40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 137 of 344  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  11993   Tue Feb 16 15:02:19 2016 ericqUpdateGeneralPower Glitch recoveryChiara reports an uptime of >195 days,
so its UPS is working fine 
  
  11995   Tue Feb 16 23:42:22 2016 gautamUpdateGeneralPower Glitch recovery - arms recovered I was able to realign the arms, lock
them, and have run the dither align to maximize
IR transmission - looks like things are back
  
  11997   Wed Feb 17 13:45:15 2016 ericqUpdateGeneralNo monit on frontendsdaqd has indeed continued to be unstable.
I found system times had drifted apart again...
I think something weird happened in the booting
  
  12010   Thu Feb 25 11:02:36 2016 SteveUpdateGeneralPower Glitch again


 powerGlitch.png 
  12011   Thu Feb 25 11:32:04 2016 gautamUpdateGeneralPower Glitch again 




  
  12043   Wed Mar 23 11:55:47 2016 SteveUpdateGeneral Smart UPS 2200 Battery ReplacedBatteries replaced in control room UPS
after 3 years from replaceUPSbattery.com

 
  
  12052   Mon Mar 28 22:16:44 2016 KojiUpdateGeneralNew WiFi routerI configured three more mini wifi extender.
They are ready to use.

We should add these to the host
  
  12076   Thu Apr 14 17:30:18 2016 ericqUpdateGeneralPLL measurement ongoingJust a heads up that some equipment is
hooked up at the PSL table for the repaired
AUX laser PLL measurement, I plan to continue
  
  12077   Fri Apr 15 03:02:44 2016 ericqUpdateGeneralNew AUX laser measurementsThe free running PSL+AUX beat frequency
noise spectrum has been measured via PLL.
AUX laser PZT PM and AM responses were measured
 aux_innolight_freqPSD.pdfaux_innolight_AMPM.pdfaux_innolight_data.zip 
  12078   Fri Apr 15 18:35:57 2016 gautamUpdateGeneralNew AUX laser measurementsI've performed the temperature sweep
of PSL vs Innolight 1W AUX laser.


I followed the procedure
 PSL_AUX_TEMP_SCAN.pdfPSL_AUX_TEMP_SCAN.mat 
  12080   Fri Apr 15 23:11:49 2016 gautamUpdateGeneralInnolight 1W moved to SP tableI
have moved the 1W Innolight + controller
from the PSL table to the SP table for beam
  
  12081   Mon Apr 18 00:29:00 2016 gautamUpdateGeneralBeam profiling + injection current scanSummary

I've finished up the remaining
characterization of the repaired 1W Innolight
 6x 
  12091   Wed Apr 27 09:05:10 2016 SteveUpdateGeneralAP viewport 
           
     Sad situation
 APg.jpgAP.jpgAPspiderWebs.jpg 
  12093   Wed Apr 27 14:06:31 2016 ranaSummaryGeneralmeeting notes
Gautam will get
help from Johannes and finish EX table by
Monday.
Steve
  
  12118   Tue May 17 05:50:43 2016 Varun KelkarUpdateGeneralSURF 2016Hello, I am Varun Kelkar. I will be working
at the 40m lab as a SURF student this summer
with Eric Quintero on Audio processing for
  
  12121   Wed May 18 17:42:52 2016 VarunUpdateGeneralSURF 2016Finished writing the code on whitening.
I have to still test it. uploaded on github
noise cancellation repo. @eric could you
  
  12123   Fri May 20 00:06:19 2016 VarunUpdateGeneralSURF 2016I have written a basic version of AGC,
and have done some tests with a data file.
will do tests on whitening and agc today.
  
  12127   Mon May 23 17:47:51 2016 VarunUpdateGeneralSURF 2016Tested the AGC today with LSC cavity transmission
signal and error signal. Not in real time
still.
 cav_tr-eps-converted-to.pdfcav_tr_out-eps-converted-to.pdferr-eps-converted-to.pdferr_out-eps-converted-to.pdf 
  12132   Wed May 25 02:54:09 2016 ericqUpdateGeneralOdds and endsWFS locking point seemed degraded; I hand
aligned and reset the WFS offsets as usual.

ITMX oplev recentered. While doing
  
  12135   Wed May 25 14:21:29 2016 Max IsiUpdateGeneralSummary page configurationI have modified the c1summary.ini and c1lsc.ini
configuration files slightly to avoid overloading
the system and remove the errors that were
  
  12136   Wed May 25 14:29:31 2016 VarunUpdateGeneralSURF 2016Edited the AGC to include overlapping frames
yesterday. forgot to put an elog on it!

  
  12137   Thu May 26 18:10:48 2016 VarunUpdateGeneralSURF 2016Wrote and tested a function for downconversion.
It contains a mixer with a sinusoidal input
for modulation with the desired frequency
 input.pngoutput.png 
  12139   Fri May 27 11:54:22 2016 VarunUpdateGeneralPackage deliveryA package labelled 'UPS Ground'
has arrived.

-Varun
  
  12143   Wed Jun 1 11:19:14 2016 VarunUpdateGeneralUpdate of work till nowCompleted:

Wrote and tested a code for AGC
using cavity transmission signal and length
  
  12150   Fri Jun 3 17:56:14 2016 VarunUpdateGeneralDAFI updateWrote and tested a phase vocoder, with
two of its applications:

1) Time scaling: This enables change
  
  12153   Tue Jun 7 17:21:13 2016 AakashUpdateGeneralSURF 2016Hi!

I am Aakash Patil. I will be working
at the 40m lab as a SURF student with Gautam
  
  12154   Tue Jun 7 18:20:18 2016 VarunUpdateGeneralDAFI updateTried to implement AGC on FE. Had some
trouble bringing the code into the correct
form. It looks okay now. However, this agc
  
  12159   Wed Jun 8 16:12:38 2016 VarunUpdateGeneralDAFI updateSummary: I am implementing
digital audio filtering on various interferometer
 dafi.pngagcin.pdfagcout.pdf 
  12160   Thu Jun 9 09:57:06 2016 AakashUpdateGeneralSeismometer Enclosure Development
Me and Gautam yesterday
opened the tilt-free seismometer enclosure
to see if we could use the thermocouples
  
  12163   Thu Jun 9 18:54:40 2016 AakashUpdateGeneralAbout Acromag | SURF 2016Today I tried to setup Acromag Busworks
card. I was able to calibrate and test it
over USB but I couldn't test it over
  
  12172   Mon Jun 13 19:30:58 2016 AakashUpdateGeneralEPICS Installation | SURF 2016About acquiring data: Initially I couldn't
start with proper Acromag setup as the Raspberry
pi had a faulty SD card slot. Then Gautam
  
  12176   Tue Jun 14 11:52:08 2016 JohannesUpdateGeneralEPICS Installation | SURF 2016We generally want to keep the configuration
of the 40m close to that of the LIGO sites,
which is why we chose BusWorks, and it is
  
  12186   Thu Jun 16 08:52:14 2016 SteveUpdateGeneralilluminators turned offPSL, BS, ITMY and ETMX the illuminators
were left on over night.
  
  12213   Thu Jun 23 17:24:32 2016 ericqUpdateGeneralTweaksI spent some time this afternoon reviving
some of my CESAR/ESCOBAR shenanigans on the
Y arm. I found it neccesary to adjust a few
  
  12217   Mon Jun 27 15:47:17 2016 SteveUpdateGeneralQPR clean room glovesI got some
QPR Nitrile gloves. They are LIGO approved.White
nitrile gloves are naturally anti-static-
  
  12220   Tue Jun 28 16:09:41 2016 PrafulUpdateGeneral40m Summary PagesSet up gwsumm on optimus and generated
summary pages from both L1 and C1 data. Still
a few manual steps need to be taken during
  
  12221   Tue Jun 28 16:10:49 2016 PrafulUpdateGeneralBluebird MicrophonesFound 1 out of 2 bluebird microphones in
the 40m.
  
  12222   Tue Jun 28 17:11:27 2016 PrafulUpdateGeneralEM172 MicrophonesFound 60 EM172 microphones. Previous elog
with details: 7777.
  
  12224   Tue Jun 28 22:54:43 2016 AakashUpdateGeneralSeismometer Enclosure Development | SURF 2016The existing enclosure for seismometer
at LIGO 40m lab is a cylindrical stainless
steel can placed upside down over the seismometer.
 plot1.pngplot2_corrected.png 
  12225   Wed Jun 29 00:09:36 2016 AakashUpdateGeneralThings from past | SURF 2016I have taken out the heaters and temperature
sensors from the enclosure which was made
by Megan last summer. Soon I will test and
  
  12233   Thu Jun 30 16:11:57 2016 ericqUpdateGeneralVent PrepI have updated
the vent
prep checklist on the wiki. Gautam and
  
  12235   Thu Jun 30 21:24:36 2016 ericqUpdateGeneralVent PrepSteve has ordered some teflon parts to
take the place of the metal parts in his
acetone-soaking jig. They should arrive tomorrow. 
  
  12236   Fri Jul 1 01:52:54 2016 AakashUpdateGeneralSeismometer Enclosure Development | SURF 2016I have transferred most of the temperature
measurement stuff from the front area to
seismometer at the end of Y-arm.  While
 DSC_0677.pngDSC_0678.png 
  12240   Mon Jul 4 10:30:37 2016 ericqUpdateGeneralPreliminary vent plansHere are some plans / rough procedures
for this week's vent. It is unlikely
that I have though of everything, but this
  
  12243   Tue Jul 5 17:14:02 2016 ericqUpdateGeneralVent progressRough summary of today's progress:


IMC locked, reasonably
aligned. (Only have MC2 trans reference,
 noOsemSide.JPGOSEMside.JPG 
  12245   Tue Jul 5 19:10:41 2016 ranaUpdateGeneralVent progressI'd suggest clamping and moving it
to the flow bench so you can inspect with
a bright light. Then remove the wire and
 jumpEvent20151105.png 
  12246   Tue Jul 5 21:51:35 2016 ericqUpdateGeneralVent progressOne glitch was seen to occur without a
change in the output voltage monitors in ELOG
  
  12247   Tue Jul 5 23:38:42 2016 gautamUpdateGeneralVent progress - ETMX SUS Coil driver electronics investigationWith Koji's help, I've hacked together
an arrangement that will allow us to monitor
the output of the coil driver to the UL coil. 
 image.jpeg 
  12249   Wed Jul 6 09:34:26 2016 SteveUpdateGeneralPRM sensing voltage LRYesterday Q noticed that PRM_sensor_LR
was 0.098V  This actually went to ~
zero on 7-3
 PRM_LR.png 
  12253   Wed Jul 6 16:40:09 2016 AakashUpdateGeneralSeismometer Enclosure Development | SURF 2016I am using AD592CNZ temperature
transducer ICs for measuring temperature
inside as well as outside the enclosure.
 AD592CNZ_avg.pngAD592CNZ_diff.png 
ELOG V3.1.3-