Tue Feb 9 17:18:45 2010, josephb, Summary, Computers, Locking Y arm successful with fully replaced front-end for ITMY
|
Tue Feb 9 10:10:58 2010, Alberto, Update, ABSL, back to analog
|
Mon Feb 8 14:13:03 2010, Alberto, Update, ABSL, PLL Characterization  
|
Tue Feb 9 09:07:06 2010, Alberto, Update, ABSL, PLL Characterization
|
Mon Feb 8 17:00:36 2010, josephb, Update, Computers, Megatron ETMY model updated (tst.mdl)
|
Mon Feb 8 14:56:17 2010, Alberto, Update, ABSL, Suddenly a much better alignment of PRC
|
Mon Feb 8 15:01:46 2010, rob, Update, ABSL, Suddenly a much better alignment of PRC
|
Mon Feb 8 15:41:51 2010, Alberto, Update, ABSL, Suddenly a much better alignment of PRC
|
Fri Jan 15 12:04:26 2010, Sanjit, mevans, Update, Adaptive Filtering, Canceling noise again!
|
Tue Jan 26 19:51:44 2010, Sanjit, rana, Update, Adaptive Filtering, OAF details  
|
Mon Feb 1 18:31:00 2010, Sanjit, Update, Adaptive Filtering, OAF details
|
Mon Feb 1 21:51:12 2010, Sanjit, Update, Adaptive Filtering, OAF details
|
Fri Feb 5 00:52:55 2010, Sanjit, Update, Adaptive Filtering, OAF at 0.1-1.0 Hz 
|
Fri Feb 5 01:04:58 2010, Sanjit, Update, Adaptive Filtering, OAF at > 5Hz
|
Sat Feb 6 00:10:08 2010, Sanjit, Update, Adaptive Filtering, OAF at > 5Hz
|
Fri Feb 5 14:31:46 2010, Jenne, Update, SUS, 2 SOS towers assembled
|
Fri Feb 5 11:01:49 2010, steve, Configuration, VAC, slow pumpdown valve
|
Thu Feb 4 12:29:04 2010, josephb, Update, Computers, Martian IP switch over notes
|
Wed Feb 3 10:46:12 2010, Alberto, Update, elog, elog restarted
|
Thu Feb 4 00:59:52 2010, rana, Update, elog, elog restarted
|
Wed Feb 3 11:13:15 2010, steve, Configuration, General, planed power outage for Sat. Feb 20
|
Tue Feb 2 22:39:12 2010, Jenne, Update, PSL, IFO isn't playing nice tonight
|
Wed Feb 3 01:17:19 2010, Koji, Update, PSL, IFO isn't playing nice tonight
|
Wed Feb 3 09:01:42 2010, rob, Update, lore, IFO isn't playing nice tonight
|
Wed Feb 3 07:57:01 2010, steve, Update, PSL, PMC transmission is low
|
Tue Feb 2 18:15:47 2010, Alberto, Update, elog, Elog restarted it
|
Tue Feb 2 16:10:09 2010, steve, Update, PEM, construction progress next door    
|
Tue Feb 2 15:30:03 2010, Alberto, Frogs, Treasure, Wild Oats
|
Tue Feb 2 13:14:09 2010, Koji, HowTo, IOO, Anatomy of New Focus Resonant EOM
|
Tue Feb 2 10:38:30 2010, josephb, Update, Computers, Megatron BO test
|
Mon Feb 1 18:33:10 2010, steve, Update, MOPA, Ve half the lazer! 
|
Fri Jan 29 12:06:58 2010, Alberto, Update, ABSL, Measurement running today at lunch time
|
Fri Jan 29 13:14:49 2010, Alberto, Update, ABSL, Measurement running today at lunch time
|
Thu Jan 28 09:17:32 2010, Alberto, Update, LSC, 166 Modulation turned off
|
Thu Jan 28 09:14:51 2010, Alberto, Configuration, Computers, c1iscey, c1iscex, c1lsc, c1asc rebooted
|
Wed Jan 27 11:02:30 2010, Alberto, Update, ABSL, PRC Cavity Length 
|
Tue Jan 26 20:18:32 2010, rana, Configuration, ALARM, op540m: alarms and BLRMS and StripTool restored
|
Mon Jan 25 16:30:37 2010, Alberto, Update, ABSL, 166 MHz sideband turned off
|
Mon Jan 25 16:46:33 2010, Alberto, Update, ABSL, 166 MHz sideband turned off
|
Tue Jan 26 03:28:56 2010, rana, Update, ABSL, 166 MHz sideband turned off
|
Mon Jan 25 11:42:24 2010, josephb, Update, Computers, Megatron and BO board
|
Fri Jan 22 02:54:06 2010, Alberto, Update, ABSL, Overnight measurement
|
Fri Jan 22 14:40:49 2010, Alberto, Update, ABSL, Overnight measurement
|
Fri Jan 22 12:33:37 2010, josephb, alex, Update, Computers, Modified CDS_PARTS for Binary output
|
Thu Jan 21 17:23:30 2010, josephb,alex,koji, HowTo, Computers, RCG code fixes
|
Thu Jan 21 15:16:16 2010, josephb, koji, Summary, Computers, Megatron used to lock Y arm
|
Thu Jan 21 11:08:30 2010, kiwamu, steve, Update, VAC, Dry Pump replacement
|
Wed Jan 20 20:11:56 2010, Alberto, Update, ABSL, Some preliminary results from measuring PRC's transmissivity for an amplitude modulated beam
|
Thu Jan 21 10:31:13 2010, Koji, Update, ABSL, Some preliminary results from measuring PRC's transmissivity for an amplitude modulated beam
|
Thu Jan 21 10:09:27 2010, Koji, Summary, IOO, Photos of the optical tables
|
Mon Jan 18 23:44:19 2010, kiwamu, Update, Electronics, triple resonant circuit for EOM 
|
Tue Jan 19 00:10:44 2010, rana, Update, Electronics, triple resonant circuit for EOM
|
Tue Jan 19 02:40:38 2010, Koji, Update, Electronics, triple resonant circuit for EOM
|
Tue Jan 19 03:04:14 2010, Koji, Update, Electronics, triple resonant circuit for EOM
|
Tue Jan 19 03:27:47 2010, kiwamu, Update, Electronics, Re: triple resonant circuit for EOM
|
Tue Jan 19 23:26:07 2010, kiwamu, Update, Electronics, Re:Re: triple resonant circuit for EOM  
|
Tue Jan 19 16:21:18 2010, Alberto, Update, ABSL, Watchdogs not working and then fixed
|
Tue Jan 19 12:54:39 2010, Alberto, Update, ABSL, Measurement in progress
|
Sun Jan 17 19:18:55 2010, Alberto, Update, Computers, Boot fest to restart the computer and c1iscey not responding.
|
Tue Jan 19 10:30:29 2010, josephb, Update, Computers, Boot fest to restart the computer and c1iscey not responding.
|
Tue Jan 19 02:39:57 2010, kiwamu, Update, Electronics, design complete --- triple resonant circuit for EOM --- 
|
Tue Jan 19 03:20:28 2010, Koji, Update, Electronics, design complete --- triple resonant circuit for EOM ---
|
Mon Jan 18 18:34:01 2010, Alberto, Update, ABSL, Measurement in progress
|
Mon Jan 18 20:58:40 2010, Alberto, Update, ABSL, Measurement in progress
|
Mon Jan 18 09:44:36 2010, Alberto, Bob, Omnistructure, Environment, No rain water infiltrations so far
|
Sun Jan 17 05:22:42 2010, rana, Configuration, Computers, ELOG script change
|
Fri Jan 15 18:53:05 2010, josephb,peter,koji, Update, Computers, Attempted locking with Megatron replacing ETMY front end
|
Fri Jan 15 11:21:05 2010, josephb, Update, Computers, Megatron and tst model for ETMY
|
Thu Jan 14 11:44:06 2010, josephb, Summary, Computers, Memory locations for TST model for ITMY
|
Wed Jan 13 12:03:00 2010, Alberto, Update, ABSL, Measurement now running. Please be careful
|
Wed Jan 13 12:01:06 2010, Alberto, Update, Computers, c1dcuepics, c1lsc rebooted this morning
|
Sun Jan 10 16:05:51 2010, Alberto, Omnistructure, Environment, Lab Thermostats Temperature Lowered by 1 deg F
|
Mon Jan 11 10:01:06 2010, Alberto, Omnistructure, Environment, Lab Thermostats Temperature Lowered by 1 deg F
|
Tue Jan 12 14:28:01 2010, steve, Summary, Environment, lab temp of 7 years
|
Tue Jan 12 13:24:50 2010, Haixing, Update, SUS, Quadrant Magnetic Levitation
|
Tue Jan 12 09:37:05 2010, Alberto, Update, ABSL, IFO available
|
Sun Jan 10 23:22:56 2010, Jenne, Summary, General, Scattering Measurements of 35W Beam Dumps 
|
Tue Jan 12 09:14:52 2010, steve, Summary, General, Scattering Measurements of 35W Beam Dumps
|
|