  8004   Tue Feb 5 15:31:03 2013 SteveUpdateGeneralclean assembly room benches cleaned up

Manasa, Jamie and Steve,

Tip-Tilts and parts moved into the most north " 40m "  cabinet  in the assembly room.

Green-black glass and related components were moved to the 40m E0 cabinet in plastic boxes.

The north flow bench has a few items that belong to us: HE/Ne laser, qpd on translation stages, an iris and one red mirror.  These were moved to the north edge of this bench.

However this leveled table is still full with other people's stuff

Attachment 1: IMG_0057.JPG
IMG_0057.JPG
Attachment 2: IMG_0061.JPG
IMG_0061.JPG
  8009   Wed Feb 6 15:05:18 2013 SteveUpdateSAFETYcameras must be anchord

Cameras must be immediately anchord to avoid a possible collusion with the view port !

Attachment 1: IMG_0070_1.JPG
IMG_0070_1.JPG
Attachment 2: IMG_0069_1.JPG
IMG_0069_1.JPG
  8010   Wed Feb 6 15:10:22 2013 SteveUpdatePEMnew safety signs on exterier doors

Quote:

Quote:

The wood exteier walls, gutters and doors were painted at CES-Annex building #69

 The east and south end of the 40m emergency exit doors are sealed- tapped off temporarily.  They will be painted on the out side only.  This job will be done by tomorrow noon

 Do not open chamber if you smell the paint !

 The east and south end of the 40m emergency exit doors received new safety signs.

Attachment 1: IMG_0068.JPG
IMG_0068.JPG
  8013   Wed Feb 6 15:39:19 2013 SteveUpdateElectronicsDC power supplies in cabinets

 East arm cabinet E9 and E10

 

Attachment 1: IMG_0066_1.JPG
IMG_0066_1.JPG
  8026   Thu Feb 7 17:24:13 2013 SteveUpdateSAFETYfire extinguishers checked

The fire department weighted and pressure checked our units today. Surprisingly they found one powder filled can. We can only use HALON  gas in the lab.

 

  8057   Mon Feb 11 16:16:27 2013 SteveUpdateVAC55 days at atmoshere

CP Stat 100  sheet-covers were replaced by clean ones on open chambers BS, ITMX, ITMY and ETMY this morning.

Try to fold the sheets such way that the clean side is facing each other, so they do not accumulate dust.

 

Attachment 1: atm55d.png
atm55d.png
  8075   Wed Feb 13 09:28:56 2013 SteveUpdateOpticsG&H - HR plots

 

 Gooch & Housego optics order specification from 03-13-2010

Side 1: HR Reflectivity >99.99 % at 1064 nm for 0-45 degrees for S & P polarization

Side 2: AR coat R <0.15

The HR coating scans uploaded to 40mwiki / Aux optics today

  8083   Thu Feb 14 08:29:41 2013 SteveUpdateIOOlow MC1 OSEM voltage

MC1 -  LR, LL, UL & UR  OSEMs should be adjusted to get  1.2V

Attachment 1: Feb14_2013.png
Feb14_2013.png
  8087   Fri Feb 15 09:58:49 2013 SteveUpdateGeneralbeam traps ready to be installed

Black-green glass traps are ready for light in vacuum. I can assemble more if needed. These three sizes are available.

Attachment 1: IMG_0083.JPG
IMG_0083.JPG
Attachment 2: IMG_0084.JPG
IMG_0084.JPG
  8107   Tue Feb 19 09:37:23 2013 SteveUpdateIOOlow MC1 OSEM voltage

 

    See TT DB25 pin swapping   elog#7869 

Attachment 1: MC1_MC3.png
MC1_MC3.png
Attachment 2: MC1_MC3_.png
MC1_MC3_.png
  8131   Thu Feb 21 18:01:27 2013 SteveUpdateVACpumpdown at 230 Torr

 

 We are pumping down with RP1 & RP3 oily roughing pumps at 3 Torr/min speed. The butterfly valve was just removed.

The PSL shutter is open to vacuum at ~100  mW 1064 nm. The inter lock should close it at ~5 mTorr.

Rana will shut down pumping tonight.

He will close V3 from screen, close RV1 valve with torque wheel, turn off roughing pumps and disconnect hose between RV1 and roughing pumps.

I will restart pumping early morning tomorrow.

 

  8135   Fri Feb 22 08:01:25 2013 SteveUpdateVACpumpdown continuous

 

 Pump down is restarted after 10.5 hrs stop overnight.

Attachment 1: 16hrs_pd75.png
16hrs_pd75.png
  8136   Fri Feb 22 11:12:16 2013 SteveUpdateVACpumpdown completed

 IFO   P1 pressure is 1 mTorr.  It is ready for high power light.

The Maglev took over the pumping at 500 mTorr

 

Attachment 1: mag60min.png
mag60min.png
Attachment 2: pd75at20h.png
pd75at20h.png
  8155   Mon Feb 25 08:22:03 2013 SteveUpdateVACpumpdown at day 4

 All normal, IFO pressure 1.5e-5 Torr

RGA is pumped by TP-3 in back ground mode.

 

Attachment 1: 4d.png
4d.png
Attachment 2: 66d@atm.png
66d@atm.png
  8167   Tue Feb 26 09:55:46 2013 SteveUpdateSAFETYEvan receives safety training

Evan got 40m specific safety training today.

  8184   Wed Feb 27 14:53:02 2013 SteveUpdateLSCwhat is the Fibox ?

Fibox FBAI-M 20bit units were connected with multimode fibre.  This pair of fiber is not protected in the cable tray.

  8205   Fri Mar 1 08:19:40 2013 SteveUpdateASSdrift

 Early morning drift in pitch. This plot is meaningless because there is no real  light on IP-Ang

The beam is clipping on the pick off mirror at ETMY chamber. The beam is half beam size too high. Yaw is perfect

 

Attachment 1: drift.png
drift.png
  8206   Fri Mar 1 14:50:36 2013 SteveUpdateVACpumpdown day 8

 Atm1, RGA background scan with TP3 pumping at day 7

Atm2,  IFO  CC1 = 1.1e-5 Torr at day 8

 Vacuum valve VM3 closed and VM2 opened, it switched the RGA to IFO scanning mode. CC4 = 3.5e-6 Torr

TP3 is pumping on the annuloses, their pressures are 1-3 mTorr

Vacuum condition reached the state of  Vacuum Normal. The MEDM screen "Current State" channel does not work because we disconnected some valves after the VME swap CAOS

Note: TP1 Maglev performance on Atm2  CC4 = 4e-9 Torr when VM2 valve was open

 

Attachment 1: bgTP3d7.png
bgTP3d7.png
Attachment 2: RGAonIFO.png
RGAonIFO.png
  8216   Mon Mar 4 09:51:26 2013 SteveUpdateASSIP-ANG is still not real

 IP-ANG  is coming out of ETMY without clipping. The beam is very high on the pick off mirror at the end table but it is still missing the qpd .

 

Attachment 1: IP-ANG.png
IP-ANG.png
  8219   Mon Mar 4 11:30:47 2013 SteveUpdatePEMair cond problem

 

 The air cond is out of order at the area covered by racks 1 X 1  through 1 X 7

The arm X and Y AC units are working.

Attachment 1: 40dAC.png
40dAC.png
  8231   Tue Mar 5 14:59:32 2013 SteveHowToVACdry-forepump replaced

TP3 turbo pump's dry-foreline pump was replaced.

How to do it:

The pump should be replaced when it's performance  <1.0 - 1.3 Torr

Set up valve configuration as shown at Atm1: close in this order VAEE, VASV, VABS, VASV, VASE, VA6 and V5,

Turn TP3 off at it's controller in the rack. Wait till is stops, so you can read 760 Torr at TP3 foreline gauge

Disconnect intake, exhaust vacuum seals and replace pump. Reconnect vacuum fitting and start it up.

Confirm operational details on the front of the controller: 50 K_RPM, 0.2A and <100 mTorr

Reset valves in reverse order

PS: the average life of the tip seal on the Varian SSH-110 dry-pump is about 1 year

      This pump " ser LP1007L556 " seal  made new record of 668 days: thanks to Bob Taylor who is replacing these seals

 

Attachment 1: changingforepump.png
changingforepump.png
Attachment 2: TP3wFp600.jpg
TP3wFp600.jpg
  8238   Wed Mar 6 08:40:03 2013 SteveUpdateVACfirst scan of this pumpdown

 Pumpdown 75 - Maglev - day 12

Precondition: 66 days at atm, installed TIP-TILTs with coils that  replaced PZT-Jena input steering

 

Attachment 1: pd75m12d.png
pd75m12d.png
Attachment 2: pd75mRGA12d.png
pd75mRGA12d.png
  8241   Wed Mar 6 16:14:27 2013 SteveUpdateSAFETYsafety training

Chloe Ling, Max Horton and Annalisa Allocca have received basic 40m specific safety training.

Attachment 1: IMG_500.jpg
IMG_500.jpg
  8270   Mon Mar 11 16:29:29 2013 SteveUpdatePEMproposed seismometer locations

Granite base 20" x 20" x 5"  locations are on the CES side of our IFO arms:  as shown ETMY_ south-west, ETMX_north-east, ITMX_south-east . No height limitation. This side of the tube has no traffic.

SS cover McMaster#  41815T4  (H) SS container cov

Attachment 1: ETMY_sw.jpg
ETMY_sw.jpg
Attachment 2: ITMX_se.jpg
ITMX_se.jpg
Attachment 3: ETMX_ne.jpg
ETMX_ne.jpg
  8280   Tue Mar 12 14:51:00 2013 SteveUpdateComputersbuy warranty or not ?

 Details of the warranties are posted on wiki power supply cost, warranty described, cost

.......I’ve also attached a warranty renewal quote.  A 1 year warranty renewal is usually $.... per year, but we gave you special pricing of $.... / year if you renew both units.  This pricing is also special due to the fact that both warranties expired awhile ago.  We usually require that the warranty renewal begin on the date of expiration, but we will waive this for you this time if both are renewed.

 

JetStor SATA 416S, SN: SB09040111A3 – expired 04/24/2012 (3 years old)

 

JetStor SATA 516F, SN: SB09080016P – expired on 08/21/2012........

 

. Are we keep it for an other 2 years? buy warranty or buy better storage.

 

  8285   Wed Mar 13 11:34:24 2013 SteveUpdateoptical tablestable covers moved to CES

The two acrylic optical table enclosures were moved from the carpenter shop to CES. I need to order windows. The latest quotes from Laseroptik  are posted at the wiki / aux_optics page.

Things to do: order windows, draw and order window flange, install surgical tubing seals, buy and line enclosures with IR shield films.

Attachment 1: acrylicEnclosure.jpg
acrylicEnclosure.jpg
  8307   Mon Mar 18 14:58:15 2013 SteveUpdateGreen Lockingrepair or replace dead NPRO

 

 JDSU can repair the Lightwave M126-1064-700 NPRO, sn 415  They do not need the Controller sn 516 

 Posted in the 40m Wiki_ PSL_ NPRO  cost repair and/or option to buy Innolight laser as replacement

  8311   Tue Mar 19 17:00:14 2013 SteveUpdateVAClarge window quote of Cascade

Optical quality 6.5" OD window specs and quotes for vacuum view ports and optical table enclosure are on the 40m wiki_ Aux Optics page.

We have just received a very good quote #2  from Cascade  Optical.

  8314   Wed Mar 20 08:59:24 2013 SteveUpdatePEMair cond maitenance is today

 Outside air quality at 8:30am  1.1 million of 0.5 micron particles cf / min with MET counter #2

AC unit output measured  directly at the outlet of east end  6,000  and south end 3,000 of 0.5 micron particles cf / min with counter #2

Lab measurement at the top of IOOC 20K of 0.5 micron particles cf / min with MET #1

HEPA filters: 2 mobile units  at the middle of the east arm at speed 100%, PSL enclosure 20% and south end flow bench are running.

The PSL, south flow bench and mobile unit (Envirco  sn69406003 ) measured zero counts of 0.5 & 0.3 micron particles

Envirco HEPA filter unit sn 69406001 measured 50 particles of 0.5micron and 320 of 0.3 micron particles cf / min with counter #2

This filter will be replaced.

                   

NOTE: inside air quality peaks we can not control. It depends on the weather and our house keeping.

When your work is particle sensitive keep your eyes on the particle counter.

 

 

 

 

Attachment 1: 100dPEM.png
100dPEM.png
  8315   Wed Mar 20 14:00:21 2013 SteveUpdate40m UpgradingEndtable upgrade

As discussed at the 40m meeting: Koji, Manasa and Steve

We are planning to remove the whole 4'x2' optical table ETMY-ISCT with optics as it is tomorrow morning.
This way I can start placing the new 4'x3' table and acrylic enclosure in place.

  8320   Thu Mar 21 08:11:53 2013 SteveUpdate40m UpgradingETMY table swap

Quote:

Quote:

As discussed at the 40m meeting: Koji, Manasa and Steve

We are planning to remove the whole 4'x2' optical table ETMY-ISCT with optics as it is tomorrow morning.
This way I can start placing the new 4'x3' table and acrylic enclosure in place.

I will be removing all cables on the ETMY endtable and labeling them today before we remove the table tomorrow morning. If there is anything else that should be done before the swapping which we might have not considered, elog it and we'll have it all done.

Also,I've attached the updated inventory.

 The cables are Not disconnected. I have people coming to do the lifting at 9:45am  Email is not working. This will cause a delay. I need conformation that we still moving on with the swap

  8330   Thu Mar 21 17:06:34 2013 SteveUpdate40m UpgradingETMY table is out

Quote:

Yes! We are swapping.

I'll be there very soon!

 The ETMY optical table 4' x 2' with all optical components was placed on two carts and rolled out of the end.  The 4' x 3' x 4" TMC 78-235-02R breadboard was placed into position and marked for anchoring bolt locations.

It will be drilled, tapped, shimmed, leveled and bolted it into final position tomorrow morning.  I'm planning to bring  the acrylic enclosure to the east end tomorrow afternoon.

Attachment 1: ETMYtableSupport.jpg
ETMYtableSupport.jpg
  8340   Mon Mar 25 18:07:31 2013 SteveUpdate40m UpgradingETMY table is out

Quote:

Quote:

Yes! We are swapping.

I'll be there very soon!

 The ETMY optical table 4' x 2' with all optical components was placed on two carts and rolled out of the end.  The 4' x 3' x 4" TMC 78-235-02R breadboard was placed into position and marked for anchoring bolt locations.

It will be drilled, tapped, shimmed, leveled and bolted it into final position tomorrow morning.  I'm planning to bring  the acrylic enclosure to the east end tomorrow afternoon.

 The new table is tapped and leveled, but not ready for final anchoring. The existing 8 mm shims on the top of the support legs will be moved to the bottom of the legs, where more torque is available on the 1/2" bolts

The coated tin film sheets are being installed at the shop. The table and the enclosure will be ready on Friday.

Attachment 1: shimmingEE.jpg
shimmingEE.jpg
  8350   Tue Mar 26 08:50:02 2013 SteveUpdateGeneraljanitor day

Keven, our janitor accidentally pushed the main entry door laser emergency stop switch.

The laser was turned back on. The MC and the arms were  started  flashing happily as they were before.

  8356   Tue Mar 26 16:36:24 2013 SteveUpdate40m Upgrading table leveling mounts go here

Quote:

Steve's suggestion for how to level the end table using "swivel leveling mounts":

end-tabel-leveling.png

 

1, level table with 4 swivels, lock nuts  3/16 -vertical alignment    2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction

   Adjustable mount is here to compensate for bad tilting  floor <http://www.mcmaster.com/#6111K52>  

      See grouting plans of the past   http://nodus.ligo.caltech.edu:8080/40m/7248

Attachment 1: optabSTAND.PDF
optabSTAND.PDF
Attachment 2: swivvelMountEE.jpg
swivvelMountEE.jpg
  8365   Thu Mar 28 07:58:15 2013 SteveUpdateGreen LockingNPRO repair

Quote:

 

 JDSU can repair the Lightwave M126-1064-700 NPRO, sn 415  They do not need the Controller sn 516 

 Posted in the 40m Wiki_ PSL_ NPRO  cost repair and/or option to buy Innolight laser as replacement

 NPRO shipped out for evaluation yesterday under RMA 18022707

  8372   Fri Mar 29 16:30:27 2013 SteveUpdate40m Upgrading table leveling mounts go here

Quote:

Quote:

Steve's suggestion for how to level the end table using "swivel leveling mounts":

end-tabel-leveling.png

 

1, level table with 4 swivels, lock nuts  3/16 -vertical alignment    2, lock this position with 4 x 1/4-20 (these are in place already) to hold table in horizontal direction

   Adjustable mount is here to compensate for bad tilting  floor <http://www.mcmaster.com/#6111K52>  

      See grouting plans of the past   http://nodus.ligo.caltech.edu:8080/40m/7248

 

  8373   Fri Mar 29 16:35:54 2013 SteveUpdate40m UpgradingEndtable upgrade

 

 My full effort to get the optical table enclosure ready for the lab has failed today.

What I did: cut IR thermashield sheets to size for sides and top and sandwitched them beetween 1" and 1/4" acrylic.

                   The carpenter shop recut the bottom o -ring groove to 0.250" wide and 0.150" deep.

                   O-ring was cut and installed. So this was ready to go lab.

                  NO, I realized that the liner yellow acrylic was not cut correctly. It was larger than 1" wall.

                 The shop is cutting them down to fit and I have to resize IR shields

  8392   Tue Apr 2 17:23:23 2013 SteveUpdate40m Upgradingnew ETMY optical table & enclosure in place

 Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm

I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.

 

Attachment 1: EEopt1d.jpg
EEopt1d.jpg
  8416   Thu Apr 4 17:23:05 2013 SteveUpdate40m Upgrading ETMY optical table & enclosure is ready for optics

Quote:

 Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm

I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.

 

 Glued surgical latex tubing with super glue into O-ring shape. The existing in place tubing K-100, OD 0.125" (actual size 0.140"), wall 0.031", ID 0.062".

I have just found out that tolerances on tubing OD are + - 0.026" by the manufacturer. I'm getting larger tubing for better fit.

The table is ready for optics.

Things left to do:

1, finalize o-ring size  2, finish cable feedthrough  3, finalize window connection 4, IR-Thermashield strips for bridge sides 5, replace bridge support post with solid one

 

  8421   Mon Apr 8 08:05:41 2013 SteveUpdatePSLPMC locked

The PMC locked manually. MC  grabbed lock instantaniously

  8423   Mon Apr 8 16:37:26 2013 SteveUpdate40m UpgradingETMY enclosure wall transmission

 

 Enclosure cover #1 transmission measured  in 1064 nm,  156 mW,  P polarization and beam size ~ 1 mm

As condition:  fully assembled, protective layer removed, tinted- adhesive activated on yellow acrylic on top of each other.

T = 1.2 % in 20 minutes exposure test. This agrees with the test measurement of 6-18-2012

There is a reflected  2-3 cm circular glare that is barely visible on sensor card. It is well below 1 mW level

As we are installing the NPRO with ~350 mW of power we have to address what additional shield should be installed.

The June 2012 test with 1W power burned through of the 3 layer  IR coated films in 3-4 hours.

We 'll use Aluminum shields in the high power path till we come up with better solution.

  8429   Tue Apr 9 07:48:10 2013 SteveUpdatePSLPMC locked

Quote:

The PMC locked manually. MC  grabbed lock instantaniously

 PMC locked

Attachment 1: pmc10d.png
pmc10d.png
  8430   Tue Apr 9 08:37:54 2013 SteveUpdate40m UpgradingEndtable upgrade for auxiliary green laser : TRY temporarily in place

Quote:

The TRY path on the end table is temporarily in place to help IFO locking.
The Y arm transmission was steered to get TRY back on the PD and the camera. I found that TRY is a couple of inches off in yaw at the end table (comparing to the CAD layout and the earlier layout) and I believe it is because of the changes in input pointing.
I've used a Y1 mirror to steer the Y transmission to an R98% BS. The reflected beam falls on PDA520 and the transmitted beam is steered to the camera. The earlier normalization of TRY is no more valid as the power distribution at the PD has changed.

Temporary  acrylic wind guard added between enclosure and ETMY transmission window to help IFO locking

  8435   Wed Apr 10 07:37:33 2013 SteveUpdatePSLPMC locked

Quote:

Quote:

The PMC locked manually. MC  grabbed lock instantaniously

 PMC locked

 PMC locked.

Attachment 1: pmc4d.png
pmc4d.png
  8443   Thu Apr 11 10:15:55 2013 SteveUpdateLockingPRM yaw oplev transferfunction

See   Feb 2012 PRM yaw transferfunctions, also check Valera's modified  side sensor may effect yaw motion

 

  8461   Thu Apr 18 15:08:14 2013 SteveUpdatePEMseismometer isolation kit in place

Quote:

 We got granite bases today from the manufacturer. We plan to set them up on Wednesday, 8 am. Please note, there will be an installation mess at Xend, Yend and corner during ~4 hours. Let us know if you have any objections to do this at this particular time.

Installation locations are specified in elog 8270, scheme attached is valid except for Xend. Instrument will be installed on the place of nitrogen containers.

(  next to the wall at corner sout-east of the south end )

 The carpenter shop finished the installation of the 3 granite bases.Rapid Set Cement All high strength non-shrink grout was used.

 Compressive strength  3000 PSI at 1 hour and 9000 PSI at day 28 The janitor is still cleaning up after them at the south end.

The  soft silicon gas kits are working well with the SS can.  Den is making  the adaptor plate drawing for the feedthrough.

Attachment 1: grouting1.jpg
grouting1.jpg
Attachment 2: grouting2.jpg
grouting2.jpg
Attachment 3: grouting3.jpg
grouting3.jpg
Attachment 4: grouting4.png
grouting4.png
  8472   Mon Apr 22 17:43:09 2013 SteveUpdate40m Upgrading ETMY optical table & enclosure is ready for optics

Quote:

Quote:

 Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm

I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.

 

 Glued surgical latex tubing with super glue into O-ring shape. The existing in place tubing K-100, OD 0.125" (actual size 0.140"), wall 0.031", ID 0.062".

I have just found out that tolerances on tubing OD are + - 0.026" by the manufacturer. I'm getting larger tubing for better fit.

The table is ready for optics.

Things left to do:

1, finalize o-ring size  2, finish cable feedthrough  3, finalize window connection 4, IR-Thermashield strips for bridge sides 5, replace bridge support post with solid one

 

 I'm working on to improve the quality of the enclosure.

The short comings are: more cable feedthroughs needed, latches to anchor top covers air tight and posts to support bending bridges.

Red triangles are compression latches at 10 places to hold the top air tight on surgical tubing

Green lines represent 4  posts of Al 1" OD to support the covers and maximize their eigenfrequencies.

Black crosses are 4 spring loaded push-bottom quick release pins to anchor the top covers to the bridges. This connection will  not be air tight.

(quarter-turn wing head fastener have the same problem) I'm thinking of some solution to minimize the leak.    

Violet _ steel plate (1" wide, 15" long, 0.125" thick)  between the two posts will anchor the quick release pins and make bridge rigid.

Blue rectangle is an other cable feedthrough exiting on the chamber side.

Planning to substitute window with soft - air tight ( Aluminized thin wall hose )  connection to vacuum view port where white circle is representing the Al adaptor ring.

Updated after Wednesday meeting 4-24-2013

 

Attachment 1: more2.jpg
more2.jpg
  8503   Mon Apr 29 08:22:57 2013 SteveUpdateSAFETYsafety training

 

 Albert, our new undergrad work force received 40m specific- basic safety training last week. Please read and sign 40m procedures booklet.

  8518   Wed May 1 10:42:35 2013 SteveUpdateLSCcleanup

 

 Optics from the car were placed into glass door cabinet E0