Sat Aug 15 18:35:14 2009, Clara, Frogs, Computers, How far back is complete data really saved? (or, is the cake a lie?)
|
Fri Aug 14 14:19:25 2009, Koji, Summary, Computers, nodus rebooted
|
Fri Aug 14 14:33:51 2009, Jenne, Summary, Computers, nodus rebooted
|
Fri Aug 14 15:20:42 2009, josephb, Summary, Computers, Linux1 now has 1.5 TB raid drive
|
Fri Aug 14 15:32:50 2009, Yoichi, HowTo, Computers, nodus boot procedure
|
Sat Aug 15 10:36:02 2009, Alan, HowTo, Computers, nodus boot procedure
|
Sat Aug 15 05:08:55 2009, Yoichi, Update, Locking, Friday night locking
|
Fri Aug 14 23:45:14 2009, Chris, Update, General, Long Range Readout  
|
Fri Aug 14 18:33:02 2009, Clara, Update, , Record of Accelerometer and Seismometer Movements
|
Fri Aug 14 15:29:43 2009, Jenne, Update, Computers, c1susvme2 was unmounted from /cvs/cds
|
Fri Aug 14 02:57:46 2009, Clara, Update, PEM, Redo of the Huddle Test
|
Thu Aug 13 22:53:48 2009, Yoichi, Configuration, PSL, FSS nominal common gain changed, MC WFS centered
|
Thu Aug 13 11:20:43 2009, janosch, HowTo, PEM, three-channel self-noise estimation
|
Thu Aug 13 00:11:43 2009, Jenne, Update, IOO, Mode Cleaner Unlock
|
Thu Aug 13 09:22:06 2009, rana, Update, PEM, ranger
|
Thu Aug 13 02:17:56 2009, Jenne, Update, IOO, Mode Cleaner Alignment
|
Wed Aug 12 23:45:03 2009, Chris, Update, General, Long range michelson
|
Wed Aug 12 15:02:33 2009, Alberto, Configuration, Computers, elog restarted
|
Wed Aug 12 13:35:03 2009, josephb, Alex, Configuration, Computers, Tested old Framebuilder 1.5 TB raid array on Linux1
|
Wed Aug 12 12:08:16 2009, Stephanie, Update, General, Multiply Resonant EOM Update  
|
Tue Aug 11 23:17:21 2009, rana, Summary, Computers, Nodus rebooted / SVN down
|
Wed Aug 12 10:35:17 2009, jenne, Summary, Computers, Nodus rebooted / SVN down
|
Wed Aug 12 02:00:32 2009, rob, Update, Locking, report
|
Tue Aug 11 23:55:04 2009, rana, rich, Summary, OMC, Quantum Efficiency and Dark Current measurements of eLIGO Photodiodes
|
Tue Aug 11 14:15:28 2009, Stephanie, Update, General, Multiply Resonant EOM Update
|
Tue Aug 11 02:15:20 2009, Clara, Update, PEM, Guralp breakout box circuit diagram 
|
Tue Aug 11 01:21:55 2009, rob, Update, PSL, MZ needs some attention
|
Mon Aug 10 20:49:13 2009, Alberto, Rana, Update, PSL, PMC Mode Matching Lenses Tuning
|
Mon Aug 10 14:58:01 2009, Jenne, Update, PEM, 2nd set of Guralp channels plugged into ADCU
|
Mon Aug 10 18:12:25 2009, Jenne, Update, PEM, 2nd set of Guralp channels plugged into ADCU
|
Mon Aug 10 17:49:10 2009, pete, Update, Computers, RCG work - plans
|
Mon Aug 10 17:36:32 2009, pete, Update, Computers, RCG work. PIT, YAW, POS in MDP/MDC system
|
Mon Aug 10 17:27:47 2009, rob, Configuration, LSC, TRX, TRY gain
|
Mon Aug 10 16:41:31 2009, Alberto, Configuration, PSL, PMC Visibility
|
Mon Aug 10 16:37:27 2009, rob, Update, PSL, MZ alignment touched
|
Mon Aug 10 15:24:17 2009, rob, Summary, PSL, MZ bad
|
Mon Aug 10 15:56:12 2009, rob, Summary, PSL, MZ bad redux
|
Mon Aug 10 11:33:58 2009, Jenne, Update, PSL, Non-Elogged Beam dump on the PSL table - BadBadBad
|
Mon Aug 10 15:21:15 2009, Jenne, Update, PSL, Non-Elogged Beam dump on the PSL table - BadBadBad
|
Fri Aug 7 16:00:17 2009, pete, Update, Computers, RCG work. MDC MDP open loop transfer function
|
Sun Aug 9 16:32:18 2009, rana, Update, Computers, RCG work. MDC MDP open loop transfer function
|
Sat Aug 8 17:23:29 2009, rana, Update, PEM, offensive 2 Hz sine wave removed
|
Fri Aug 7 20:43:35 2009, Clara, Jenne, Rana, Jan, Update, PEM, Two Guralps plugged in, prepped for huddle test
|
Sat Aug 8 17:19:07 2009, rana, Update, PEM, Two Guralps plugged in, prepped for huddle test
|
Sat Aug 8 15:08:14 2009, rana, Configuration, PSL, SMOO settings updated in psl.db and SVN updated
|
Fri Aug 7 18:06:24 2009, rob, Omnistructure, VAC, opening V1 when PTP1 is broken
|
Fri Aug 7 19:55:08 2009, steve, Summary, VAC, opening V1 when PTP1 is broken
|
Fri Aug 7 17:51:50 2009, Zach, Update, Cameras, CMOS vs. CCD
|
Fri Aug 7 17:46:21 2009, Zach, Update, Cameras, The phase camera is sort of working 
|
Thu Aug 6 23:29:47 2009, Jenne, Update, PSL, Ref cav reflection PD is funky
|
Fri Aug 7 00:10:14 2009, rana, Update, PSL, Ref cav reflection PD is funky
|
Fri Aug 7 17:05:34 2009, Jenne, Update, PSL, Ref cav reflection PD is funky
|
Fri Aug 7 16:53:35 2009, Clara, Update, PEM, Guralp breakout box noise, finally 
|
Fri Aug 7 09:50:57 2009, steve, Configuration, VAC, IFO pressure rose to 2.3 mTorr
|
Fri Aug 7 16:11:11 2009, steve, rob, Configuration, VAC, IFO pressure rose to 2.3 mTorr
|
Fri Aug 7 14:31:39 2009, Alberto, Update, PSL, DAQ REstarted
|
Fri Aug 7 13:42:12 2009, ajw, Omnistructure, Computers, backup of frames restored
|
Fri Aug 7 11:39:13 2009, Alberto, Update, PSL, MZ Alignment
|
Thu Aug 6 20:03:10 2009, Koji, Update, General, We left two carts near PSL table.
|
Thu Aug 6 17:45:37 2009, Jenne, Update, PSL, HEPAs on high
|
Thu Aug 6 19:54:04 2009, Stephanie, Update, PSL, HEPAs back to normal
|
Thu Aug 6 18:26:26 2009, Jenne, Update, PSL, Ref Cav and PMC aligned
|
Thu Aug 6 17:51:21 2009, Chris, Update, General, Displacement Sensor Update 
|
Thu Aug 6 18:21:03 2009, Chris, Update, General, Displacement Sensor Update
|
Tue Aug 4 23:03:56 2009, alberto, Update, Locking, IFO Alignment
|
Wed Aug 5 09:48:05 2009, alberto, Update, Locking, IFO Alignment 
|
Thu Aug 6 09:33:08 2009, alberto, Update, Locking, FSS Transmitted and Reflected Power Trends 
|
Thu Aug 6 10:32:45 2009, alberto, rob, Update, Locking, More PSL trends: NPRO, MOPA, FSS, PMC and MZ
|
Wed Aug 5 15:33:05 2009, rob, alberto, DAQ, General, can't get trends
|
Thu Aug 6 09:22:17 2009, Alberto, DAQ, General, can't get trends
|
Thu Aug 6 09:05:29 2009, steve, Update, VAC, large O-rings of vacuum envelope 
|
|