  9634   Thu Feb 13 19:36:36 2014 KojiSummaryLSCPRM 2nd/4th violin filter addedJenne and I noticed high pitch sound from
our acoustic interferometer noise diagnostic
system.
  
  9633   Thu Feb 13 16:48:33 2014 SteveUpdateGreen LockingX and Y arm green tuned details

    

       
            
  
  9632   Thu Feb 13 13:18:33 2014 manasaUpdateIOOMC needed some helpThe MC has been funny since yesterday.
I checked the suspensions INMON channels
and they seemed ok. So I went ahead and tweaked
  
  9631   Wed Feb 12 20:30:41 2014 KojiUpdateLSCCalibrated REFL signalsWe usually want to remove PRCL from the
Q quadrature for each PD. 
Therefore, you are not supposed to
  
  9630   Wed Feb 12 19:47:40 2014 JenneUpdateLSCCalibrated REFL signalsI calibrated the REFL signals to meters
from counts.  The I-phase signals all
line up very nicely, but the Q-phase signals
 CalibratedUsingPRMdrive.pdf 
  9629   Wed Feb 12 19:37:05 2014 JenneUpdateSUSclipping removed from PRM oplevI'm not happy with the beam position on
that first lens, but since it's so crazy
in the BS chamber, and the PRM oplev has
  
  9628   Wed Feb 12 14:59:36 2014 SteveUpdateSUSclipping removed from PRM oplev The input pointing of PRM oplev beam
was streered just a touch to remove clipping
from it's return. 
 PRMoplPointing.jpgPRMoplevReturn.jpg 
  9627   Wed Feb 12 14:05:16 2014 ericqUpdateSUSPRM Oplev Checked Out [ericq]
Steve fixed the PRM oplev pointing.
I turned on the loops and measured the OLG,
 ol_spectra.pdf 
  9626   Wed Feb 12 11:57:55 2014 JenneUpdateLSCMusings on RFPDs[Rana, Jenne, Manasa]
We looked at the I vs. Q separation
in several of the Refl PDs, while driving
  
  9625   Tue Feb 11 22:17:06 2014 KojiUpdateGreen LockingALS X and Y arm restoredNice restoration. We eventually want to
make transition of the servo part from ALS
to LSC model for the further handing off
  
  9624   Tue Feb 11 21:22:02 2014 manasaUpdateGreen LockingALS X and Y arm restoredThe X and
Y arms were locked successfully using ALS
  
  9623   Tue Feb 11 16:49:36 2014 SteveUpdatePEM floor cleaning Keven, Steve
 
The floor was cleaned under the east
  
  9622   Tue Feb 11 10:44:15 2014 SteveUpdateVACRGA scan at day 6 
 
 pd77m6d.png 
  9621   Mon Feb 10 22:21:55 2014 manasaUpdateGreen LockingX and Y arm green tunedY arm green: Nothing
much was disturbed. I touched the steering
mirrors and brought 
  
  9620   Mon Feb 10 19:56:10 2014 ranaUpdateASCPRM ASC better, but not great yetIgnoring the OSEM damping loops, the oplev
servo loops make it so that the POP ASC loops
do not see a simple pendulum plant, but instead
  
  9619   Mon Feb 10 18:59:25 2014 JenneUpdateASCPRM ASC better, but not great yetI have turned off the 3.2Hz res gains in
the PRC ASC loops, since those seem to make
the loops unstable. 
  
  9618   Mon Feb 10 18:03:41 2014 jamieUpdateCDS12 core c1sus replacementI have configured one of the spare Supermicro
X8DTU-F chassis as a dual-CPU, 12-core CDS
front end machine.  This is meant to
  
  9617   Mon Feb 10 16:20:28 2014 JenneUpdateGeneralPRM QPD recenteredIn an effort to stop the PRC from wiggling
around so much, I recentered the POP QPD
after maximizing the POPDC power when locked
  
  9616   Mon Feb 10 16:02:12 2014 JenneUpdateGeneralPRM oplev clipped in vacuumThe PRC (locked on carrier so far today),
is pretty wobbly.  It'll stay locked
on carrier, but it's wobbling.  The
 Screenshot-Untitled_Window-1.png 
  9615   Mon Feb 10 09:45:53 2014 SteveUpdateVACvacuum normal is reached 


 pd77m5d.png13daysAtm.png 
  9614   Sat Feb 8 15:14:18 2014 ericqUpdateLSCPRM Sideband Splitting[ericq]
Today, I kicked the PRM to see the
sideband splitting in POP110. 
 PRCpeaks.pdf 
  9613   Fri Feb 7 17:52:41 2014 KojiSummaryGeneralSome cleaning up
    Adjusted the PMC alignment

   Adjusted the IMC length offsets for
the MC servo and the FSS servo
   
  
  9612   Fri Feb 7 13:30:25 2014 ericqUpdateGeneralIn-Vac Alignment

    

       
            
  
  9611   Fri Feb 7 13:30:22 2014 GabrieleUpdateGeneralIn-Vac Alignment

    

       
            
  
  9610   Fri Feb 7 13:00:52 2014 JenneUpdateGeneralIn-Vac Alignment

    

       
            
  
  9609   Fri Feb 7 12:43:12 2014 ericqUpdateGeneralIn-Vac Alignment[ericq]
  
  9608   Thu Feb 6 16:41:31 2014 ericqUpdateGeneralIn-Vac Alignment[Manasa, ericq]
Both arms
  
  9607   Thu Feb 6 11:14:07 2014 SteveUpdateVACpumpdown completed Pumpdown completed. IR shutter opened
at P1 1 mTorr  The block is still in
the beam path.
 pd77.png 
  9606   Wed Feb 5 20:41:57 2014 DenUpdateLSCcalibrated spetra from OAF testWe did online adaptive filtering test with
IMC and arms 1 year ago (log
7771). In the 40m presentations I can
 oaf_cal.pdf 
  9605   Wed Feb 5 19:53:51 2014 SteveUpdateVACpumpdown stops for the day at 14 Torr 
 
 stopHere.png 
  9604   Wed Feb 5 19:36:50 2014 SteveUpdateVACpumpdown at 25 Torr

    

       
            
 pd77at3.5h.png 
  9603   Wed Feb 5 18:36:56 2014 ranaFrogselogMicroSoft BingBot is attacking us The ELOG was frozen, with this in
the .log file:   
GET /40m/?id=1279&select=1&rsort=Type
  
  9602   Wed Feb 5 15:39:41 2014 manasaUpdateGeneralWe are pumping down[Steve, Manasa]
I checked the alignment one last
time. The arms locked, PRM aligned, oplevs
 pre_pump_down.png 
  9601   Wed Feb 5 15:26:57 2014 manasaUpdateGeneralReady for pump down??

    

       
            
  
  9600   Wed Feb 5 09:28:32 2014 SteveUpdateSUSETMY damping restoredETMY damping restored.   
  9599   Wed Feb 5 08:14:59 2014 SteveUpdateVAC vacuum computers are back without safety

    

       
            
  
  9598   Tue Feb 4 23:01:24 2014 JenneUpdateGeneralReady for pump down?? 
 This sounds great! The only
suggestion that I have is for checking POP.
  
  9597   Tue Feb 4 17:40:19 2014 manasaUpdateGeneralReady for pump down??

    

       
            
  
  9596   Tue Feb 4 16:43:50 2014 manasaUpdateGeneralIFO alignment update[EricQ, Manasa]
We are close to the end of the vent
except for a couple of issues.
  
  9595   Tue Feb 4 01:02:03 2014 KojiUpdateGreen LockingETMX green powerManasa, Steve: Please revisit the Xend
oven temperature again.
 Screenshot-Untitled_Window.png 
  9594   Tue Feb 4 00:42:18 2014 KojiUpdateGeneralX arm aligned for IR/GRThe
X arm was also aligned for the IR by hand
and ASS. Also the X end green PZT was aligned
  
  9593   Mon Feb 3 23:31:33 2014 ManasaUpdateGeneralAlignment update / Y arm locked[EricQ, Manasa, Koji]
We measured the spot positions on
the MC mirrors and redid the MC alignment
  
  9592   Mon Feb 3 15:57:52 2014 SteveUpdateGreen LockingETMX green powerThere was 0.2 mW green at the X end.
The doubling oven temp was changed
from 37.5 to 36 degrees C
 ETMXgreen.jpgXgreenOven36C.jpg 
  9591   Mon Feb 3 10:17:14 2014 SteveUpdatePEMdusty surfacesPlease wet WIPE  AP-ISCT.jpgBSC-rim.jpgITMX-ISCT.jpg12daysAtm.png 
  9590   Fri Jan 31 19:29:36 2014 GabrieleSummaryLSCPRC and SRC lengths Today we measured the missing distance
to reconstruct SRC length.
I also changed the way the mirror
 map_jan31st.pdfsurvey_v3.zip 
  9589   Fri Jan 31 18:41:25 2014 manasaUpdateGeneralIFO alignment update[EricQ, Gabriele, Manasa]
We found we had lost the Y arm pointing
from yesterday. We tried to recover the pointing
  
  9588   Thu Jan 30 19:00:25 2014 GabrieleSummaryLSCPRC length changed [Manasa,
EricQ, Gabriele]
Today
 map_jan30.pdfsurvey_v3_jan30.m 
  9587   Thu Jan 30 11:59:03 2014 manasaUpdateCDSfb timing was off

    

       
            
  
  9586   Wed Jan 29 21:01:03 2014 GabrieleSummaryLSCPRC length measurement analysis [Manasa,
EricQ, Gabriele]
We
 map.pdfscript.zip 
  9585   Wed Jan 29 16:36:37 2014 KojiSummaryGeneralHigh power beam blasting of the aLIGO RFPD [Rich, Jay, Koji]
We blasted the aLIGO RF PD with a
1W IR beam. We did not find any obvious damage.
  