Sat Sep 5 14:28:03 2020, Koji, Update, General, LO beam: Fiber coupling work
|
Fri Sep 4 15:26:55 2020, Jon, Update, VAC, Vac system UPS installation
|
Fri Sep 4 21:12:51 2020, Jon, Update, VAC, Vac system UPS installation
|
Sat Sep 5 12:01:10 2020, Jon, Update, VAC, Vac system UPS installation 
|
Fri Aug 28 23:33:38 2020, gautam, Update, BHD, Some more hardware changes
|
Sat Aug 29 22:46:29 2020, gautam, Update, BHD, New homodyne-phase control electronics 
|
Wed Sep 2 00:49:47 2020, gautam, Update, BHD, Some notes about homodyne phase   
|
Thu Sep 3 15:55:04 2020, gautam, Update, BHD, Phase drift between LO and IFO after fiber replacement 
|
Thu Sep 3 00:00:57 2020, gautam, Update, BHD, New patch cable installed
|
Tue Sep 1 01:49:49 2020, Koji, Update, Electronics, Teledyne AP1053 etc were transported  
|
Sun Aug 30 11:29:33 2020, rana, Update, General, power blink?
|
Sat Aug 29 18:52:42 2020, rana, Update, IOO, IMC gain change
|
Fri Aug 28 11:41:23 2020, gautam, Bureaucracy, safety, Crane inspection 2020
|
Wed Aug 26 22:49:47 2020, gautam, Update, Electronics, Checkout of Trek Model 603
|
Wed Aug 26 15:48:31 2020, gautam, Update, VAC, Control screen left open on vacuum workstation
|
Mon Aug 10 16:52:04 2020, gautam, Update, BHD, Workable setup prepared
|
Tue Aug 11 23:20:29 2020, gautam, Update, BHD, Some first tests with air BHD setup 
|
Fri Aug 21 15:27:00 2020, gautam, Update, BHD, Better BHD mode-matching  
|
Wed Aug 26 00:52:55 2020, gautam, Update, BHD, BHD activities
|
Mon Aug 24 08:13:56 2020, Jon, Update, VAC, UPS installation
|
Mon Aug 24 11:25:07 2020, Jon, Update, VAC, UPS installation
|
Mon Aug 17 23:36:10 2020, gautam, Update, ALS, Whitening and ALS noise
|
Tue Aug 18 13:55:23 2020, rana, Update, ALS, Whitening and ALS noise
|
Mon Aug 17 23:41:50 2020, gautam, Update, BHD, Whitening and air BHD dark noise
|
Mon Aug 17 21:24:43 2020, gautam, Update, General, Fire extinguisher inspection
|
Mon Aug 17 15:18:26 2020, gautam, Update, Equipment loan, Beam Profiler + peripherals --> 40m
|
Fri Aug 14 10:10:56 2020, Jon, Configuration, VAC, Vacuum repairs today
|
Sat Aug 15 02:02:13 2020, Jon, Configuration, VAC, Vacuum repairs today
|
Sat Aug 15 15:12:22 2020, Jon, Configuration, VAC, Overhaul of small turbo pump interlocks   
|
Wed Aug 12 17:36:42 2020, gautam, Update, CDS, Timing distribution slot availability
|
Wed Aug 12 20:14:06 2020, Koji, Update, CDS, Timing distribution slot availability
|
Thu Aug 13 11:30:19 2020, gautam, Update, CDS, Timing distribution slot availability
|
Thu Aug 13 13:35:13 2020, Koji, Update, CDS, Timing distribution slot availability
|
Fri Aug 14 10:03:37 2020, Jon, Update, CDS, Timing distribution slot availability
|
Fri Aug 14 00:01:55 2020, gautam, Update, CDS, BHD / OMC model channels now added to autoburt
|
Thu Aug 13 18:10:22 2020, gautam, Update, General, Power outage
|
Wed Aug 12 17:42:58 2020, gautam, Update, Electronics, Photodiode inventory 
|
Wed Aug 12 20:16:52 2020, Koji, Update, Electronics, Photodiode inventory
|
Sat Aug 8 07:36:52 2020, Sanika Khadkikar, Configuration, Calibration-Repair, BS Seismometer - Multi-channel calibration   
|
Thu Aug 6 22:57:20 2020, gautam, Update, safety, New live HV Supplies
|
Thu Jul 30 16:16:43 2020, gautam, Update, SUS, Suspension recovery
|
Thu Jul 9 17:12:52 2020, gautam, Update, BHD, In-air BHD 
|
Tue Jul 14 15:29:25 2020, gautam, Update, BHD, In-air BHD - DCPD amplifier noise
|
Wed Jul 15 19:11:40 2020, gautam, Update, BHD, In-air BHD - alignment into OMC
|
Thu Jul 16 01:12:22 2020, gautam, Update, BHD, In-air BHD - preparing the LO path   
|
Sun Jul 19 15:40:15 2020, gautam, Update, BHD, In-air BHD - CDS and wiring summary
|
Wed Jul 29 11:57:59 2020, rana, Update, BHD, In-air BHD - CDS and wiring summary
|
Mon Jul 20 17:55:15 2020, gautam, Update, BHD, In-air BHD - preparing the LO path
|
Tue Jul 21 00:30:24 2020, gautam, Update, BHD, In-air BHD - LO RIN
|
Tue Jul 28 12:22:40 2020, Jon, Update, VAC, Vac interlock test today 1:30 pm
|
Tue Jul 28 14:11:14 2020, Jon, Update, VAC, Vac interlock test today 1:30 pm
|
Tue Jul 28 13:55:11 2020, Hang, Update, BHD, Exploring bilinear SRCL->DARM coupling  
|
Thu Jul 23 15:58:24 2020, Jon, Summary, VAC, Vacuum controls refurbishment plan
|
Mon Jul 27 15:48:36 2020, Jon, Summary, VAC, Vacuum parts ordered
|
Fri Jul 24 15:40:59 2020, Jordan, Update, VAC, Installation of two new UPS units
|
Tue Jul 21 16:41:46 2020, gautam, Update, BHD, PMC assembly space
|
Mon Jul 20 19:21:16 2020, anchal, Summary, ALS, Few proposals for Voyager ALS
|
Tue Jul 14 16:52:47 2020, gautam, Update, Electronics, Coil drivers for the test masses
|
Wed Jul 15 21:08:43 2020, gautam, Update, Electronics, ETM coil outputs DQed 
|
Mon Jul 20 17:23:46 2020, gautam, Update, Electronics, Coil drivers for the test masses  
|
Fri Jul 17 09:03:58 2020, Jordan, Update, General, Presence at 40m
|
Fri Jul 17 00:18:13 2020, gautam, Update, General, Locking updat
|
Thu Jul 16 14:41:22 2020, gautam, Update, General, Fire extinguisher inspection
|
Wed Jul 15 19:23:44 2020, gautam, Update, General, Emergency light on in control room
|
Wed Jul 15 19:51:51 2020, Koji, Update, General, Emergency light on in control room
|
Wed Jul 15 20:58:40 2020, gautam, Update, General, Emergency light on in control room
|
Wed Jul 15 17:46:05 2020, anchal, Summary, ALS, Noise budget for ALS
|
Tue Jul 14 00:06:09 2020, gautam, Update, LSC, Locking with POX for CARM
|
Tue Jul 14 01:55:03 2020, Koji, Update, LSC, Locking with POX for CARM
|
Tue Jul 14 17:28:29 2020, gautam, Update, LSC, Locking with POX for CARM 
|
Tue Jul 14 09:04:53 2020, Jordan, Update, General, Presence at 40m
|
Fri Sep 6 16:38:24 2019, aaron, Update, ALARM, Alarm noise from smart-ups machine under workstation?
|
Fri Sep 6 18:08:29 2019, rana, Update, Computers, Alarm noise from smart-ups machine under workstation?
|
Thu Sep 12 09:49:07 2019, gautam, Update, Computers, control rm wkstns shutdown
|
Mon Sep 30 11:42:36 2019, aaron, Update, Computers, control rm wkstns shutdown
|
Wed Oct 2 20:45:18 2019, rana, Update, Computers, rossa revival
|
Thu Oct 3 21:50:22 2019, rana, Update, Computers, rossa revival
|
Mon Oct 28 18:55:06 2019, rana, Update, Computers, rossa revival
|
Wed Jan 22 16:38:01 2020, rana, Update, Computers, rossa revival
|
Wed Jul 1 18:16:09 2020, gautam, Update, Computers, rossa re-re-revival
|
Sun Jul 5 16:14:41 2020, rana, Update, Computers, rossa re-re-revival
|
Sun Jul 5 18:39:57 2020, rana, Update, Computers, rossa: printer
|
Mon Jul 6 00:37:28 2020, gautam, Update, Computers, rossa: lib symlink
|
Mon Jul 6 12:43:02 2020, rana, Update, Computers, rossa: lib symlink
|
Mon Jul 6 12:51:41 2020, gautam, Update, Computers, rossa: resolvconf installed
|
Wed Jul 8 22:50:33 2020, gautam, Update, Computers, rossa: more symlinks
|
Thu Jul 9 16:16:20 2020, gautam, Update, Computers, rossa: graphics driver issues?
|
Sat Jul 11 00:10:22 2020, gautam, Update, Computers, rossa: more developmental work
|
Mon Jul 13 11:33:18 2020, rana, Update, Computers, rossa: more developmental work
|
Mon Jul 13 12:37:05 2020, gautam, Update, Computers, rossa: more developmental work
|
Fri Jul 10 01:25:28 2020, gautam, Update, LSC, Locking notes
|
Fri Jul 10 15:26:28 2020, gautam, Update, LSC, MC2 coils need DC balancing? 
|
Sat Jul 11 18:24:30 2020, Koji, Update, LSC, MC2 coils need DC balancing?
|
Sun Jul 12 02:42:01 2020, gautam, Update, LSC, Locking (on rossa)
|
Mon Jul 13 11:36:08 2020, rana, Update, LSC, MC2 coils need DC balancing?
|
Fri Jul 10 10:37:30 2020, Jordan, Update, General, Presence at 40m
|
Wed Jul 1 18:03:04 2020, Jon, Configuration, VAC, UPS replacements
|
Thu Jul 9 18:00:35 2020, Jon, Configuration, VAC, UPS replacements
|
Thu Jul 9 16:02:33 2020, Jon, HowTo, CDS, Procedure for setting up BHD front-ends
|
Thu Jul 9 09:22:44 2020, Jordan, Update, General, Presence at 40m
|
Wed Jul 8 08:51:35 2020, Jordan, Update, General, Presence at 40m
|
Tue May 26 02:15:36 2020, gautam, Update, LSC, Lock acquisition portal entry
|
Tue May 26 02:31:00 2020, gautam, Update, LSC, Lock acquisition sequence
|
Wed May 27 20:14:51 2020, Koji, Update, LSC, Lock acquisition sequence
|
Tue May 26 02:37:19 2020, gautam, Update, LSC, DARM loop measurement and fitting 
|
Tue May 26 03:01:35 2020, gautam, Update, LSC, CARM loop
|
Wed Jun 3 01:46:14 2020, gautam, Update, LSC, CARM loop    
|
Tue May 26 03:06:59 2020, gautam, Update, LSC, PRFPMI sensing matrix 
|
Tue May 26 03:26:58 2020, gautam, Update, LSC, Preliminary noise budget
|
Tue May 26 14:32:44 2020, gautam, Update, LSC, Arm transmission RIN
|
Wed May 27 19:36:33 2020, Koji, Update, LSC, Arm transmission RIN
|
Thu May 28 18:36:45 2020, gautam, Update, LSC, Arm transmission RIN  
|
Fri May 29 00:34:57 2020, rana, Update, LSC, Arm transmission RIN
|
Wed Jun 3 02:14:32 2020, gautam, Update, ASC, PRC ASC improves arm transmission RIN    
|
Fri Jun 19 16:30:09 2020, gautam, Update, ASC, Some thoughts about ASC 
|
Tue Jul 7 14:06:10 2020, gautam, Update, ASC, Some more thoughts about ASC
|
Tue May 26 16:00:06 2020, gautam, Update, LSC, Power buildup diagnostics 
|
Wed May 27 17:41:57 2020, Koji, Update, LSC, Power buildup diagnostics
|
Wed Jun 3 02:08:00 2020, gautam, Update, LSC, Power buildup diagnostics 
|
Wed Jun 3 01:34:53 2020, gautam, Update, LSC, Lock acquisition update portal
|
Wed Jun 3 03:29:26 2020, Koji, Update, LSC, Lock acquisition update portal
|
Wed Jun 3 11:40:56 2020, gautam, Update, LSC, Lock acquisition update portal
|
Wed Jun 3 18:49:47 2020, gautam, Update, LSC, PRG and CARM signal sign   
|
Fri Jun 19 17:06:50 2020, gautam, Update, LSC, What should the short-term commissioning goals be?
|
Wed Jun 24 17:20:16 2020, gautam, Update, LSC, What should the short-term commissioning goals be?
|
Tue Jun 30 10:59:16 2020, gautam, Update, LSC, Three sensing matrices  
|
Mon Jul 6 17:41:19 2020, gautam, Update, LSC, An LSC puzzler
|
Mon Jul 6 15:10:40 2020, Jon, Summary, BHD, 40m --> A+ BHD design analysis
|
Mon Jul 6 08:48:15 2020, Jordan, Update, General, Presence at 40m
|
|