Entry  Thu Apr 28 08:49:47 2016, Steve, Update, PEM, possible noise sources schedule Campus_B&W_Map-2.pdf

Building:         Campus (see attached Map)        

       

Date:              Manhole 1 - May 3 through May 5
Entry  Mon May 2 17:06:58 2016, rana, Summary, COC, G&H optics to Fullerton/HWS for anneal testing 20160427_182305.jpg
Steve sent 4 of our 1" diameter G&H HR mirrors to Josh Smith at Fullerton for scatter testing. Attached photo is our total stock before sending.
Entry  Thu Apr 28 15:23:11 2016, ericq, Update, LSC, Green PDH demod lowpass 
The 2F product out of the mixer is a natural concern when demodulating. However, I think this isn't so big of a deal in our green PDH servos; 420kHz
isn't so high of a frequency that the servo amplifiers are bandwidth or slew-rate limited. Furthermore, the amplitude of this line is supressed
by the loop somewhat, since it arises from the same field product that the loop is acting on. Measuring the Y end mixer output with a high impedance probe
    Reply  Thu Apr 28 18:53:05 2016, rana, Update, LSC, Green PDH demod lowpass 
OK - but give us a circuit diagram and the expected before/after loop plots. Got to make sure we keep the right impedance from PD to mixer. Some of the
Thorlabs PDs have a 50 Ohm instead of 0 Ohm source impedance. Maybe you can try it out now since the green arm is ready.
       Reply  Fri Apr 29 16:13:36 2016, ericq, Update, LSC, Green PDH demod lowpass IMG_3186.jpgpdh_lpf.pngelp_liso.zip
We can get as much, if not more, attenuation of the 1F line in the mixer output that we get from the post-mixer LPF from
using the following passive filter between the PD and mixer RF input:

          Reply  Fri May 6 16:42:12 2016, ericq, Update, LSC, Green PDH demod lowpass pdh_lpf.pngAUX_X_PDH_OLG_May6.png
I've build the filter, and it seems to have the desired TF shape.



I also re-purposed the 70k lowass to a ~120k lowpass by changing the 68nF caps to 22nF caps, since we still want some post-mixer rolloff. 
             Reply  Fri May 6 19:08:52 2016, rana, Update, LSC, Green PDH demod lowpass 
Seems weird to design a PD lowpass with a corner at the modulation frequency. Recall what our strategy is with the other photodetectors we use for PDH
servos: bandpass, not low-pass, and the band has to be wide enough to not effect the phase of the servo.
                Reply  Sat May 7 09:40:40 2016, ericq, Update, LSC, Green PDH demod lowpass 
As I was looking at filter designs, it seemed difficult to get 40dB of supression at 2F with a bandpass without going to a pretty high order, which would
mean a fair number of lossy inductors.

I'll keep working on it. Maybe we don't need 40dB...
                   Reply  Sun May 8 08:39:21 2016, rana, Update, LSC, Green PDH demod lowpass 
Indeed. This is why the LSC PDs have a 2f notch in addition to the 1f resonance. In recent versions, we also put a 2f notch in the feedback of the preamp
which comes after the diode but before the mixer. The overall 1f to 2f ratio that we get is in the 50-60 dB region. I don't think we have to go that
far with this thing; having a double LC already seems like it should be pretty good, or we could have a single LC bandpass with a 2f notch all in one Pomona
Entry  Tue May 10 03:44:59 2016, ericq, Update, LSC, Relocked 2016-05-10_DARMcoherence.pdf
ALSX noise is solidly within past acceptable performance levels. The DRFPMI was locked on four out of six attempts. 

Some housekeeping was done:


PMC aligned
Static alignment voltages of X end PZT mirrors offloaded by turning mount screws
Rough comissioning
Entry  Tue May 24 17:55:17 2016, Varun, Update, Electronics, Using Altium 
Contacted Charles regarding use of Altium. Got to know that Altium is installed on cit40m iMac in Win7 on VirtualBox. Had to update
Virtualbox to get it working. Altium now works for sometime, but then fails, saying that it is unlicensed.
Entry  Wed May 25 02:54:09 2016, ericq, Update, General, Odds and ends 
WFS locking point seemed degraded; I hand aligned and reset the WFS offsets as usual.

ITMX oplev recentered. While doing so, I noticed an ETMX excursion rear its head for the first time in a long while :
Entry  Wed May 25 14:21:29 2016, Max Isi, Update, General, Summary page configuration 
I have modified the c1summary.ini and c1lsc.ini configuration files slightly to avoid overloading the system and remove the errors that were preventing
plots from being updated after certain time in the day.

The changes made are the following:
Entry  Fri May 27 02:52:53 2016, ericq, Update, LSC, Restoring high BW single arm control 
I've been futzing with the common mode servo, trying to engage the AO path with POY for high bandwidth control of a single arm lock. I'm able
to pull in the crossover and get a nice loop shape, but keep getting tripped up by the offset glitches from the CM board gain steps, so can't get much
more than a 1kHz UGF.
Entry  Fri May 27 11:54:22 2016, Varun, Update, General, Package delivery 
A package labelled 'UPS Ground' has arrived.

-Varun
Entry  Mon May 30 18:19:50 2016, Johannes, Update, CDS, ASS medm screen update 
I noticed that the TRY button in the ASS main screen was linking to LSC_TRX instead of LSC_TRY. Gautam fixed it.
Entry  Fri May 20 17:36:06 2016, gautam, Update, LSC, New stands for TransMon/Oplev QPDs 
As we realized during the EX table switch, the transmitted beam height from the arm is not exactly 4" relative to the endtable, it is more like
4.75" at the X-end (yet to be investigated at the Y-end). As a result, the present configuration involves the steering optics immediately before
the Oplev and TransMon QPDs sending the beam downwards at about 5 degrees. Although this isn't an extremely large angle, we would like to have things
    Reply  Wed Jun 1 09:06:38 2016, Steve, Update, LSC, New stands for TransMon/Oplev QPDs pdIb.PDFpdstand.pdf
Machined from I-beam 6061 T6 Aluminum 5" x 0.5 x 3.25




Quote:



As we realized during
Entry  Wed Jun 1 11:19:14 2016, Varun, Update, General, Update of work till now 
Completed:

Wrote and tested a code for AGC using cavity transmission signal and length error signal.

Wrote and tested a code for frequency shifting (downconversion) using mixing and LPF
Entry  Wed Jun 1 16:28:28 2016, ericq, Update, Electronics, Common board Op amp input offsets 
I used a Eurocard extension board to peek at the inputs and outputs of each of the gain-ladder AD829s on input B of the CM board in the +31dB configuration
with the input terminated. (i.e with the following stages active in this order: +16dB, +8dB, +4dB, +2dB, +1dB).

The voltages I observed imply that the +8dB stage has an input voltage offset of -2mV, whereas all the other positive gain stages show around
    Reply  Fri Jun 3 12:53:44 2016, ericq, Update, Electronics, Common board Op amp input offsets CMboard_offsets.png
I replaced some of the AD829s with other AD829s, but the offset situation didn't improve.

However, I figured that we don't really need the ~100MHZ bandwidth of the AD829, since the IMC loop limits us to a ~10kHz CARM bandwidth.
Also, since we don't routinely use IN2 for anything, I felt free to try something else. 
Entry  Fri Jun 3 13:05:18 2016, ericq, Update, CDS, CDS Notes 
Some CDS related things:


Keith Thorne has told us about a potential fix for our framebuilder woes. Jamie is going to be at the 40m next week to implement
this, which could interfere with normal interferometer operation - so plan accordingly. 
Entry  Tue Jun 7 17:21:13 2016, Aakash, Update, General, SURF 2016 
Hi!

I am Aakash Patil. I will be working at the 40m lab as a SURF student with Gautam Venugopalan on enclosures for seismometers to shield them from
thermal and magnetic fluctuations. This week I will be working on the development of hardware for four probe measurement along with a constant current
Entry  Mon Jun 6 16:41:36 2016, ericq, Update, CDS, FB upgrade work 
Barring objections, starting tomorrow morning, Jamie will be testing the new FB code. The IFO will not be available for other use while this is
ongoing.
    Reply  Tue Jun 7 11:12:47 2016, jamie, Update, CDS, DAQD UPGRADE WORK UNDERWAY 
I am re-starting work on the daqd upgrade again now.  Expect the daqd to be offline for most
of the day.  I will report progress.
       Reply  Tue Jun 7 20:49:50 2016, jamie, Update, CDS, DAQD work ongoing 
Summary: new daqd code running overnight test on fb1.  Stability issues persist.

The code is from Keith's "tests/advLigoRTS-40m" branch, which is a branch of the current trunk.  It's supposed to include
patches to fix the crashes when multiple frame types are written to disk at the same time.  However, the issue is not fixed:
          Reply  Wed Jun 8 08:34:55 2016, jamie, Update, CDS, DAQD work ongoing 
38 restarts overnight.  Problem definitely not fixed.  I'll be reverting back to old daqd and fb this morning.  Then regroup and evaluate
options.
Entry  Fri Jun 3 17:56:14 2016, Varun, Update, General, DAFI update 
Wrote and tested a phase vocoder, with two of its applications:

1) Time scaling: This enables change of time duration without affecting the pitch.

2) Frequency warping: This changes the pitch of the sound without affecting the time duration.
    Reply  Tue Jun 7 18:20:18 2016, Varun, Update, General, DAFI update 
Tried to implement AGC on FE. Had some trouble bringing the code into the correct form. It looks okay now. However, this agc code as well as idenntity
code (input = output) doesnt seem to build on the c1lsc FE. Have not tried too many debugging steps yet, will come and check the problem tomorrow. 

-Varun
       Reply  Wed Jun 8 16:12:38 2016, Varun, Update, General, DAFI update dafi.pngagcin.pdfagcout.pdf
Summary: I am implementing digital audio filtering on various interferometer
signals in order to listen to the processed audio which will help in characterizing and noise reduction in the interferometer. Following is
an implementation of an Automatic Gain control (AGC) block on an LSC input signal.
Entry  Thu Jun 9 09:57:06 2016, Aakash, Update, General, Seismometer Enclosure Development 

Me and Gautam yesterday opened the tilt-free seismometer enclosure to see if we could use the thermocouples and
other things
previously used by Megan. But we are planning to get new four-wire RTDs for our work.
For the next day or two, I will be trying to set up Acromag Busworks
terminal so that the data logging during
this enclosure development experiment becomes perfect and easy. Johannes has sent me the wiki page URL for the
Entry  Thu Jun 9 15:14:46 2016, jamie, Update, CDS, old fb restarted, test of new daqdon fb1 aborted for time being Jamie.jpg
I've restarted the old daqd on fb until I can figure out what's going on with the symmetricom driver on fb1.

Steve:  Jamie with hair.... long time ago
 
Entry  Thu Jun 9 18:54:40 2016, Aakash, Update, General, About Acromag | SURF 2016 
Today I tried to setup Acromag Busworks card. I was able to calibrate and test it over USB but I couldn't test it over ethernet. I'll utilize
a few hours tomorrow to test it over ethernet and see if I can make it work. I have also found a few RTDs which I want to use for temperature sensing via
four probe method. So, tomorrow I'll get these RTD details revived by Gautam and Steve.
Entry  Thu Jun 9 19:08:58 2016, Varun, Update, Electronics, Anti-Aliasing Filter update 32to65.jpg65to98.png
Eric gave me a psd plot of a signal which would be the input of a channel of the AA filter. the Nyquist freq. is about 32.8kHz.

Following are plots depicting the ratio of the aliased downconverted signal and the signal below 32.8 kHz. The first plot is for (to-be) aliased
signal frequencies from 32.8 to 65.5k, and the second plot is for (to-be) aliased signals from 65.5k to 98.3k. In case of the first plot, the 36kHz peak
Entry  Tue Jun 14 11:29:25 2016, Johannes, Summary, ASC, YArm OpLev Calibration CavityCoupling.pdf
In preparation for the armloss map I checked the calibration of the Y-Arm ITM and ETM OpLevs with the method originally described in https://nodus.ligo.caltech.edu:8081/40m/1247.
I was getting a little confused about the math though, so I attached a document at the end of this post in which I work it out for myself and posteriority.
Stepping through an introduced offset in the control filter for the corresponding degree of freedom, I recorded the change in transmitted power and the
Entry  Mon Jun 13 19:30:58 2016, Aakash, Update, General, EPICS Installation | SURF 2016 
About acquiring data: Initially I couldn't start with proper Acromag setup as the Raspberry pi had a faulty SD card slot. Then Gautam gave me a working
pi on which I tried to install EPICS. I spent quite a time today but couldn't setup acromag over ethernet.  But, it would be great if we have
a USB DAQ card. I have found a good one here 
    Reply  Tue Jun 14 11:52:08 2016, Johannes, Update, General, EPICS Installation | SURF 2016 
We generally want to keep the configuration of the 40m close to that of the LIGO sites, which is why we chose BusWorks, and it is also being established
as a standard in other labs on campus. Of course any suitable DAQ system can do the job, but to stay relevant we generally try to avoid patchwork solutions
when possible. Did you follow Aidan's instructions
Entry  Thu Jun 16 08:52:14 2016, Steve, Update, General, illuminators turned off 
PSL, BS, ITMY and ETMX the illuminators were left on over night.
Entry  Thu Jun 16 11:25:00 2016, Johannes, Update, LSC, Y-Arm round-trip loss measurement with ALS T_vs_steps.pdff_vs_steps.pdf
Using the ALS green beat and armlength feedback I mapped an IR resonance of the Y-Arm by stepping through a ramp of offset values.

First I optimized the IR alignment with the dither scripts while LSC kept the arm on resonance, and then transitioned the length control to ALS.
The beat frequency I obtained between the Y-arm green and the PSL was about 25 MHz. Then I applied a controlled ramp signal (stepping through small offset
Entry  Thu Jun 16 12:06:59 2016, ericq, Update, LSC, RF Amp installed at POY11 RF output IMG_3426.jpg
I have installed a ZFL-500LN on the RF output of POY11. This should reduce the effect of the CM board voltage offsets by increasing the size of the error
signal coming into the board. Checking with an oscilloscope at the LSC rack, the single arm PDH peak to peak voltage was something like 4mV,
now it is something like 80mV. 
Entry  Tue Jun 14 19:37:40 2016, jamie, Update, CDS, Overnight daqd test underway 
I'm running another overnight test with new daqd software on fb1.  The normal daqd process on fb has been shutdown, and the front ends are sending
their signals to fb1.

fb1 is running separate data concentrator (dc) and  frame writer (fw) processes, to see if this is a more stable configuration than the
    Reply  Wed Jun 15 09:52:02 2016, jamie, Update, CDS, Very encouraging results from overnight split daqd test 
Very encouraging results from the test last night.  The new configuration did not crash once overnight, and seemed to write
out full, second trend, and minute trend frames without issue
       Reply  Wed Jun 15 11:21:51 2016, jamie, Update, CDS, still work to do to transition to new configuration/code 
Just to be clear, there's still quite a bit of work to fully transition the 40m to this new system/configuration.  Once we determine a good
configuration we need to complete the install, and modify the setup to run the two binaries instead of just the one.  The data is also being written
to a raid on the new fb1, and we need to decide if we should use this new raid, or try to figure out how to move the old jetstor raid to the new fb1 machine.
          Reply  Thu Jun 16 16:11:11 2016, jamie, Update, CDS, upgrade aborted for now 
After poking at the new configuration more, it also started to show instability.  I couldn't figure out how to make test points or excitations
available in this configuration, and adding in the full set of test point channels, and trying to do simple things like plotting channels with dtt, the
frame writer (fw) would fall over, apparetnly unable to keep up with the broadcast from the dc.
Entry  Thu Jun 16 18:08:57 2016, Johannes, Update, PSL, Before the AOM installation IMG_20160615_154556392e.jpg
There was only one razor blade beam dump labeled for atmospheric use left, but that's all we need. Steve is working on restocking. I placed the modified
AOM mount on the PSL table near its intended location (near the AOM where it doesn't block any beams).

Things to keep in mind:
    Reply  Fri Jun 17 22:36:11 2016, Johannes, Update, PSL, AOM installation aom_new_mount.jpgaom_beam_split.jpgaom_dump_IR.jpg
Subham and I have placed the AOM back into the setup right in front of the PMC.

Steps undertaken:


The HEPA filters were turned off for some reason. They were turned back on, running at 100% while the enclosure was open.
Before
       Reply  Mon Jun 20 08:26:56 2016, Steve, Update, PSL, AOM pictures AOMinplace.jpginplaceAOM.jpgAOMin.png
Good job Johannes and Subham.

 
Entry  Mon Feb 15 12:28:03 2016, gautam, Update, General, Something has gone wrong - was there a power outage? Vac_15Feb2016.png
I came into the 40m a few minutes ago, and noticed the following (approximately in this order):


The striptool plots projected onto the wall were gone, even though the projector seemed to be working fine
There was no light
at all in the IFO 
There was an incessnt beeping noise coming from inside the lab.


To investigate further, I checked
    Reply  Mon Feb 15 13:09:33 2016, Koji, Update, General, Something has gone wrong - was there a power outage? 
Looks like that's the case. LIGO GC also sent an e-mail that there was a popwer glitch.
       Reply  Tue Feb 16 09:13:39 2016, Steve, Update, General, there was a power outage & EQ 20160215_power_outage.png
Pasadena reported the Sunday night event as a power transient caused by the trip of a power transmission line. This affected the entire city. Once the
loss was detected, the system automatically switches to an alternate source. It was about one second for the system to recover.

 
          Reply  Tue Feb 16 15:02:19 2016, ericq, Update, General, Power Glitch recovery 
Chiara reports an uptime of >195 days, so its UPS is working fine 

FB, megatron, optimus booted via front panel button.
             Reply  Tue Feb 16 23:42:22 2016, gautam, Update, General, Power Glitch recovery - arms recovered 
 I was able to realign the arms, lock them, and have run the dither align to maximize IR transmission - looks like things are back to normal now.
For the Y-end, I used the green beam initially to do some coarse alignment of the ITM and ETM, till I was able to see IR flashes in the control room monitors.
I then tweaked the alignment of the tip-tilts till I saw TEM00 flashes, and then enabled LSC. Once the arm was locked, I ran the dither align. I then tweaked
                Reply  Wed Feb 17 13:45:15 2016, ericq, Update, General, No monit on frontends 
daqd has indeed continued to be unstable. I found system times had drifted apart again... I think something weird happened in the booting of the frontends.
The monit processes were not running on any of the frontends. I ntpdate'd again,
and manually started monit on each fronted via sudo /etc/init.d/monit start. 
             Reply  Thu Feb 25 11:02:36 2016, Steve, Update, General, Power Glitch again powerGlitch.png



Quote:



Chiara reports an uptime
of >195 days, so its UPS is working fine 
                Reply  Thu Feb 25 11:32:04 2016, gautam, Update, General, Power Glitch again 
 




Quote:



10:15 power glitch today.
          Reply  Mon Feb 22 08:45:46 2016, Steve, Update, SUS, EQ 4.3 grabs ITMX-UL magnet EQ4.3LucerneV.pngITMX-UL.png
Local EQ4.3

kicks ITMX-UL magnet into stuck position.

Hopefully it is only sticking.
             Reply  Mon Feb 22 23:00:21 2016, ericq, Update, SUS, ITMX free, green is flashing 
Taking inspiration from J. Lewis et. al, ITMX has been freed. 
                Reply  Tue Feb 23 09:51:34 2016, Steve, Update, SUS, ITMX free ITMX_FREED.pngITMX_FREE.png
Good job Q! Give us more details please or  play Rachmaninoff Piano Concernto #2

Atm2,  EQ 3.5 and 4.1  

          confirming ITMX is really free
                   Reply  Tue Feb 23 17:46:09 2016, gautam, Update, SUS, EQ  SUS_Summary_23Feb.png
Looks like another EQ 4.8 took out all the watchdogs, I've restored them, everything looks alright and doesn't look like any magnets got stuck
this time... 
             Reply  Tue Apr 5 08:55:51 2016, Steve, Update, SUS, local EQ 3.1m eq3.1Valencia.png
Local earth quake 3.1 magnitude in Valencia, Ca did not trip our suspensions.

 
                Reply  Wed May 25 08:32:55 2016, Steve, Update, SUS, local EQ 3.5m 3.5Cucam.pnglocal3.5cucam.png
Local EQ 3.5 mag  at 2:28 UTC May 24, 2016 Rancho Cucamonga, Ca.....no damage

 
                   Reply  Fri Jun 3 14:24:13 2016, Steve, Update, SUS, local EQ 3.1 m eq3.1mMuscoyCa.png
Local EQ 3.1 mag at Jun 2, 2016 11:06:16 PM UTC, Muscoy CA........no damage

Our STS should seen this shake.

 
                      Reply  Fri Jun 10 09:52:51 2016, Steve, Update, SUS, EQ 5.2 mag Borego Spring 5.2mBoregoSpring.pngeqBSs.png
EQ  5.2 mag at Jun 10, 8:04 am UTC, Borego Spring, CA  ~150 mi away.........no obvoius damage, damping restored, MC is locking, arms are flashing

 
                         Reply  Mon Jun 20 09:36:10 2016, Steve, Update, SUS, EQ 3.1 m Big Bear Lake, CA eq3.1BigBearLakeCA.png
No suspention lost damping.

 
Entry  Wed Jun 8 13:50:39 2016, jamie, Configuration, CDS, Spectracom IRIG-B card installed on fb1 
[EDIT: corrected name of installed card]

We just installed a Spectracom TSyc-PCIe timing card on fb1.  The hope is that this will help with the GPS timeing syncronization
issues we've been seeing in the new daqd on fb1, hopefully elliminating some of the potential failure channels.
    Reply  Thu Jun 9 13:28:07 2016, jamie, Configuration, CDS, Spectracom IRIG-B card installed on fb1 
Something is wrong with the timing we're getting out of the symmetricom driver, associated with the new spectracom card.

controls@fb1:~/rtscore/tests/advLigoRTS-40m/src/drv/symmetricom 127$ lalapps_tconvert 
1149538884
       Reply  Fri Jun 10 12:09:01 2016, jamie, Configuration, CDS, IRIG-B debugging 
Looks like we might have a problem with the IRIG-B output of the GPS receiver.

Rolf came over this morning to help debug the strange symmetricom driver behavior on fb1 with the new Spectracom card.  We restarted the
machine againt and this time when we loaded the drive rit was clocking at a normal rate (second/second).  However, the overall GPS time was still
          Reply  Fri Jun 10 12:21:54 2016, jamie, Configuration, CDS, GPS receiver not resetting properly 
The GPS receiver (EndRun Technologies box in 1Y5? (rack closest to door)) seems to not coming back up properly after the reboot.  The front pannel
says that it's "LKD", but the "sync" LED is flashing instead of solid, and the time of year displayed on the front panel is showing
day 6.  The fb1 symmetricom driver and VME timing module are still both seeing day 299, though.  So something may definitely be screwy with the
             Reply  Mon Jun 20 11:11:20 2016, Steve, Configuration, CDS, GPS receiver not resetting properly 
I called https://www.endruntechnologies.com/pdf/USM3014-0000-000.pdf 
and they said it's very likely just needs a software update. They will email Jamie the details.




                Reply  Mon Jun 20 11:19:41 2016, jamie, Configuration, CDS, GPS receiver not resetting properly 



Quote:



I called https://www.endruntechnologies.com/pdf/USM3014-0000-000.pdf 
and they said it's very likely just needs a software update. They will email Jamie the details.
                   Reply  Mon Jun 20 14:03:04 2016, jamie, Configuration, CDS, EndRun GPS receiver upgraded, fixed GPSreceiverWorking.jpg
I just upgraded the EndRun Technologies Tempus LX GPS receiver timing unit, and it seems to have fixed all the problems.
 

Thanks to Steve for getting the info from EndRun.  There was indeed a bug in the firmware that was fixed with a firmware upgrade.
          Reply  Wed Jun 15 10:19:10 2016, Steve, Configuration, CDS, GPS antennas... debugging 6x
Visual inspection of rooftop GPS antennae:

The 2 GPS antennas are located on the north west corner of CES roof. Their condition looks well weathered. I'd
be surprised if they work. 
Entry  Tue Jun 21 11:26:42 2016, varun, Frogs, CDS, medm command not working 
"medm: command not found" error when run through command line both in
pianosa and rossa in both editing and execution modes. It however gets executed and edited through the sitemap button. Don't know the source of
the problem. Gautam did check the .bashrc file. aliases for SITEMAP and m40m are intact in the .bashrc file.
    Reply  Tue Jun 21 11:49:29 2016, ericq, Frogs, CDS, medm command not working 
The workstations' .bashrc is a symbolic link to /users/controls/.bashrc

In it, someone commented out the critical line:

#source /ligo/cdscfg/workstationrc.sh
Entry  Tue Jun 21 04:01:09 2016, ericq, Update, LSC, Y arm @ 30kHz UGF w/POY, AO inloop_outloop.pdfxarm.pdfyolg.png
With the newly amplified POY signal, locking the mode cleaner to the Y arm at ~30kHz bandwidth was quite straightforward. The offset jumps still happen,
and are visible in POY11_I_ERR, but are never big enough to cause much power degradation in TRY (except when turning on CM board boosts, but its still
not enough to lose lock). The script which accomplishes this is at scripts/YARM, and is in the svn. The MC2/AO crossover is at about 150Hz with 40deg margin.
    Reply  Wed Jun 22 08:40:42 2016, rana, Update, LSC, Y arm @ 30kHz UGF w/POY, AO 
Below 100 Hz, I suppose this means that the X arm is now limited by the quadrature sum of the X and Y arm seismic noise.
Entry  Mon Jun 20 16:33:09 2016, Varun, Update, Electronics, Anti-Aliasing Filter circuit schematic 8x
Summary: The aim is to design an analog anti-aliasing (AA) filter placed before the ADC, whose function is to filter out components
of the input spectrum that have frequencies higher than the Nyquist frequency. This needs to be done so that there is no contamination of aliased downconverted
high-frequency signals into the ADC output. I have put down and simulated a circuit to do this, based on the spectra of a few interferometer signals that
    Reply  Wed Jun 22 14:03:42 2016, Varun, Update, Electronics, Anti-Aliasing Filter circuit schematic io.pdfAA.JPGratios_v2.pdf
I found an anti-aliasing circuit on the 40m wiki. It consists of A differential LPF made using THS4131 low noise differential op-amp (one of the main
applications of which is preprocessing before the ADC), and a notch. I modified it to arrange for the desired bandwidth (about 8 kHz) and notch after the
Nyquist frequency at 36 kHz. I simulated it to get the attached results:
Entry  Thu Jun 23 17:24:32 2016, ericq, Update, General, Tweaks 
I spent some time this afternoon reviving some of my CESAR/ESCOBAR shenanigans on the Y arm. I found it neccesary to adjust a few things.


PMC realigned 
ETMY oplev centered
Y End green realigned
PSL/Y Green beat realigned


Afterwards,
ALSY noise levels were good. 
Entry  Sun Jun 26 15:27:28 2016, rana, Frogs, IOO, PMC /MC lopced 
Found PMC unlocked for many hours so I relocked it. IMC relocked by itself, but the input switch seems to be flickering to fast. Also the Keep Alive
bit is not flashing. 
Entry  Mon Jun 13 20:01:30 2016, varun, Update, CDS, DAFI GUI update C1DAF_OVERVIEW.pngC1DAF_INPUTS.pngC1DAF_LSC.pngMONITOR.png
Summary: I am implementing digital audio filtering on various interferometer signals in order to listen to the processed audio which
will help in characterizing and noise reduction in the interferometer. following is a summary of the gui i have made towards a general purpose DAF module
linked to the LSC. 
    Reply  Tue Jun 14 20:10:19 2016, varun, Update, CDS, DAFI GUI update C1DAF_OVERVIEW.pnginput_matrix.pngoutput_matrix.png
I have added Enable buttons for each of the DSP blocks, and labels for the matrix elements. The input matrix takes inputs from each of the 4 channels:
ADC1, ADC2, LSC and EXC, and routes them to the audio processing blocks (attachment 2). The output matrix (attachment
3) takes the outputs of the various DSP blocks and routes them to the output and then to the speakers. 
       Reply  Wed Jun 15 22:12:55 2016, varun, Update, CDS, DAFI update: stereo output IMG_20160615_145535907.jpgIMG_20160615_145413005_HDR.jpgIMG_20160616_101229499.jpgIMG_20160616_101157096.jpg
I wish to have stereo audio output for the DAF module. Hence, there needs to be a second output from the DAF. I added this second output to the model.
Following are the details:

FiBox: It consists of two analog inputs which are digitized and multiplexed and transmitted optically. (only 1 fiber is needed
          Reply  Wed Jun 22 10:15:45 2016, varun, Update, CDS, DAFI update: stereo output C1DAF_OVERVIEW.pngDAF_link_from_LSC.png
I have updated the DAFI with the following changes:

1) Separated both the channels of stereo output completely, as well as in the GUI.

2) Added text monitors for the inputs and outputs.
             Reply  Mon Jun 27 15:12:09 2016, varun, Update, CDS, DAFI update: stereo output IMG_20160627_151753247.jpg
Using an RC to BNC connector from the inner drawer, I have added a second output cable going from the output Fibox in the control room to the audio mixer.




Quote:



I have updated the DAFI
Entry  Wed Dec 23 16:15:47 2015, rana, Omnistructure, ALARM, fire alarm 
Fire alarm went off several minutes ago. Talked to security and they said there was no fire. It beeped twice again just now. No one has been working
on the IFO today.
    Reply  Mon Jun 27 15:26:03 2016, Steve, Omnistructure, ALARM, fire alarm test fireAlarmTest.png
The fire alarm came on around 15:05  for about 2-3 minutes. We all  left the lab and counted heads.  I called Paul Mackel x2646 (cell
626/ 890- 3259) at Fire Protection Services. He said that this alarm test was planned and we should of got an email notice. Perhaps I missed that notes.




Entry  Mon Jun 27 15:47:17 2016, Steve, Update, General, QPR clean room gloves 
I got some QPR Nitrile gloves. They are LIGO approved.White nitrile gloves are
naturally anti-static- 109 ohms

Their touch not as good as laytex  gloves but try to use them.
Entry  Tue Jun 28 16:09:41 2016, Praful, Update, General, 40m Summary Pages 
Set up gwsumm on optimus and generated summary pages from both L1 and C1 data. Still a few manual steps need to be taken during generation, not fully
automated due to some network/username issues. nds2 now working from optimus after restarting nds2 server.
Entry  Tue Jun 28 16:10:49 2016, Praful, Update, General, Bluebird Microphones 
Found 1 out of 2 bluebird microphones in the 40m.
Entry  Tue Jun 28 17:11:27 2016, Praful, Update, General, EM172 Microphones 
Found 60 EM172 microphones. Previous elog with details: 7777.
Entry  Tue Jun 28 20:43:23 2016, Koji, Summary, COC, First Contact cleaning practice 7x
Made a dry run of the in-situ cleaning for a 3inch optic.

Attachment 1: The Al dummy mass is clamped in the suspension cage.
Attachment 2: The front surface was painted. The nominal brush with the FC bottle was used.
Entry  Tue Jun 28 22:54:43 2016, Aakash, Update, General, Seismometer Enclosure Development | SURF 2016 plot1.pngplot2_corrected.png
The existing enclosure for seismometer at LIGO 40m lab is a cylindrical stainless steel can placed upside down over the seismometer. It has more empty
space between the seismometer and the internal surface of enclosure which is not desirable(I'll quantitatively elaborate this statement once my temperature
measuring setup is ready).
Entry  Wed Jun 29 00:09:36 2016, Aakash, Update, General, Things from past | SURF 2016 
I have taken out the heaters and temperature sensors from the enclosure which was made by Megan last summer. Soon I will test and configure those heaters.
Entry  Tue May 17 05:50:43 2016, Varun Kelkar, Update, General, SURF 2016 
Hello, I am Varun Kelkar. I will be working at the 40m lab as a SURF student this summer with Eric Quintero on Audio processing for real time control
system signals. This week I will mostly be working on implementing basic DSP C-code offline. Currently I am trying to write a code for noise whitening.

-Varun
    Reply  Wed May 18 17:42:52 2016, Varun, Update, General, SURF 2016 
Finished writing the code on whitening. I have to still test it. uploaded on github noise cancellation repo. @eric could you give me some data of noise
power spectral density for testing the code?

-Varun
       Reply  Fri May 20 00:06:19 2016, Varun, Update, General, SURF 2016 
I have written a basic version of AGC, and have done some tests with a data file. will do tests on whitening and agc today. Also, today I have to go
to the SSN office. Hence will be late.

 
          Reply  Mon May 23 17:47:51 2016, Varun, Update, General, SURF 2016 cav_tr-eps-converted-to.pdfcav_tr_out-eps-converted-to.pdferr-eps-converted-to.pdferr_out-eps-converted-to.pdf
Tested the AGC today with LSC cavity transmission signal and error signal. Not in real time still.

Key to attachments:

cav_tr-eps-converted-to.pdf: LSC cavity transmission signal input
             Reply  Wed May 25 14:29:31 2016, Varun, Update, General, SURF 2016 
Edited the AGC to include overlapping frames yesterday. forgot to put an elog on it!




Quote:



Tested the AGC today
                Reply  Thu May 26 18:10:48 2016, Varun, Update, General, SURF 2016 input.pngoutput.png
Wrote and tested a function for downconversion. It contains a mixer with a sinusoidal input for modulation with the desired frequency and a 2nd order
butterworth low pass filter to remove the higher frequency-shifted part of the modulated signal. I have tested this with input of 2kHz giving a good output
of 200 Hz on the speaker. Codes are uploaded on github, will update the real time document tomorrow.
    Reply  Wed May 25 11:51:40 2016, Steve, Update, safety, SURF 2016 safety 



Quote:



Hello, I am Varun Kelkar.
I will be working at the 40m lab as a SURF student this summer with Eric Quintero on Audio processing for real time control system signals. This week I
       Reply  Tue May 31 16:52:58 2016, Steve, Update, safety, NONO nono.jpg
Please do not place anything on the top of the cabinets that is not tied down. It will end up on our head in an earth quake.

 
       Reply  Wed Jun 8 10:20:14 2016, Steve, Update, safety, SURF 2016 safety 
Aakash Patil received 40m specific basic safety training.




Quote:



          Reply  Wed Jun 29 15:34:00 2016, Steve, Update, safety, SURF 2016 safety 
Praful Vasiceddy received 40m specific basic safety training.




Quote:



Aakash Patil received
Entry  Wed Jun 29 16:05:47 2016, ericq, Update, SUS, ETMX suspension readiness 
I've gone through the SOS suspension document (E970037) and some old elogs to get an idea of all the accesories
we need for the process of suspending, aside from the tower itself, which Steve has already put together. Gautam and I have laid our eyes upon most
of the critical pieces. Some other objects are unknown, and perhaps not strictly neccesary. 
Entry  Fri Jul 1 01:52:54 2016, Aakash, Update, General, Seismometer Enclosure Development | SURF 2016 DSC_0677.pngDSC_0678.png
I have transferred most of the temperature measurement stuff from the front area to seismometer at the end of Y-arm.  While arranging the components
I have taken all care that they will not interfere with existing system. Also, I have temporarily taken a monitor from the front area to the area near
same seismometer as I couldn't talk to Rpi via ssh. For next twelve hours, I am now recording temperature inside as well as outside the seismometer
Entry  Tue Jul 5 18:44:39 2016, Praful, Update, Computer Scripts / Programs, Working 40m Summary Pages 
After hardware errors prevented me from using optimus, I switched my generation of summary pages back to the clusters. A day's worth of data is still
too much to process using one computer, but I have successfully made summary pages for a timescales of a couple of hours on this site: https://ldas-jobs.ligo.caltech.edu/~praful.vasireddy/

 
Entry  Wed Jul 6 10:58:29 2016, Varun, Update, CDS, DAFI review 
The DAFI block was reviewed by Rana yesterday. The following changes/improvements were suggested: (Updated on 20th July 2016 with tasks
taat remain in red)

1) include all the various channels like PEM, LSC, ASC, SUS, SEI, etc. as the inputs. Currently the inputs are only the LSC.
Entry  Wed Jul 6 11:02:41 2016, Praful, Update, Computer Scripts / Programs, VMon Tab on Summary Pages 
I've added a new tab for VMon under the SUS parent tab. I'm still working out the scale and units, but let me know if you think this is a useful
addition. Here's a link to my summary page that has this tab: https://ldas-jobs.ligo.caltech.edu/~praful.vasireddy/1151193617-1151193917/sus/vmon/