40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 141 of 341  Not logged in ELOG logo
Entry  Thu Aug 11 11:51:38 2016, Praful, Update, Computer Scripts / Programs, Summary Pages 
Entry  Thu Aug 11 17:30:05 2016, Praful, Update, Electronics, Mic Amplifier new_setup.jpgnew_setup2.jpg
Entry  Fri Aug 12 19:13:25 2016, Praful, Update, Electronics, Mic Self Noise 8x
    Reply  Mon Aug 15 12:23:56 2016, Praful, Update, PEM, Mic Self Noise 9x
Entry  Sun Aug 21 17:21:22 2016, Praful, Update, Electronics, Problems with PCB Circuit 18x
    Reply  Mon Aug 22 18:35:16 2016, Praful, Update, PEM, the lab temp is up temp_plot.pngtemp_plot.pngtemp_plot.png
Entry  Tue Aug 23 17:05:20 2016, Praful, Update, Electronics, Soldered Circuit Working 10x
Entry  Wed Aug 24 14:11:09 2016, Praful, Update, Electronics, Microphone Testing white_v_ambient.pngwhite_v_ambient.pdfwhite_v_ambient.pdf
    Reply  Wed Aug 24 14:44:33 2016, Praful, Update, Electronics, Decoupling capacitor 101 
Entry  Wed Aug 24 23:47:30 2016, Praful, Update, Electronics, Finished Prototype Box out1.pdfout2.pdfout3.pdfin1.pdfin2.pdf
Entry  Thu Aug 25 19:03:56 2016, Praful, Update, Electronics, Acoustic Tab and Amp Suspension 
    Reply  Thu Sep 1 17:25:02 2016, Praful, Update, Electronics, Acoustic Tab and Amp Suspension 
Entry  Wed May 3 17:16:30 2017, Praful, Update, Electronics, New Altium Schematic Design for Microphone Amp mic_schematicv2.pdf
Entry  Thu Mar 12 19:54:31 2015, Q , Update, LSC, How to: PRY 
Entry  Sat Oct 26 21:46:33 2013, RANA, Update, IOO, Mode Cleaner Tune-UP MCtrend.pdfMC40days.png
Entry  Sun Oct 27 00:15:35 2013, RANA, Update, SUS, c1auxex arms.pdfarm-mc2-dewhite.pdf
    Reply  Mon Oct 28 21:33:55 2013, RANA, Update, IOO, Mode Cleaner Tune-UP Untitled.png
    Reply  Thu Oct 31 20:05:48 2013, RANA, Update, IOO, Mode Cleaner Tune-UP drifty.png
    Reply  Mon Nov 11 22:35:45 2013, RANA, Update, IOO, PSL pointing monitoring qpd.pdf
    Reply  Tue Nov 12 23:48:23 2013, RANA, Update, IOO, PSL pointing monitoring 
    Reply  Mon Nov 18 19:45:42 2013, RANA, Update, SUS, PRM pictures 
Entry  Mon Jan 6 18:32:17 2014, RANA, Update, IOO, MC1/3 kicked this morning at 8:30 kicked.png
    Reply  Mon Feb 24 17:59:31 2014, RANA, Update, Electronics, Measured REFL165 demod board  
    Reply  Fri Sep 23 14:10:19 2022, Radhika, Update, BHD, BH55 RFPD installed - part I IMG_3766.jpegIMG_3770.jpegIMG_3773.jpeg
Entry  Thu Oct 25 15:38:06 2012, Raji, Update, Alignment, Transmitance Measurements on LaserOptik mirror 
    Reply  Wed Oct 31 12:58:17 2012, Raji, Update, Alignment, Transmitance Measurements on LaserOptik mirror Transmission-plot@1064nm.pdfTransmission-data@1064nm.pdf
    Reply  Fri Jul 16 23:53:27 2010, Rana, Update, PSL, Reference Cavity Insulation 
    Reply  Fri Jul 23 16:02:16 2010, Rana, Update, PSL, Reference Cavity Insulation Untitled.png
    Reply  Fri Jul 23 21:14:29 2010, Rana, Update, PSL, Reference Cavity Insulation 
Entry  Fri Dec 21 16:50:30 2012, Rana, Update, SUS, TT in vac DB25 pin swapping 
    Reply  Tue Apr 2 21:11:42 2013, Rana, Update, optical tables, Optical Table Toolboxes Update 
    Reply  Wed Oct 30 03:33:17 2013, Rana, Update, LSC, LSC demod boards need some thought 0309.png
    Reply  Wed Apr 21 11:01:37 2021, Rana, Update, CDS, 40m LSC simPlant model 
Entry  Wed Aug 26 19:58:14 2009, Rana, Alberto, Update, PSL, Reference Cavity Temperature Control: MINCO PID removed rc.png
Entry  Thu Jun 27 22:52:38 2013, Rana, Gabriele, Francesco, Summary, Computer Scripts / Programs, LIGO-DV installed ldv.png
Entry  Tue Apr 2 10:22:37 2013, Rana, Gabriele, Jenne, Update, LSC, PRMI lock lock_prmi_sb.pdf
Entry  Tue Dec 29 13:57:20 2009, Rana, Kiwamu, and Haixing, Update, Photos, Photos of video switch box 
Entry  Wed Jun 23 12:28:34 2010, Razib, Summary, Phase Camera, Weeekly Summary trigger-box_circuit.pngtest1.png
Entry  Wed Jun 30 12:20:49 2010, Razib, Update, Phase Camera, Weekly update 
Entry  Wed Jul 7 12:17:36 2010, Razib, Update, Phase Camera, Weekly update DC_1Hz_beat_sig.jpgDC_1Hz_beat_sig.jpgDC_5Hz_beat_sig.jpg
    Reply  Fri Jul 9 12:07:26 2010, Razib, Update, Phase Camera, Weekly update phase_cam_setup_09_08_10.jpgmod_setup_(copy)_annotated.jpg
    Reply  Wed Jul 14 11:51:48 2010, Razib, Update, Phase Camera, Work near 1Y2 yesterday 
Entry  Wed Jul 14 12:12:03 2010, Razib, Summary, Phase Camera, Weekly update 
Entry  Wed Jul 21 12:20:58 2010, Razib, Update, Phase Camera, Weekly update phase_cam_setup_21_07_2010.jpg
Entry  Wed Jul 28 13:06:47 2010, Razib, Update, Phase Camera,  mean_100_snaps.pngstd_100_snaps.pngphase_cam_calc.pdf
    Reply  Thu Aug 12 16:52:02 2010, Razib, Update, Phase Camera, Sideband power measurement (updated) SCR.jpgDC_sig_sideband_profile.jpgsideband_profile.jpgsine_trig.jpgsine_trig.jpg
    Reply  Thu Aug 12 17:28:28 2010, Razib, Update, Phase Camera, Sideband power measurement (updated) 
Entry  Wed Aug 4 16:52:59 2010, Razib, Aidan, Update, Phase Camera, Sideband power measurement (updated) Setup_08_04_2010.jpgpower_40MHz.pngpower_25MHz.png
Entry  Wed Jul 16 21:24:41 2014, Reetika, Update, Electronics, VCO Driver inside 40m 
Entry  Mon Nov 26 19:27:59 2012, Riju, HowTo, , Testing AG4395A+GPIB tfmag.jpgtfphase.jpg
ELOG V3.1.3-