  10172   Thu Jul 10 01:02:13 2014 ranaUpdatePSLmore PMC scienceIncreased gain
and SNR in PMC LO monitor circuit.
 PMCloCal.pdf 
  10171   Thu Jul 10 00:38:20 2014 manasaUpdateGeneralAOM and PSL Ringdown

    

       
            
  
  10170   Wed Jul 9 23:02:33 2014 HarryUpdateGeneralBeam Waists via Beamscan Today, I borrowed the beam profiler
from Brian (another SURF) in order to double
check my razor blade measurement figures,
 beamscanSetup.pngbeamProfileX.pngbeamProfileY.pngbeamScanWaist.zipbeamScanWaists.png 
  10169   Wed Jul 9 21:43:41 2014 JenneUpdateElectronicsPMC servo card modifications in DCC[Rana, Jenne]
We have decided to keep better
  
  10168   Wed Jul 9 21:05:31 2014 manasaUpdateGeneralAOM and PSL Ringdown After the fits, here are the numbers!

    
        
 data_code.zipPSL_ringFit.pdfAOMringFit.pdf 
  10167   Wed Jul 9 19:53:34 2014 ranaUpdatePSLPMC LO monitor trend (5 years)   LODET.png 
  10166   Wed Jul 9 17:34:11 2014 NichinUpdateElectronicsPDFR: Beam pointing adjustments and DC measurements [Nichin, Manasa]
AIM: 
  
  10165   Wed Jul 9 17:08:29 2014 JenneUpdateCDSc1auxex "Unknown Host"c1auxex has forgotten who it is. 
Slow sliders for the QPD head were not responding,
so I did a soft reboot from telnet. The machine
  
  10164   Wed Jul 9 16:33:05 2014 manasaUpdatePSLPMC ringdown setup

    

       
            
  
  10163   Wed Jul 9 12:01:43 2014 AkhilConfigurationElectronicsSetup Plan for placing the Frequency Counter inside the labToday, me and Manasa went inside the lab
to figure out a place for the place for the
FC. The whole setup will be placed in a chassis
 setup.pngSetupFC.png 
  10162   Wed Jul 9 11:41:12 2014 KoushikUpdatePSLPMC local oscillator is going wonky

    

       
            
  
  10161   Wed Jul 9 08:50:30 2014 AkhilUpdateGeneralWeekly Update 
Last
Week's Work
  
  10160   Wed Jul 9 00:59:09 2014 ranaUpdatePSLPMC local oscillator is going wonky

    

       
            
 PMC_RFslider.pdf 
  10159   Wed Jul 9 00:47:22 2014 KojiUpdatePSLPMC local oscillator is going wonkyKoushik replaced an ERA-5 in the PC path.
We put the module back to the rack and found
no change.
  
  10158   Tue Jul 8 23:59:49 2014 HarryUpdateGeneralWeekly Plan (7.8.14) Last Week:
-I continued to struggle with the
razorblade beam analysis, though after a
  
  10157   Tue Jul 8 22:53:02 2014 Jenne, RanaUpdateElectronicsTransmon QPD / whiteningWe need to work farther on checking
out the end transmission QPD electronics
situation. 
  
  10156   Tue Jul 8 18:20:15 2014 jamieOmnistructureElectronicsJamie 1811 power supply fixed! Placed in PD cabinet in Y arm, next
to the OTHER Jamie-made 1811 power supply
from 1998.
  
  10155   Tue Jul 8 17:59:12 2014 jamieOmnistructureElectronicsJamie 1811 power supply fixed!I finally made good on the LIFE TIME WARRANTY
on the ancient, Jamie-made 1811 power supply
with the faulty switch:
 20140708_165010.jpg 
  10154   Tue Jul 8 16:45:15 2014 NichinUpdateGeneralWeekly plan My plan for next week is...
  
  10153   Tue Jul 8 15:28:32 2014 KojiUpdatePSLPMC local oscillator is going wonkyKoushik and Koji try to fix the PMC oscillator
issue. So we remove the module from the rack.
This means we don't have the PMC transmission
  
  10152   Tue Jul 8 15:07:24 2014 NichinHowToElectronicsRF Multiplexer in rack 1Y1The RF
multiplexer is configured as shown in the
figure. It is now effectively a 15x1 RF mux.
 RF_Multiplexers.png 
  10151   Tue Jul 8 09:02:02 2014 AkhilUpdateElectronicsPSD Plots for different sampling times of the Frequency Counter Although there were few timing issues
with the FC and the Raspberry Pi at the lowest
sampling time of the FC (0.1s) even after
 7x 
  10150   Tue Jul 8 01:55:21 2014 JenneUpdateSUSETMX glitching[Jenne, Rana]
A few times this evening, I had been
having trouble locking CARM and DARM with
  
  10149   Mon Jul 7 23:19:55 2014 ranaUpdatePSLPMC ringdown setup

    

       
            
  
  10148   Mon Jul 7 22:18:26 2014 KojiUpdatePSLPMC local oscillator is going wonkyIt seems that there is no better chip in
MiniCircuits line-up with the same form factor.
  
  10147   Mon Jul 7 22:07:29 2014 ranaUpdateElectronicsRF cables reroutedThis Red Ladder movement also probably
included some bumping of the MC2 stack (
 Untitled.pdf 
  10146   Mon Jul 7 21:36:33 2014 Jenne, ranaUpdatePSLPMC local oscillator is going wonkyThe PMC local oscillator is going
a little weird dying. 
We need to check out why the level
 PMC_LO_failing.pdf 
  10145   Mon Jul 7 18:38:27 2014 NichinUpdateElectronicsRF cables rerouted

    

       
            
 1.png2.png 
  10144   Mon Jul 7 18:11:04 2014 KojiUpdateGeneralBeam Waists-
Plots should be directly attached on the
elog. (Attaching codes in a zip
  
  10143   Mon Jul 7 17:20:09 2014 NichinUpdateElectronicsRF PDs needed

    

       
            
  
  10142   Mon Jul 7 16:52:02 2014 manasaUpdateElectronicsRF cables need to be reroutedThe RF cables have been routed incorrectly.
The cables run to the module from the front
of the rack. We cannot close the doors to
  
  10141   Mon Jul 7 16:39:26 2014 SteveUpdatePEMants on the PSL table

    

       
            
  
  10140   Mon Jul 7 16:39:09 2014 manasaUpdatePSLPMC ringdown setupI moved stuff on the PSL table to accommodate
the PMC ringdown setup.
I used the beam that leaks from the
 PMC_ring.png 
  10139   Mon Jul 7 14:42:33 2014 HarryUpdateGeneralBeam WaistsI was finally able to get a reasonable
measurement for the beam waist(s) of the
spare NPRO.
 16x 
  10138   Mon Jul 7 14:38:55 2014 SteveUpdatesafetysafety trainingTaraV
- geology major undergrad -  of Jenne's
  
  10137   Mon Jul 7 13:56:13 2014 AkhilConfigurationElectronicsSetup Used for Characterization of Frequency CounterWhen I was trying to plot PSD of the measurements,
I still couldn't get better resolution. There
still seems to be a problem with timing and
 FreqVsTime.pngMissing_Data.png 
  10136   Mon Jul 7 13:55:26 2014 JenneUpdateLSCc1cal model restartedI'm not sure why the c1cal model didn't
come up the last time c1lsc was rebooted,
but I did an "rtcds start c1cal"
  
  10135   Mon Jul 7 13:44:21 2014 JenneUpdateCDSc1sus - bad fb connection

    

       
            
  
  10134   Mon Jul 7 11:02:22 2014 manasaConfigurationGeneralIFO status post earthquake

    

       
            
  
  10133   Mon Jul 7 10:35:43 2014 JenneUpdateElectronicsRF PDs needed

    

       
            
  
  10132   Mon Jul 7 09:46:00 2014 SteveConfigurationSUSall sus damping restoredAll suspension damping restored. There
had to be an earth quake.
 6.9MagMexico.png 
  10131   Mon Jul 7 08:13:41 2014 steveUpdateGeneralyes,there was firework   8days.png 
  10130   Sat Jul 5 04:18:45 2014 AndresUpdate40m Xend Table upgradeAdding Two Lenses After the Second Steering Mirror in Order Two Increase the Gouy Phase Difference Between the Sterring MirrorsI had been working on the Xend table optical
layout update. Since the two steering mirrors
in the Xend green are too close to each,
 7x 
  10129   Fri Jul 4 09:17:13 2014 AkhilConfigurationElectronicsSetup Used for Characterization of Frequency Counter Goal:
To
 setup.pdf 
  10128   Thu Jul 3 16:28:38 2014 NichinUpdateElectronicsRF cables installed [ Nichin, Eric G]
RF cables have been installed between
deomodulator output PD RF MON and the RF
 AS55_03-07-2014_162634.pdf 
  10126   Wed Jul 2 22:58:11 2014 JenneUpdateLSCLittle Bo-Peep has found her phaseNever
mind.  This is just the
low pass filter that Den put in to try to
  
  10125   Wed Jul 2 21:30:42 2014 JenneUpdateLSCLittle Bo-Peep has lost her phaseLittle Bo-Peep has lost her phase,

 CARM_loop_ArmPowers1_2July2014.pdf 
  10124   Wed Jul 2 16:18:32 2014 JenneUpdateASCIFO aligned, PRMI + 2 arms achievedAfter the meeting, I aligned the IFO to
the IR, and then I aligned the Ygreen to
the Yarm.  I then found the beatnotes
  
  10123   Wed Jul 2 16:16:45 2014 NichinUpdateGeneralLAN wire added [Nichin, Eric Q]
We added a new LAN wire from Rack
1Y4 to 1Y1 to connect the RF switch at 1Y1
  
  10122   Wed Jul 2 15:35:34 2014 ericqUpdateComputer Scripts / ProgramsLocal Chiara backupsKoji has provided a 2TB USB3 external hard
drive that will get daily backups of chiara:/home/cds,
the idea being that if the internal HD at
  