40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 135 of 344  Not logged in ELOG logo
    Reply  Wed May 4 11:48:01 2011, Suresh, Update, IOO, MC Locking not working 
Entry  Wed May 4 12:07:48 2011, Suresh, Update, RF System, REFL55 installed on the AP table 
Entry  Wed May 4 13:45:56 2011, kiwamu, Update, LSC, locking last night 
    Reply  Wed May 4 13:57:04 2011, kiwamu, Update, SUS, mechanical resonances updated 
    Reply  Wed May 4 15:22:39 2011, kiwamu, Update, , Re: Intermittent MC3 UL PD signal 
    Reply  Wed May 4 15:39:32 2011, Suresh, Update, RF System, RF Source Harmonics RF_Harmonics_Sheet1.pdf
Entry  Thu May 5 00:08:59 2011, Jenne, Update, LSC, (Almost) New Screens for RFPDs 
Entry  Thu May 5 10:19:22 2011, steve, Update, PSL, PSL-FSS_RMTEMP is back P1070637.JPG
Entry  Thu May 5 13:12:06 2011, Jenne, Update, PSL, Temperature drift, trying to shield PMC with foil PSL_Temp_drift_5May2011.pngP5050092small.jpg
Entry  Thu May 5 13:13:32 2011, Jenne, Update, LSC, New RFPD screens are in 
Entry  Thu May 5 13:14:15 2011, kiwamu, Update, LSC, chans file for LSC 
Entry  Thu May 5 13:55:08 2011, kiwamu, Update, LSC, MI locking : calibration of BS and ITMs actuators MICH_OL.png
    Reply  Thu May 5 14:40:14 2011, Koji, Update, LSC, MI locking : calibration of BS and ITMs actuators 
    Reply  Thu May 5 14:50:30 2011, Jenne, Update, LSC, chans file for LSC 
    Reply  Thu May 5 15:05:06 2011, steve, Update, PSL, PSL-FSS_RMTEMP is not back rtnfxd.jpg
    Reply  Thu May 5 15:28:23 2011, kiwamu, Update, LSC, Re: MI locking : calibration of BS and ITMs actuators 
    Reply  Thu May 5 16:11:22 2011, Jamie, Update, LSC, chans file for LSC 
Entry  Thu May 5 20:47:41 2011, Koji, Update, PSL, PMC aligned 
Entry  Fri May 6 06:36:18 2011, Suresh, Update, RF System, PD DC signals at each port connected 
Entry  Fri May 6 15:59:40 2011, steve, Update, VAC, TP3 fore pump replaced 
Entry  Fri May 6 17:11:55 2011, steve, Update, SUS, SRM-oplev cable  
Entry  Sat May 7 02:52:53 2011, kiwamu, Update, LSC, TRY photo diode installed 
Entry  Sat May 7 10:59:11 2011, Suresh, Update, RF System, RF Source filters changed RF_Source_Schematic.pngRF_Source.jpg
Entry  Sat May 7 18:08:54 2011, valera, Update, IOO, MC beam spot centering script mcditherlines2.pdf
Entry  Sun May 8 16:32:52 2011, valera, Update, IOO, MC beam spot centering 
    Reply  Sun May 8 17:29:01 2011, rana, Update, IOO, MC beam spot centering 
    Reply  Sun May 8 22:59:40 2011, rana, Update, PSL, PSL reference cavity temperature box modifications 
Entry  Mon May 9 09:37:51 2011, valera, Update, PSL, PSL and MC trends pslmcdrift2.pdf
Entry  Mon May 9 12:33:40 2011, kiwamu, Update, LSC, C1:LSC-TRIG_MTRX : wrong matrix size 
    Reply  Mon May 9 13:14:48 2011, josephb, Update, LSC, C1:LSC-TRIG_MTRX : wrong matrix size 
Entry  Mon May 9 15:21:36 2011, josephb, Update, PSL, Fixed channel names for PSL QPDs, fixed saturation, changed signs 
Entry  Mon May 9 17:23:25 2011, Suresh, Update, RF System, RF Cables near LSC Rack 
    Reply  Mon May 9 18:54:29 2011, kiwamu, Update, LSC, triggerd locking logic : screen prepared trigger_medm.png
    Reply  Mon May 9 20:30:20 2011, rana, Update, PSL, PSL reference cavity temperature box modifications Untitled.png
Entry  Tue May 10 00:31:28 2011, kiwamu, Update, ASC, IFO alignment plan 
Entry  Tue May 10 00:44:52 2011, valera, Update, IOO, MC2 centering mc2centering.pdf
Entry  Tue May 10 01:39:41 2011, Suresh, Update, RF System, RF source troubles 
    Reply  Tue May 10 09:05:49 2011, Koji, Update, General, aLIGO BBPD / Green PD investigation PD_response.pdf
    Reply  Tue May 10 10:06:23 2011, josephb, Update, PSL, Fixed channel names for PSL QPDs, fixed saturation, changed signs 
Entry  Tue May 10 11:14:44 2011, steve, Update, PSL, PSL-QPD_ANG qpd optimized qpdangl.jpg
Entry  Tue May 10 16:42:49 2011, josephb, Update, CDS, New upconversion model (c1uct) 
Entry  Tue May 10 16:45:19 2011, josephb, Update, CDS, c1ass now receiving AS55I from c1lsc 
    Reply  Tue May 10 20:57:05 2011, rana, Update, PSL, PSL reference cavity temperature box modifications : after 24 hours still OK Untitled.png
Entry  Tue May 10 22:56:17 2011, kiwamu, Update, SUS, f2p filters installed on ETMY f2p_etmy.png
Entry  Tue May 10 23:14:01 2011, kiwamu, Update, SUS, ETMX_OPLEV : He-Ne laser dead ? 
Entry  Wed May 11 00:23:21 2011, kiwamu, Update, ASC, Y arm and beam pointing alignment 
    Reply  Wed May 11 11:05:45 2011, steve, Update, SUS, ETMX_OPLEV : He-Ne replaced P1070672.JPG
    Reply  Wed May 11 11:24:59 2011, steve, Update, SUS, SRM-oplev qpd is back srm-prm_oplevs.jpg
    Reply  Wed May 11 11:44:52 2011, kiwamu, Update, SUS, f2p filters installed on ITMY f2p_itmy.png
Entry  Wed May 11 13:54:32 2011, steve, Update, LSC, LSC power supplies P1070679.JPG
ELOG V3.1.3-