40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 148 of 339  Not logged in ELOG logo
ID Date Author Type Category Subject Text Attachments
  9618   Mon Feb 10 18:03:41 2014 jamieUpdateCDS12 core c1sus replacementI have configured one of the spare Supermicro
X8DTU-F chassis as a dual-CPU, 12-core CDS
front end machine.  This is meant to
  
  9617   Mon Feb 10 16:20:28 2014 JenneUpdateGeneralPRM QPD recenteredIn an effort to stop the PRC from wiggling
around so much, I recentered the POP QPD
after maximizing the POPDC power when locked
  
  9616   Mon Feb 10 16:02:12 2014 JenneUpdateGeneralPRM oplev clipped in vacuumThe PRC (locked on carrier so far today),
is pretty wobbly.  It'll stay locked
on carrier, but it's wobbling.  The
 Screenshot-Untitled_Window-1.png 
  9615   Mon Feb 10 09:45:53 2014 SteveUpdateVACvacuum normal is reached 


 pd77m5d.png13daysAtm.png 
  9614   Sat Feb 8 15:14:18 2014 ericqUpdateLSCPRM Sideband Splitting[ericq]
Today, I kicked the PRM to see the
sideband splitting in POP110. 
 PRCpeaks.pdf 
  9613   Fri Feb 7 17:52:41 2014 KojiSummaryGeneralSome cleaning up
    Adjusted the PMC alignment

   Adjusted the IMC length offsets for
the MC servo and the FSS servo
   
  
  9612   Fri Feb 7 13:30:25 2014 ericqUpdateGeneralIn-Vac Alignment

    

       
            
  
  9611   Fri Feb 7 13:30:22 2014 GabrieleUpdateGeneralIn-Vac Alignment

    

       
            
  
  9610   Fri Feb 7 13:00:52 2014 JenneUpdateGeneralIn-Vac Alignment

    

       
            
  
  9609   Fri Feb 7 12:43:12 2014 ericqUpdateGeneralIn-Vac Alignment[ericq]
  
  9608   Thu Feb 6 16:41:31 2014 ericqUpdateGeneralIn-Vac Alignment[Manasa, ericq]
Both arms
  
  9607   Thu Feb 6 11:14:07 2014 SteveUpdateVACpumpdown completed Pumpdown completed. IR shutter opened
at P1 1 mTorr  The block is still in
the beam path.
 pd77.png 
  9606   Wed Feb 5 20:41:57 2014 DenUpdateLSCcalibrated spetra from OAF testWe did online adaptive filtering test with
IMC and arms 1 year ago (log
7771). In the 40m presentations I can
 oaf_cal.pdf 
  9605   Wed Feb 5 19:53:51 2014 SteveUpdateVACpumpdown stops for the day at 14 Torr 
 
 stopHere.png 
  9604   Wed Feb 5 19:36:50 2014 SteveUpdateVACpumpdown at 25 Torr

    

       
            
 pd77at3.5h.png 
  9603   Wed Feb 5 18:36:56 2014 ranaFrogselogMicroSoft BingBot is attacking us The ELOG was frozen, with this in
the .log file:   
GET /40m/?id=1279&select=1&rsort=Type
  
  9602   Wed Feb 5 15:39:41 2014 manasaUpdateGeneralWe are pumping down[Steve, Manasa]
I checked the alignment one last
time. The arms locked, PRM aligned, oplevs
 pre_pump_down.png 
  9601   Wed Feb 5 15:26:57 2014 manasaUpdateGeneralReady for pump down??

    

       
            
  
  9600   Wed Feb 5 09:28:32 2014 SteveUpdateSUSETMY damping restoredETMY damping restored.   
  9599   Wed Feb 5 08:14:59 2014 SteveUpdateVAC vacuum computers are back without safety

    

       
            
  
  9598   Tue Feb 4 23:01:24 2014 JenneUpdateGeneralReady for pump down?? 
 This sounds great! The only
suggestion that I have is for checking POP.
  
  9597   Tue Feb 4 17:40:19 2014 manasaUpdateGeneralReady for pump down??

    

       
            
  
  9596   Tue Feb 4 16:43:50 2014 manasaUpdateGeneralIFO alignment update[EricQ, Manasa]
We are close to the end of the vent
except for a couple of issues.
  
  9595   Tue Feb 4 01:02:03 2014 KojiUpdateGreen LockingETMX green powerManasa, Steve: Please revisit the Xend
oven temperature again.
 Screenshot-Untitled_Window.png 
  9594   Tue Feb 4 00:42:18 2014 KojiUpdateGeneralX arm aligned for IR/GRThe
X arm was also aligned for the IR by hand
and ASS. Also the X end green PZT was aligned
  
  9593   Mon Feb 3 23:31:33 2014 ManasaUpdateGeneralAlignment update / Y arm locked[EricQ, Manasa, Koji]
We measured the spot positions on
the MC mirrors and redid the MC alignment
  
  9592   Mon Feb 3 15:57:52 2014 SteveUpdateGreen LockingETMX green powerThere was 0.2 mW green at the X end.
The doubling oven temp was changed
from 37.5 to 36 degrees C
 ETMXgreen.jpgXgreenOven36C.jpg 
  9591   Mon Feb 3 10:17:14 2014 SteveUpdatePEMdusty surfacesPlease wet WIPE  AP-ISCT.jpgBSC-rim.jpgITMX-ISCT.jpg12daysAtm.png 
  9590   Fri Jan 31 19:29:36 2014 GabrieleSummaryLSCPRC and SRC lengths Today we measured the missing distance
to reconstruct SRC length.
I also changed the way the mirror
 map_jan31st.pdfsurvey_v3.zip 
  9589   Fri Jan 31 18:41:25 2014 manasaUpdateGeneralIFO alignment update[EricQ, Gabriele, Manasa]
We found we had lost the Y arm pointing
from yesterday. We tried to recover the pointing
  
  9588   Thu Jan 30 19:00:25 2014 GabrieleSummaryLSCPRC length changed [Manasa,
EricQ, Gabriele]
Today
 map_jan30.pdfsurvey_v3_jan30.m 
  9587   Thu Jan 30 11:59:03 2014 manasaUpdateCDSfb timing was off

    

       
            
  
  9586   Wed Jan 29 21:01:03 2014 GabrieleSummaryLSCPRC length measurement analysis [Manasa,
EricQ, Gabriele]
We
 map.pdfscript.zip 
  9585   Wed Jan 29 16:36:37 2014 KojiSummaryGeneralHigh power beam blasting of the aLIGO RFPD [Rich, Jay, Koji]
We blasted the aLIGO RF PD with a
1W IR beam. We did not find any obvious damage.
  
  9584   Tue Jan 28 23:32:12 2014 KojiUpdateGeneralX/Y arm locked with the IR beam[Koji EricQ]
The both arms have been locked
with IR and aligned by ASS.
 good_alignment.png 
  9583   Tue Jan 28 22:24:46 2014 ericq UpdateGeneralFurther Alignment[Masasa, ericq]
Having no luck doing things remotely,
we went into the ITMX chamber and roughly
  
  9582   Tue Jan 28 16:26:40 2014 SteveUpdateVAC vacuum computers are back without safety

    

       
            
 c1vac1_vac2areback.png 
  9581   Tue Jan 28 11:13:50 2014 KojiUpdateVAC vacuum monitor is still blank[Steve Koji]
We
pushed the reset button of c1vac1 and c1vac2
  
  9580   Tue Jan 28 09:51:47 2014 SteveUpdateIOOlow power pointing 
PSL output is stable. 
 IOO4dlowpr.png 
  9579   Mon Jan 27 21:36:35 2014 ericq UpdateGeneralVent so farAfter turning the slow FSS threshold down,
the mode cleaner stays locked enough to do
other things. We were able to align the tip
  
  9578   Mon Jan 27 17:49:46 2014 ranaHowToComputer Scripts / Programssendmail started on nodus: fixing SwiftMail on DokuwikiSince the recent filesystem fracas, the
new accounts could not be created on nodus
/ dokuwiki (for the controls workshop, for
  
  9577   Mon Jan 27 12:26:00 2014 KojiUpdateIOOIOO Slow Actuator Servo threshold changedIn order to activate the slow actuator
servo for the MC locking, 
the threshold level for this servo
  
  9576   Mon Jan 27 09:08:00 2014 SteveUpdateVAC4 days at atmosphere 
 
 day4atm.pngvent76bgTp3d4.png 
  9575   Sat Jan 25 21:09:16 2014 gabrieleHowToLSCProcedure to measure PRC lengthI know the drawing is wrong.
I put random distances, not realistic ones,
and I did not try to get something close
  
  9574   Fri Jan 24 13:10:12 2014 JamieHowToLSCProcedure to measure PRC length

    

       
            
 path.pdf 
  9573   Fri Jan 24 12:44:25 2014 GabrieleHowToLSCProcedure to measure PRC lengthHere is how to measure the PRC length with
a set of distance measurements in the optical
setup. 
 8x 
  9572   Thu Jan 23 23:10:19 2014 ericq UpdateGeneralVent so far[ericq, Manasa, Jenne]
Summary: We opened up the
BS and both ITM chambers today, and put the
  
  9571   Thu Jan 23 13:23:10 2014 SteveUpdateVAC40m IFO is at atmosphere

    

       
            
  
  9570   Thu Jan 23 08:04:04 2014 SteveUpdateVACvacuum control screen is blank 
There is 
 pd76m170d2dRgaOn.png 
  9568   Wed Jan 22 20:00:41 2014 JenneUpdateGeneralVENT GO!Steve, please begin
the vent!!
 IFOstatus_lowPower_preVent.png 
ELOG V3.1.3-