  7637   Mon Oct 29 09:33:42 2012 SteveUpdateSUSPRM & ETMY sus damping restored    
  7645   Wed Oct 31 14:31:34 2012 SteveUpdatePEMhigh particle countHigh particle count confirmed with #2 counter  highparticlec.png 
  7656   Thu Nov 1 17:37:00 2012 SteveUpdateGeneralbronze bushing for 40m vacSuprema- SS clear edge mirror mount 2"
diameter is modified for 40m vacuum use.
One left and one right handed one. It's adjustment
 IMG_1764.JPG 
  7663   Fri Nov 2 16:09:14 2012 SteveUpdateGeneralOpen-sided mount - why

    

       
            
  
  7669   Mon Nov 5 10:34:48 2012 SteveUpdateVACexisting vacuum documents

    

       
            
  
  7679   Wed Nov 7 09:09:02 2012 SteveUpdateAlignmentAlignment-PRM and SRM  OSEM LL 1.5V are they misaligned?  9amNov7w.png 
  7680   Wed Nov 7 11:43:29 2012 SteveUpdatePEMhigh particle count ALARTThe BS camber is open only. We should close
ASAP
Outside air quality is 1.7- 2.2 
 highpartcount.png 
  7681   Wed Nov 7 14:59:35 2012 SteveUpdatePEMhigh particle count ALART & oplevs

    

       
            
 oplevs.png 
  7682   Wed Nov 7 15:17:15 2012 SteveUpdateAlignmentsteering option with pico motor?We have two ready for vacuum 1.5" mirror mounts
with pico motors in our hands. 
 IMG_1795.JPG 
  7687   Thu Nov 8 09:04:45 2012 SteveUpdateCamerasCanon T3i purchasedCanon
EOS Rebel T3i has been purchased. See
rating
 BH_409130400.pdf 
  7692   Fri Nov 9 08:11:57 2012 SteveUpdateAlignmentnothing moved - all good Oplevs and IP ANG are still centered.
Why  do the SRM and PRM move 5X 
more ?  I could not check the sensing
 opsingGOOD.pngop8h.png8amF.pngkeepfailing.png 
  7696   Mon Nov 12 09:21:10 2012 SteveUpdateVACpumpdown has startedI'm looking for IOO steering mirror power
supplies. I found two so far: one at 1Y3
as Kepco  + 75V and one at OMC_North
 beforepd.pngIMG_1800.JPGIMG_1801.JPG 
  7697   Mon Nov 12 16:52:03 2012 SteveUpdateVACpumpdown has completed The pressure is CC1 3e-4 Torr at
8 hours of pumping.  Status: vacuum
normal
 pd74.pngpd74at8h.png 
  7703   Tue Nov 13 08:34:11 2012 SteveSummaryVACpumpdown after 24days at atmosphere 
 
 pd74d1.png24datm.pngpdd1.png 
  7725   Mon Nov 19 15:58:02 2012 SteveUpdateSAFETYsafety trainingCharles Blakemore  our new undergrad
help received 40m specific safety training
today.
  
  7732   Tue Nov 20 15:11:22 2012 SteveUpdateGeneralfew more sensing cardsNew  Lumitek IR
Sensor Cards are here. We got 2 pieces
of Q-11-T (2" x 2"), 2 pieces of
  
  7744   Mon Nov 26 10:58:20 2012 SteveUpdatePEMair cond maitenance tomorrowAir conditioning maintenance is scheduled
for tomorrow morning till noon.
  
  7753   Tue Nov 27 09:44:09 2012 SteveUpdateVACpumpdown at 15 days It took 15 days to reach 1e-5 Torr
The RGA was turned on yesterday.
The rga scan plotting was not working. Den
 pd74m15d.pngpd74m15d_rga1d.png 
  7754   Tue Nov 27 11:27:22 2012 SteveUpdatePEMparticle count is going up

Jeff is still working on the filter banks.
 5yparticles.pngparticle_6m_6m.png1y_particlec.png10y_particle_c.png 
  7755   Tue Nov 27 17:45:42 2012 SteveUpdateGeneralspare optics of AP table moved to cabinetSpare optics from the AP table were moved
to glass cabinet in the east arm. I'm not
sure this is the right place. We'll see what
 IMG_1819.JPG 
  7765   Fri Nov 30 09:59:53 2012 SteveHowToGeneralHow not toClean cabinet S15 doors were left open.
You have to lock it up!
  
  7766   Fri Nov 30 11:38:35 2012 SteveUpdatePSLfoil removed from enclosureAluminum foil replaced by sheet metal on
Enclosure and AP table.
 IMG_1822.JPG 
  7776   Mon Dec 3 07:40:00 2012 SteveHowToAlignmenthow was the BS chamber misalinged

    

       
            
 BSsupport.jpg 
  7777   Mon Dec 3 16:37:09 2012 SteveUpdatePEMEM 172 microphones ordered

    

       
            
  
  7780   Tue Dec 4 10:44:36 2012 SteveUpdatePEMshort power outage    
  7781   Tue Dec 4 10:51:10 2012 SteveUpdateSUSPRM damping restoredPRM oplev gains set to zero from PIT 0.15
and YAW -0.3 and damping restored
  
  7807   Tue Dec 11 08:53:52 2012 SteveHowToPEMcables needs careHow NOT
to:
The
 IMG_1839.JPG 
  7849   Tue Dec 18 10:43:20 2012 SteveUpdateVACvent has completed The 40m vacuum envelope is at atm   
It took 4.5 hours at ~3 Torr/min speed. Atm1
 
 vent74.pngbvent.pngbefVent.png 
  7853   Tue Dec 18 16:37:40 2012 SteveUpdateVAClast RGA scan before vent 
 
 pd74m36d.png36d_vacuum_normal.png 
  7855   Wed Dec 19 11:14:25 2012 SteveUpdateSUSBeCu wire in stock

    

       
            
  
  7856   Wed Dec 19 11:53:23 2012 SteveUpdateVACAC removed Koji, Manasa, Jenne, Jamie, Bob and
Steve
Access connector removed this morning
 workingatatm.png 
  7862   Thu Dec 20 10:35:27 2012 SteveUpdateIOOTT1 connections

    

       
            
  
  7868   Fri Dec 21 09:55:23 2012 SteveUpdateGeneralin-vac adapter cables for TTs 
 Accu-Glass
is closed till Jan 2, 2013
 extensioncable.pdfgenderchanger.pdf 
  7895   Mon Jan 14 09:08:37 2013 SteveUpdatePSLPMC is only ok short term 
 The PMC PZT voltage slider
seemed sticky.  First it would not do
 pmc8d.png 
  7903   Wed Jan 16 08:29:45 2013 SteveUpdateSUSPRM damping restoredPRM oplev servo turned off.  OLPIT
servo gain 0.15 and OLYAW  -0.3 set
to ZERO.  PRM damping restored
  
  7914   Thu Jan 17 17:04:49 2013 SteveUpdateVACvac monitor screen changedThe COVAC_MONITOR.adl was changed. Ion
pump labeled as disconnected means: ion pump
controller power turned off and ion pump
 screenmod.png 
  7923   Tue Jan 22 09:10:19 2013 SteveUpdatePEMbig foot is dirtyPlease wipe, clean car wheels and wear
booties entering the 40m lab.
Obviously this person has no idea
 IMG_1873.JPGIMG_1874.JPG 
  7924   Tue Jan 22 09:18:50 2013 SteveUpdateTip - Tilttip tilt bases orderedThe corrected drawing base for tip tilt
with coils are going to the shop. The will
be back by the end of the week.
 TTbc.PDF 
  7925   Tue Jan 22 11:09:58 2013 SteveUpdateTip - TiltSS mirror holder orderedKoji's design of the SS  2" mirror
holder with flexure spring optic retainer 
like Polaris-K1 has been ordered. We are
 D1201574_v1_Tip-Tilt_Mirror_Holder.SLDDRW 
  7936   Thu Jan 24 08:28:35 2013 SteveUpdateVACwhen to pumpdown ?Reminder: I will be on vacation next week.
We would have to put the access connector
in tonight if I'm pumping down Friday, tomorrow.
  
  7937   Thu Jan 24 11:31:45 2013 SteveUpdateSUSETMX damping restoredETMX sus damping restored.  It is
still noisy
  
  7939   Thu Jan 24 14:40:09 2013 SteveUpdateVACRGA backgroung RGA background with VM2 open to Maglev
at day 37
 
 Screenshot.png 
  7942   Thu Jan 24 16:31:46 2013 SteveUpdatePEMbuilding exterier wall paintedThe wood exteier walls, gutters and doors
were painted at CES-Annex building #69
 IMG_1880.JPG 
  7944   Fri Jan 25 08:10:42 2013 SteveUpdateGeneralLaseroptik mirrors Here are the German plots. Unfortunately
they are not logarithmic. 
 Ed: Proprietary data removed.
  
  7999   Tue Feb 5 09:08:11 2013 SteveUpdatePEM exterier doors to be painted

    

       
            
 IMG_0055.JPG 
  8001   Tue Feb 5 10:18:54 2013 SteveUpdatePEMhigh particle count ALART

    

       
            
 badair.png100d_airq.png 
  8004   Tue Feb 5 15:31:03 2013 SteveUpdateGeneralclean assembly room benches cleaned upManasa, Jamie and Steve,
Tip-Tilts and parts moved into the
most north " 40m "  cabinet 
 IMG_0057.JPGIMG_0061.JPG 
  8009   Wed Feb 6 15:05:18 2013 SteveUpdateSAFETYcameras must be anchordCameras
must be immediately anchord to avoid a possible
 IMG_0070_1.JPGIMG_0069_1.JPG 
  8010   Wed Feb 6 15:10:22 2013 SteveUpdatePEMnew safety signs on exterier doors

    

       
            
 IMG_0068.JPG 
  8013   Wed Feb 6 15:39:19 2013 SteveUpdateElectronicsDC power supplies in cabinets East arm cabinet E9 and E10
 
 IMG_0066_1.JPG 