safety, professional crane inspection 450lbs2015.jpg
Entry  Thu Mar 5 10:32:58 2015, Steve, Update, SUS, BS oplev servo turned off 
Entry  Wed Mar 11 13:54:18 2015, Steve, Update, General, temporaly storage in the east arm greenG.jpgEastArm.jpg
    Reply  Thu Mar 19 16:58:19 2015, Steve, Summary, IOO, MC alignment not drifting; PSL beam is drifting driftingInputBeam2.jpg
    Reply  Fri Mar 20 10:51:09 2015, Steve, Summary, IOO, MC alignment not drifting; PSL beam is drifting eom4.jpgeom3.jpg
    Reply  Sun Mar 22 18:42:40 2015, Steve, Update, VAC, vac pressure rose to 1.2mTorr NoN2.pngPressureReadingWorks.png
    Reply  Mon Mar 23 09:42:29 2015, Steve, Summary, IOO, 4" PSL beam path posts .75odSSpost.pdfMC_mml_trans_clamp.jpgPMCmmLn.jpg
    Reply  Wed Mar 25 08:29:31 2015, Steve, Update, LSC, Meh 
    Reply  Thu Mar 26 10:41:06 2015, Steve, Update, IOO, The PMC is not clamped IMG_0001.JPGPMCstops.jpgPMCballv.jpg
    Reply  Tue Mar 31 09:03:32 2015, Steve, Update, VAC, RGA scan pd78 day 182 RGApd78d182.png
Entry  Wed Apr 1 10:50:59 2015, Steve, Update, PEM, construction ahead largeMITchamber.jpg
Entry  Fri Apr 3 10:46:32 2015, Steve, Update, SUS, OSEM sensor oscillation sensors1sec.png
    Reply  Fri Apr 3 15:15:55 2015, Steve, Update, SUS, BS oplev 
    Reply  Mon Apr 6 09:13:49 2015, Steve, Update, PEM, jackhammering at ETMX jackhammerCalb.pngjackHcalETMX.jpgjackHetmx.png
    Reply  Thu Apr 9 07:41:22 2015, Steve, Update, PEM, jackhammering at ETMX moreJackHam.pngGTRX.jpg
    Reply  Tue Apr 14 11:19:52 2015, Steve, Update, PEM, large chamber has arrived ETMXfriend.png8000lbs.png
Entry  Thu Apr 16 10:32:42 2015, Steve, Update, Optical Levers, oplevs monitoring oplevCond.png
Entry  Tue Apr 21 11:55:05 2015, Steve, Update, Optical Levers, 1103P noise measurement 1103P@qpdBS.jpgoplev1103P.pngoplevSum1103Pbs.png
    Reply  Wed Apr 22 11:21:51 2015, Steve, Update, Optical Levers, BS & PRM oplevs are back to normal 
Entry  Wed Apr 22 11:43:28 2015, Steve, Update, SUS, ETMX damping restored 
    Reply  Thu Apr 23 08:43:40 2015, Steve, Update, Electronics, EG&G InGaAs diodes in stock 
Entry  Thu Apr 23 15:40:41 2015, Steve, Update, General, torque for 1/4-20 snapon.jpgQJR117E.jpg
    Reply  Mon Apr 27 09:09:15 2015, Steve, Update, PEM, air cond filters checked 400d.png
    Reply  Mon Apr 27 14:37:55 2015, Steve, Update, VAC, N2 pneumatic pressure watch  
    Reply  Tue Apr 28 09:49:26 2015, Steve, Update, VAC, Vac Summery Channels 
    Reply  Thu Apr 30 16:30:25 2015, Steve, Update, VAC, N2 pneumatic pressure watch set up 
    Reply  Tue May 5 16:02:57 2015, Steve, Update, VAC, Vac Summery Channels with discription 
    Reply  Fri May 8 08:16:46 2015, Steve, Update, LSC, drift in Y arm 1goodday.pngYishappy.png
    Reply  Fri May 8 14:30:09 2015, Steve, Update, VAC, CC1 cold cathode gauges are baked now cc1bake95C.jpg
    Reply  Tue May 12 14:57:52 2015, Steve, Update, VAC, CC1 cold cathode gauges are baked now 
    Reply  Wed May 13 13:33:34 2015, Steve, Frogs, PEM, Guralp breakout box recovered 
Entry  Fri May 15 16:18:28 2015, Steve, Update, VAC, Vac Operation Guide 
    Reply  Tue May 26 11:05:10 2015, Steve, Update, PEM, worked around ETMY seism. ETMYseismic.pngcut.jpg
    Reply  Thu May 28 10:42:19 2015, Steve, Update, PEM, bad Guralp X-cable Gurs180dXbad.pngswappedGurs.png
    Reply  Thu May 28 16:43:52 2015, Steve, Update, PEM, Guralps swapped GursSwapped.png
Entry  Mon Jun 1 08:32:14 2015, Steve, Update, SUS, PRM damping restored indio3.8Meq.png
    Reply  Mon Jun 1 15:22:19 2015, Steve, Update, PEM, Guralps X- short cable is bad seismGur1-2.png
Entry  Wed Jun 3 11:55:52 2015, Steve, Update, Optical Levers, PRM-BS oplev  PRM-BS_oplEr_noLenses.pngPRM-BSopl_3jun2015.jpgopServos.png10d_trend_opl.pngopl_trend_40d.png
    Reply  Tue Jun 9 10:57:12 2015, Steve, Update, SUS, BS oplev laser tuned 100dBStrend0425.png18dBSdrift.png
Entry  Wed Jun 10 15:54:14 2015, Steve, Update, VAC, Vacuum comp. rebooted afterReb061015.png
    Reply  Fri Jun 12 08:40:17 2015, Steve, Update, VAC, Vacuum comp. rebooted vacMonNoGauges.pngprepReboot.png