40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 146 of 337  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  8628   Thu May 23 12:02:48 2013 SteveUpdateendtable upgradeETMY - oplev Temporary oplev in place. The spot
on the qpd is still big. My two lens solution
did not work.
 ETMYopl.jpg 
  8655   Thu May 30 11:10:00 2013 SteveUpdateendtable upgradeETMY - oplev

    

       
            
 ETMYoplev.jpg 
  8664   Mon Jun 3 09:46:40 2013 SteveUpdateVACRGA scan at day 100 Vacuum normal condition at pumdown
day 100
 
 d100Mpd75.pngd100Mpd75p.pngbadguys.png 
  8669   Tue Jun 4 10:44:13 2013 SteveUpdateendtable upgradePI pzt holders are readyThe PI pzt holders are back from the shop.
They are numbered 1, 2 & 3 and machined
to match.
 PIpztholders.jpg 
  8670   Tue Jun 4 10:47:57 2013 SteveUpdatesafetysafety trainingOur early bird surf student Gautem has
received 40m specific basic safety training
today.
  
  8681   Wed Jun 5 15:48:02 2013 SteveUpdateGeneralfast 2004 qpdThank you Ben Abbott forwarding this information:
 QPD Amplifier
 D990272qpd.jpginterfaceD990692.jpg 
  8682   Wed Jun 5 15:55:16 2013 SteveUpdateGeneralProjector - lightbulb ordered

    

       
            
  
  8685   Thu Jun 6 09:58:13 2013 SteveUpdateendtable upgradeenclosure to chamber connection 
 Thin
wall connector from McMCarr#55275K25
 thinwallconnector.jpg06061301.PDF 
  8717   Tue Jun 18 10:37:00 2013 SteveSummaryGeneralnew laser pointers  Red-green
laser pointers added to the depleted
stock of 2011
  
  8732   Thu Jun 20 09:33:42 2013 SteveUpdateGeneralcleanupOffice work benches were cleaned up yesterday.
Anti-image filter boards were moved to north
wall of the control room. Koji's pd- electronics
 tmc3x2.jpg 
  8736   Fri Jun 21 16:30:04 2013 SteveUpdateGeneralCapacitor InventoryThe 3 Panasonic Ceramic Kits Books, 1206
NPO, SMT are well stocked. The 4 th one needs
to be refilled at some values.
 CeramicCaps1206NPOsmt.jpgPolyesterFilmCapThroughHole250VDC.jpg 
  8743   Tue Jun 25 10:23:20 2013 SteveUpdatesafetysurf safety training Alex Cole and Craig Cahillane received
40m specific,  basic safety training
last week.
 surfs2014.jpg 
  8763   Thu Jun 27 10:45:41 2013 SteveUpdateGeneral40MARS wireless network problems

    

       
            
  
  8765   Thu Jun 27 15:58:27 2013 SteveUpdatePEMPSL enclosure particle counts 
 Particle counts were measured
inside the PSL enclosure at 40VAC variac
  
  8782   Fri Jun 28 11:33:32 2013 SteveUpdate 40MARS wireless network problem

    

       
            
  
  8785   Fri Jun 28 14:57:15 2013 SteveUpdateGeneralclosing lab doorsI found the south end emergency doors not
latched completely. There was a ~ 3/8"
vertical gap from top to bottom.
  
  8813   Tue Jul 9 17:03:06 2013 SteveUpdateGreen Lockingfiber layed for Y armAlex, Gautam and Steve,
Single
mode fiber 50m long is layed out into
 fromETMYtowardPSL.jpgfibreETMYtoPSL50m.jpgPSLfiberfromETMY.jpg 
  8822   Wed Jul 10 14:49:00 2013 SteveUpdateGreen Locking more fiber protective tubing layed

    

       
            
 fibreETMXprotectedendOnly.jpg 
  8827   Thu Jul 11 09:15:10 2013 SteveUpdateendtable upgradeETMY optable groundedETMY optical table top was grounded to
the ETMY chamber through 1 Mohms this morning.
I  also strain releifed
  
  8828   Thu Jul 11 09:24:03 2013 SteveUpdateGeneralthere should be nothing left on optable topsThere are 4 oscilloscopes left on the AP
optical table top.... It's only 25 lbs...
  
  8834   Fri Jul 12 09:00:10 2013 SteveUpdateGeneral Halogen illumination cables disconnectedAlex and Steve,
Old halogen chamber illuminator cabling
disconnected and potenciometer board removed
 1Y1oldilluminatersDisconnected.jpg 
  8847   Mon Jul 15 14:12:15 2013 SteveUpdateVACRGA scan at day 144 Pumpdown 75, vacuum normal condition
at day 144
 
 pd75mRGA144d.pngpd75m144d.png 
  8856   Tue Jul 16 13:48:26 2013 SteveUpdatePEMcranes cleanedKeven and Steve,
The 3 cranes tested and  wiped
off as preparation for upcoming vent.
  
  8904   Tue Jul 23 08:21:31 2013 SteveUpdateVACVent has started 
Thanks for the good preparation. 
IFO pressure P1=20 Torr 
 beforVent.pngstartVent.png 
  8907   Tue Jul 23 14:00:03 2013 SteveUpdateVACthe vent is completed The 40m IFO has reached  atmospher
in 5 hours. It is ready to open chamber condition.
The RGA is pumped with the maglev.
 Atm.png5cyl.pngventSum1d.png 
  8915   Wed Jul 24 10:35:41 2013 SteveUpdateVACBS, ITMY doors are removed

    

       
            
 beforeDoorsOff.pngparticlecount10d.png 
  8933   Mon Jul 29 16:04:40 2013 SteveUpdateVACAC removed Manasa, Eric, Evan, Koji and Steve,
Access connector removed in order
to complete alignment. Light aluminum with
 acout.pngAlAcACa.jpgAlAcACb.jpg 
  8945   Wed Jul 31 09:51:43 2013 SteveUpdatesafetySujan receives safety trainingSujan got 40m specific basic safety training
this morning.
 IMG_0031.JPG 
  8946   Wed Jul 31 10:27:00 2013 SteveUpdateVACinstrument grade air is discontinouedWe have been using Air Liquide Instrument
Grade Air for venting the 40m vacuum envelope.
It is no longer available.
  
  8953   Thu Aug 1 16:03:52 2013 SteveUpdateGeneralreopen BS & IOO

    

       
            
 IOOnorth.jpg 
  8963   Mon Aug 5 10:50:48 2013 SteveUpdateVACRGA background RGA background at day 12 of this
vent . The maglev is pumping on the rga through
VM2
 v75bgMd12.png 
  8970   Tue Aug 6 10:06:29 2013 SteveUpdateVACPumpdown is at 500Torr The pumpdown has started at 8:38am
Manasa was here to confirm good alignment
of the IFO
 befPd.png 
  8973   Tue Aug 6 16:45:31 2013 SteveUpdateVACPumpdown is completed IFO  P1=1mT PSL shutter is opened
 
 8hrPd76.png1mT.png 
  8976   Wed Aug 7 10:51:49 2013 SteveUpdateVACPumpdown at 26hrs Cold cathode gauge CC1 -h (horizontal)
just coming on 9.2e-5 Torr
P2 is the fore line pressure of the
 26hr.png14datm.png 
  8978   Wed Aug 7 15:36:29 2013 SteveUpdateVACTP2 drypump replaced 
 TP2's fore line - dry pump
replaced at performance level 600 mTorr after
 forelinesPs.jpg 
  8984   Thu Aug 8 07:57:23 2013 SteveUpdateVACpumpdown at 48 hrs

    

       
            
 48hrsPd76.png 
  8985   Thu Aug 8 10:31:28 2013 SteveUpdateVACfew reminders of this vent 1, Vacuum envelope grounds must be
connected all times!  After door removal
reconnect both cables immediately.
 GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg 
  9002   Tue Aug 13 07:40:53 2013 SteveUpdateCDSc1iscex needs help 
 Sorrensen ps ouput of +15V
at rack 1X9 was current limited to 10.3V
 c1iscexSick.png 
  9003   Tue Aug 13 11:04:44 2013 SteveUpdatePEMfluorecent lightsOur fluorecent
lights became obsolete.  We'll have
change fixtures over to some more energy
  
  9011   Wed Aug 14 08:24:20 2013 SteveUpdateVACpumpdown at day 8 
 
 pd76md8.png 
  9013   Thu Aug 15 09:34:12 2013 SteveUpdateGeneralWilcoxon cables rescuedEric and Steve,
 We removed Wilcoxon Accelerometer
PS and Amplifier unit under the BS optical
 rescuedGraycables.jpgwilconoxOut.jpgchanGains.jpg 
  9017   Fri Aug 16 09:35:18 2013 SteveUpdateVACVacuum Normal state recognition is back

    

       
            
 VacuumNormal.pngvacValvesDisabled.jpg 
  9024   Mon Aug 19 07:53:48 2013 SteveUpdateSUSETMX damping restoredETMX sus damping restored   
  9026   Mon Aug 19 09:54:13 2013 SteveUpdatesafetyMasayuki receives safety trainingMasayuki Nakano, a student of Seiji's from
ICRR / U Tokyo, is visiting us here at the
40m lab for the next couple months.
  
  9027   Mon Aug 19 10:03:17 2013 SteveHowToGeneralhow not to leave a cableWe can not leave cables connected like
this. This is a burned toast award.
 NONOcable.jpg 
  9029   Mon Aug 19 11:12:54 2013 SteveUpdateVACRGA scan at day 13 
 
 rgaScan13d.png 
  9034   Mon Aug 19 17:40:32 2013 SteveUpdateGreen LockingXend green layout corrections Shutter moved, no more clipping.
Pick-off mirror 2" replaced
by 1" one. Laseroptik HR 532nm, incident
 beforeC.jpgnowC.jpgstillMultiple.jpg 
  9039   Tue Aug 20 10:59:15 2013 SteveUpdateGreen LockingXend green layout corrections

    

       
            
 faraway.jpgcloser.jpg 
  9083   Wed Aug 28 11:15:02 2013 SteveUpdateGreen LockingXend green layout corrections

    

       
            
  
  9084   Wed Aug 28 11:23:41 2013 SteveUpdateVACcrane repair sheduled

    

       
            
  
ELOG V3.1.3-