8518
|
Wed May 1 10:42:35 2013 |
Steve | Update | LSC | cleanup |
Optics from the car were placed into glass door cabinet E0 |
8526
|
Fri May 3 08:55:55 2013 |
Steve | Update | PEM | 3.2 M earthquake |
|
8527
|
Fri May 3 09:17:41 2013 |
Steve | Update | SUS | ETMX needs some help |
|
8571
|
Tue May 14 14:24:56 2013 |
Steve | Update | 40m Upgrading | enclosure removal |
I'm planning to remove the ETMY optical table enclosure and move it over to CES Shop 8am Thursday morning.
We'll install spring loaded lathes, hooks and quick release pins.
The bridge will be reinforced with steel plate to support release pins on posts.
There will be an other cut out for cable feedtrough as it is shown on elog #8472
Let me know if this timing does not fit your work. |
8578
|
Wed May 15 08:29:28 2013 |
Steve | Configuration | RF System | fiber protection at splitter box area |
I positioned the fiber loaded protecting tubing and anchored them so they can do their job.
However, the area needs a good clean up.
|
8579
|
Wed May 15 15:33:49 2013 |
Steve | Update | General | On-Track QPD |
I tested On-Track (from LLO) OT 301 amp with PSM2-10 qpd. It was responding. Jenne will calibrate it. The 12V DC ps input is unipolar.
The one AC to DC adapter that Jenne tried was broken. |
8590
|
Thu May 16 08:32:05 2013 |
Steve | Update | 40m upgrading | ETMY op table disabled |
All ETMY optical table electronics- lasers-pds turned off, disconnected in order to remove enclosure.

|
8595
|
Fri May 17 15:38:51 2013 |
Steve | Update | 40m upgrading | ETMY enclosure is on the way back |
It will arrive around 10 am Monday morning. 
|
8606
|
Tue May 21 17:03:45 2013 |
Steve | Update | endtable upgrade | enclosure tops are sealed |
Quote: |
I'm planning to remove the ETMY optical table enclosure and move it over to CES Shop 8am Thursday morning.
We'll install spring loaded lathes, hooks and quick release pins.
The bridge will be reinforced with steel plate to support release pins on posts.
There will be an other cut out for cable feedtrough as it is shown on elog #8472
Let me know if this timing does not fit your work.
|
The bridge support posts were shimmed today. Surgical tubing 402R - o - rings were glued togeather with " instant krazy glue "
Atm2 Carey CH-3540 latches are compressed ~2.5 mm in the clamped position.
Atm3 is showing the captured quick release pin in the steel reinforced bridge that is supported by the post. It works great. The post screw is sealed by o-ring. The quick-pin is sealed by an epoxy attached copper cap.
Atm4 Enclosure is on it's back. Bottom o-ring can be seen. The hole reinforced bridge structure is visible.
Now I'm working on the window connection to the chamber. I'm very close leak checking this box.
In case of leaking around the top tubing seals we have two options:
a, cut down on the cover rim by 0.040" or b, increase tubing diameter |
8628
|
Thu May 23 12:02:48 2013 |
Steve | Update | endtable upgrade | ETMY - oplev |
Temporary oplev in place. The spot on the qpd is still big. My two lens solution did not work.
I will finalize optical component position of the oplev after the the arm transmitted and green beam optics in place. They have priority.
|
8655
|
Thu May 30 11:10:00 2013 |
Steve | Update | endtable upgrade | ETMY - oplev |
Quote: |
Temporary oplev in place. The spot on the qpd is still big. My two lens solution did not work.
I will finalize optical component position of the oplev after the the arm transmitted and green beam optics in place. They have priority.
|
Oplev spot size on qpd ~ 1 mm
PS: I realized it later that the returning beam is going through a lens for TRY. This is a nono.
This beam path will be relayed again as the TRY, green beam and IP-ang get there place. |
8664
|
Mon Jun 3 09:46:40 2013 |
Steve | Update | VAC | RGA scan at day 100 |
Vacuum normal condition at pumdown day 100
|
8669
|
Tue Jun 4 10:44:13 2013 |
Steve | Update | endtable upgrade | PI pzt holders are ready |
The PI pzt holders are back from the shop. They are numbered 1, 2 & 3 and machined to match.
Tapered black delrin opener is to gauge the gap if it is too small to fit pzt. This is to prevent holder to be opened too much. |
8670
|
Tue Jun 4 10:47:57 2013 |
Steve | Update | safety | safety training |
Our early bird surf student Gautem has received 40m specific basic safety training today. |
8681
|
Wed Jun 5 15:48:02 2013 |
Steve | Update | General | fast 2004 qpd |
Thank you Ben Abbott forwarding this information:
QPD Amplifier D990272 https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?.submit=Number&docid=D990272&version= at the X-end. It plugs into a Generic QPD Interface, D990692, https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?.submit=Number&docid=D990692&version= according to my drawings, that should be in 1x4-2-2A. |
8682
|
Wed Jun 5 15:55:16 2013 |
Steve | Update | General | Projector - lightbulb ordered |
Quote: |
Update: We don't have our BIG screen 
There was no light from the projector when I came in this morning. I suspected it might have to do with the lifetime of the bulb. But turning the projector OFF and ON got the projector working....but only for about 10-15 seconds. The display would go OFF after that. I will wait for some additional help to dismount it and check what the problem really is.
|
-
Shipping Estimate Friday June 7, 2013 - Monday June 10, 2013
Delivery Estimate: Wednesday June 12, 2013 - Monday June 17, 2013 by 8:00pm
-
Sold by: Lampedia
|
8685
|
Thu Jun 6 09:58:13 2013 |
Steve | Update | endtable upgrade | enclosure to chamber connection |
Thin wall connector from McMCarr#55275K25 was tested in 150 mW, 1 mm beam size of 1064 nm overnight. It did not show any degradation.
Super-Compressible Duct for Air
Hose is made from 0.005" thick, double-ply metalized polyester with a fabric-enclosed steel wire support.
Atm2, Enclosure viewport adaptor is shown in place of the viewport.
Soft gaskit - durumeter hardness 10A - McMCarr#9010K51 was added on the 10" od sufaces of conflat and viewport adaptor to insure being air tight.
The duct connector clamped with soft braided elastic " Velstrech" brand loop.
|
8717
|
Tue Jun 18 10:37:00 2013 |
Steve | Summary | General | new laser pointers |
Red-green laser pointers added to the depleted stock of 2011
The two pointers output measured 4.4 mW green and 2 mW red
|
8732
|
Thu Jun 20 09:33:42 2013 |
Steve | Update | General | cleanup |
Office work benches were cleaned up yesterday. Anti-image filter boards were moved to north wall of the control room. Koji's pd- electronics box placed next to water dispenser.
The removed ETMY optical table: TMC 4' x 2' x 4" with Aluminum enclosure was placed on table in the east arm. |
8736
|
Fri Jun 21 16:30:04 2013 |
Steve | Update | General | Capacitor Inventory |
The 3 Panasonic Ceramic Kits Books, 1206 NPO, SMT are well stocked. The 4 th one needs to be refilled at some values.
I labeled them on the cover for fast access. See Atm1
The Metalized Polyester Film Book with through holes mount are in good shape also. Atm2
The AVX Ceramic 1206, Garrett cab, range: 1pF - 22 microF 50V...... 67 values
Note here: that the value of dielectric, capacitance / voltage will vary
NPO: 1 pF - 1 nF / 50V .......37 values
X7R : 1 nF - 0.082 microF / 50V, 0.1 microF / 100V.......27 values
Y5V: 4.7 microF / 6.3 V, 10 microF / 10V, 22 microF / 6.3V.........3 values
|
8743
|
Tue Jun 25 10:23:20 2013 |
Steve | Update | safety | surf safety training |
Alex Cole and Craig Cahillane received 40m specific, basic safety training last week.
|
8763
|
Thu Jun 27 10:45:41 2013 |
Steve | Update | General | 40MARS wireless network problems |
Quote: |
Quote: |
I'm not sure what's going on today but we're seeing ~80% packet loss on the 40MARS wireless network. This is obviously causing big problems for all of our wirelessly connected machines. The wired network seems to be fine.
I've tried power cycling the wireless router but it didn't seem to help. Not sure what's going on, or how it got this way. Investigating...
|
I'm still seeing some problems with this - some laptops are losing and not recovering any connection. What's to be done next? New router?
|
We had the same problem yesterday. However the Vacuum Dedicated laptop worked with fewer disconnects. Christian is coming over this after noon to look at this issue.
This happened a few weeks ago and it recovered misteriously. Jamie did not understand it. |
8765
|
Thu Jun 27 15:58:27 2013 |
Steve | Update | PEM | PSL enclosure particle counts |
Particle counts were measured inside the PSL enclosure at 40VAC variac setting.
Directly under HEPAs, on the east half of the optical table : 0.3 micron 20 particles / cu ft, 0.5 micron 0 p / cu ft, 0.7 micron 0 p / cu /ft
Away from the HEPAs, on the west edge of the op table: 0.3 micron 960 particles / cu ft, 0.5 micron 50 p / cu ft, 0.7 micron 20 p / cu ft
We may want to increase the RPM a little bit.
Checked our counters against recently calibrated Met One GT-526:
#1 is right on, #2 measured 25% less (it will go for calibration)
Flow bench at the south end : zero particle for all 3 sizes
IOO chamber particle logging measures 0.5 and 1 micron. Chamber opening limit is set to 10,000 particles max of 0.5 micron
At 10,000 p of 0.5 micron means ~100,000 - 180,000 p of 0.3 micron
We may have to lower the limit. |
8782
|
Fri Jun 28 11:33:32 2013 |
Steve | Update | | 40MARS wireless network problem |
Quote: |
I'm not sure what's going on today but we're seeing ~80% packet loss on the 40MARS wireless network. This is obviously causing big problems for all of our wirelessly connected machines. The wired network seems to be fine.
I've tried power cycling the wireless router but it didn't seem to help. Not sure what's going on, or how it got this way. Investigating...
|
Mike and Christian brought over a Mac laptop for surf Alex.
They power cycled the wireless router of 40Marsh and labtops are working. Seeing 75-80% signals on all 3 Dell lab top sisters at both end of the lab |
8785
|
Fri Jun 28 14:57:15 2013 |
Steve | Update | General | closing lab doors |
I found the south end emergency doors not latched completely. There was a ~ 3/8" vertical gap from top to bottom.
Please pull or push doors harder if they not catch fully. |
8813
|
Tue Jul 9 17:03:06 2013 |
Steve | Update | Green Locking | fiber layed for Y arm |
Alex, Gautam and Steve,
Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.
It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- pvc, slit corrugated loom tubing " 1.5" ID
The fiber is not protected between 1Y1 and 1Y4 |
8822
|
Wed Jul 10 14:49:00 2013 |
Steve | Update | Green Locking | more fiber protective tubing layed |
Quote: |
Craig, Gautam and Steve,
Single mode fiber 50m long is layed out into cable tray that is attached to the beam tube of the Y arm.
It goes from ETMY to PSL enclosure. It is protected at both ends with " clear- nylon slit corrugated loom tubing " 1.5" ID
The fiber is not protected between 1Y1 and 1Y4
|
Installed 0.5" ID 10 ft long protective tubing at the PSL end of the ETMY fiber this morning. Here I had to cable tie a bunch of cables at the east side of the PSL enclosure.
They were hanging off the table blocking space were the sliding doors move.
At the ETMX end of the X-arm fiber received the same protective tubing. |
8827
|
Thu Jul 11 09:15:10 2013 |
Steve | Update | endtable upgrade | ETMY optable grounded |
ETMY optical table top was grounded to the ETMY chamber through 1 Mohms this morning. I also strain releifed relieved a few cables that were pulling on components directly. |
8828
|
Thu Jul 11 09:24:03 2013 |
Steve | Update | General | there should be nothing left on optable tops |
There are 4 oscilloscopes left on the AP optical table top.... It's only 25 lbs... Do not leave anything on the optical table tops! |
8834
|
Fri Jul 12 09:00:10 2013 |
Steve | Update | General | Halogen illumination cables disconnected |
Alex and Steve,
Old halogen chamber illuminator cabling disconnected and potenciometer board removed at 1Y1 in order to give room for pd calibration fibre set up. |
8847
|
Mon Jul 15 14:12:15 2013 |
Steve | Update | VAC | RGA scan at day 144 |
Pumpdown 75, vacuum normal condition at day 144
|
8856
|
Tue Jul 16 13:48:26 2013 |
Steve | Update | PEM | cranes cleaned |
Keven and Steve,
The 3 cranes tested and wiped off as preparation for upcoming vent. |
8904
|
Tue Jul 23 08:21:31 2013 |
Steve | Update | VAC | Vent has started |
Thanks for the good preparation. IFO pressure P1=20 Torr |
8907
|
Tue Jul 23 14:00:03 2013 |
Steve | Update | VAC | the vent is completed |
The 40m IFO has reached atmospher in 5 hours. It is ready to open chamber condition. The RGA is pumped with the maglev.
P1 pirani gauge is contact dependent as you see it on the linear plot It will be replaced during this vent.
The venting speed was 2-4 Torr / min
Atm2 shows how the BS is sensing the venting air cylinder changes.
The 4th cylinder of instrument grade air bump is overlapping with our janitor working at the BS chamber.
|
8915
|
Wed Jul 24 10:35:41 2013 |
Steve | Update | VAC | BS, ITMY doors are removed |
Quote: |
We will open the BS and ITMY doors first thing tomorrow morning. I plan to try to be in around 9 am. The first order of business will be to flip the folding mirrors that are not currently flipped (SR2, SR3, PR3).
|
Jenne, Annalisa & Steve |
8933
|
Mon Jul 29 16:04:40 2013 |
Steve | Update | VAC | AC removed |
Manasa, Eric, Evan, Koji and Steve,
Access connector removed in order to complete alignment. Light aluminum with acetate windows AC installed.
|
8945
|
Wed Jul 31 09:51:43 2013 |
Steve | Update | safety | Sujan receives safety training |
Sujan got 40m specific basic safety training this morning. |
8946
|
Wed Jul 31 10:27:00 2013 |
Steve | Update | VAC | instrument grade air is discontinoued |
We have been using Air Liquide Instrument Grade Air for venting the 40m vacuum envelope. It is no longer available.
The replacement is Alphagas 1, total hydrocarbon <0.1% ppm
LINK TO Alphagaz

Air Liquide > ALPHAGAZ™ Specifications

ALPHAGAZ™ Specifications
ALPHAGAZ™ range of Pure Gases for Analysis: two purity levels tailored to cover all your analytical needs.
Because each analytical application is sensitive to critical impurities that can affect your results, tests in our research center and analyzer manufacturers' studies confirm that the main impurities are moisture, oxygen and hydrocarbons.
Based on these critical impurities, Air Liquide has developed ALPHAGAZ™ brand with a Maximum Impurity Level (H2O, O2, CnHm).
- The Maximum Impurity Level is the same across the whole product range. This constitutes a guarantee of quality with regard to major critical impurities and contamination tracers. ALPHAGAZ™ 2 offers an even greater guarantee in terms of purity (CO, CO2, H2).
- The Minimum Total Purity is a prerequisite for product quality, but we do not stop there: Air Liquide selects and controls its gas sources by defining specifications regarding impurities that are critical for your analysis or application.
ALPHAGAZ™ 1 |
ALPHAGAZ™ 1 |
ALPHAGAZ™ 2 |
ALPHAGAZ™ 2 |
ALPHAGAZ™ AUTO IV |
ALPHAGAZ™ CO2 SFC |
He, N2, H2,
Ar, O2 |
Air |
He, N2, H2,
Ar, O2 |
Air |
Air*, N2, O2 |
CO2 |
Specifications (ppm vol): |
H2O < 3 ppm
O2 < 2 ppm
CnHm < 0.5 ppm |
H2O< 3 ppm
CnHm< 0.1 ppm
CO2 < 1 ppm
CO < 1 ppm |
H2O < 0.5 ppm
O2 < 0.1 ppm
CO2 < 0.1 ppm
CO < 0.1 ppm
CnHm < 0.1 ppm
H2 < 0.1 ppm |
H2O < 0,5 ppm
CnHm < 50 ppb
CO2 < 0,1 ppm
CO < 0,1 ppm
NOx < 10 ppb *
SO2 < 10 ppb* |
CnHm < 0.2 ppm
CO2 < 0.5 ppm
CO < 0.5 ppm
NO/NOx < 0.1 ppm |
H2O < 5 ppm
O2 < 2 ppm
CnHm < 2 ppm
NVOC* < 2 ppm
CO < 5 ppm
NO + NO2 < 2 ppm
S Total < 1 ppm
H2 < 0.5 ppm |
|
20 ± 1 % O2 (Europe)
21 ± 1% O2 (North America) |
|
20,9 ± 1 % O2
*: Detection limit |
*20 ± 1 % O2 |
*NVOC: Non Volatile Organic Compounds |
Minimum Total Purity |
|
8953
|
Thu Aug 1 16:03:52 2013 |
Steve | Update | General | reopen BS & IOO |
Quote: |
[Koji, Manasa]
We missed to check that we had the green transmitted to the PSL after flipping the SRC and PRC folding mirrors.
There is no green transmission reaching the PSL even after locking the arms to green.
We should fix this tomorrow. The BS heavy door should come off.
Steve! Do not start pump down tomorrow !
|
We closed the chambers last night with heavy doors and reopened it today. |
8963
|
Mon Aug 5 10:50:48 2013 |
Steve | Update | VAC | RGA background |
RGA background at day 12 of this vent . The maglev is pumping on the rga through VM2
|
8970
|
Tue Aug 6 10:06:29 2013 |
Steve | Update | VAC | Pumpdown is at 500Torr |
The pumpdown has started at 8:38am
Manasa was here to confirm good alignment of the IFO
Inner jam nuts of AC bellow were torqued to 45 ft/lbs and door nuts were check on opened chambers.
Annulos were roughed down to 500 mTorr
Oplev servos turned off, PSL and green shutters closed before pumpdown started
|
8973
|
Tue Aug 6 16:45:31 2013 |
Steve | Update | VAC | Pumpdown is completed |
IFO P1=1mT PSL shutter is opened
|
8976
|
Wed Aug 7 10:51:49 2013 |
Steve | Update | VAC | Pumpdown at 26hrs |
Cold cathode gauge CC1 -h (horizontal) just coming on 9.2e-5 Torr
P2 is the fore line pressure of the maglev. One can see the 4 Torr load during switching over to turbo pumping.
CC4 5e-9 Torr is the performance of the maglev pumping on the RGA only.
The annuloses are not pumped now. They are closed off to see how much outgassing plus leak they have.
Configuration: vacuum normal, annuloses not pumped
Condition: normal
Precondition: 14 days at atm, IOO chamber north door was taken off as a new entrance, the ETMX chamber was not opened.
What is new in the vacuum system: new P1 pirani gauge, gold plated clean allen wrench and ..........what else was dropped?
Note: the wireless laptop did not fail once all day yesterday. I want to give credit to the person who is responsible for this.
|
8978
|
Wed Aug 7 15:36:29 2013 |
Steve | Update | VAC | TP2 drypump replaced |
TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.
Where are the foreline pressure gauges? These values are not on the vac.medm screen.
The new tip seal dry pump lowered the small turbo foreline pressure 10x
TP2fl after 2 day of pumping 65mTorr |
8984
|
Thu Aug 8 07:57:23 2013 |
Steve | Update | VAC | pumpdown at 48 hrs |
Quote: |
TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.
|
|
8985
|
Thu Aug 8 10:31:28 2013 |
Steve | Update | VAC | few reminders of this vent |
1, Vacuum envelope grounds must be connected all times! After door removal reconnect both cables immediately.
2, The crane folding had a new issue of getting cut as picture shows.
3, Too much oplev light is scattered. This picture was taken just before we put on the heavy door.
4, We were unprepared to hold the smaller side chamber door 29" od of the IOC
5, Silicon bronze 1/2-13 nuts for chamber doors will be replaced. They are not smooth turning.
|
9002
|
Tue Aug 13 07:40:53 2013 |
Steve | Update | CDS | c1iscex needs help |
Sorrensen ps ouput of +15V at rack 1X9 was current limited to 10.3V @ 2A
Increased threshold to 2.1A and the voltage is up to 14.7V |
9003
|
Tue Aug 13 11:04:44 2013 |
Steve | Update | PEM | fluorecent lights |
Our fluorecent lights became obsolete. We'll have change fixtures over to some more energy efficient one. Do you have any recommendation regarding to less noise performer unit?
We may go this direction of LED fluorecent lamps ? |
9011
|
Wed Aug 14 08:24:20 2013 |
Steve | Update | VAC | pumpdown at day 8 |
|
9013
|
Thu Aug 15 09:34:12 2013 |
Steve | Update | General | Wilcoxon cables rescued |
Eric and Steve,
We removed Wilcoxon Accelerometer PS and Amplifier unit under the BS optical tabel yesterday. The six cabels going to DAQ were labeled and left in place. Gain setting were 100, except channel 3 was 10.
The ~ 40 m long 2 sets of 3 cables were very happy to get their kinks out. Especially the set going just south of ITMX optical table.