Sat Mar 27 16:23:10 2010, Koji, Update, SUS, another SRM sidemagnet glued
|
Mon Mar 29 18:50:14 2010, Koji, Update, SUS, PRM sidemagnet glued
|
Mon Mar 29 18:41:34 2010, Koji, Configuration, SUS, Started to build TTs
|
Sun Mar 28 20:00:17 2010, rana, Update, Cameras, GigE camera no work from screen
|
Mon Mar 29 10:40:59 2010, josephb, Update, Cameras, GigE camera no work from screen
|
Sun Mar 28 20:05:33 2010, rana, Summary, PSL, FSS Work from Sunday: AOM/VCO level set wrong
|
Sun Mar 28 20:51:31 2010, rana, Summary, PSL, FSS Work from Sunday: Cavity Suspension is Ridiculously Undamped!
|
Sun Mar 28 23:17:46 2010, rana, Summary, PSL, FSS Work from Sunday: noise spec
|
Sun Mar 28 23:47:47 2010, rana, Summary, PSL, FSS Work from Sunday: Open Loop Gain 
|
Mon Mar 29 01:11:33 2010, rana, Summary, PSL, FSS Work from Sunday: RF Out Spectrum   
|
Mon Mar 29 02:07:50 2010, Koji, Summary, PSL, FSS Work from Sunday: Open Loop Gain
|
Mon Mar 29 01:45:26 2010, daisuke, Configuration, General, Periscope version B for green laser ...  
|
Fri Mar 26 10:48:35 2010, steve, Update, SAFETY, safety glasses measured 
|
Thu Mar 25 17:32:42 2010, Alberto, Update, 40m Upgrading, REFL55 Upgraded 
|
Thu Mar 18 10:46:51 2010, Koji, Update, ABSL, PLL reconstructed
|
Thu Mar 18 12:27:56 2010, Alberto, Update, ABSL, PLL reconstructed
|
Thu Mar 18 13:40:35 2010, Koji, Update, ABSL, PLL reconstructed
|
Thu Mar 18 21:42:26 2010, Koji, Update, ABSL, PLL reconstructed
|
Mon Mar 22 22:11:26 2010, Mott, Update, ABSL, PLL reconstructed
|
Mon Mar 22 23:37:32 2010, Mott, Update, ABSL, PLL reconstructed 
|
Tue Mar 23 18:44:46 2010, Mott, Update, ABSL, PLL reconstructed
|
Wed Mar 24 03:58:18 2010, kiwamu, matt, koji, Update, Green Locking, leave PLL locked
|
Wed Mar 24 04:22:51 2010, kiwamu, matt, Update, Green Locking, two NPRO PLL
|
Wed Mar 24 14:52:02 2010, Alberto, Update, Green Locking, two NPRO PLL
|
Wed Mar 24 15:59:59 2010, kiwamu, matt, Update, Green Locking, leave PLL locked
|
Thu Mar 25 17:29:48 2010, kiwamu, mott, Update, Green Locking, PLL two NPROs
|
Tue Mar 23 22:46:43 2010, Alberto, Update, 40m Upgrading, REFL11 upgraded
|
Wed Mar 24 14:57:21 2010, Alberto, Update, 40m Upgrading, REFL11 upgraded
|
Wed Mar 24 12:40:25 2010, daisuke, Configuration, General, Periscope for green laser delivery from the BSC to PSL table  
|
Wed Mar 24 12:38:17 2010, Hartmut, Configuration, Green Locking, Broadband PD for green PLL 
|
Tue Mar 23 00:31:51 2010, Koji, Update, IOO, MC realigned 
|
Tue Mar 23 09:37:36 2010, steve, Update, IOO, vac envelope has to be sealed as antproof for overnight 
|
Tue Mar 23 09:55:20 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight
|
Wed Mar 24 02:06:24 2010, Koji, Update, IOO, vac envelope has to be sealed as antproof for overnight
|
Tue Mar 23 15:38:26 2010, Alberto, Update, elog, elog just restarted
|
Tue Mar 23 10:11:13 2010, steve, Update, PEM, small air cond unit failed yesterday
|
Mon Mar 22 16:57:45 2010, josephb,daisuke, alex, Configuration, Computers, Megatron test points working again
|
Mon Mar 22 11:37:09 2010, steve, Update, PEM, jackhammering
|
Mon Mar 22 02:03:57 2010, rana, Summary, Electronics, UPDH Box #17: Ready
|
Mon Mar 22 10:07:30 2010, Koji, Summary, Electronics, UPDH Box #17: Ready
|
Sun Mar 21 20:08:20 2010, kiwamu, rana, Update, PSL, EOM wasit size 
|
Sun Mar 21 21:02:39 2010, Koji, Update, PSL, EOM waist size
|
Thu Mar 18 15:33:17 2010, kiwamu, Summary, Electronics, advantege of our triple resonant EOM
|
Thu Mar 18 19:00:04 2010, Koji, Summary, Electronics, advantege of our triple resonant EOM
|
Sat Mar 20 18:34:19 2010, kiwamu, Summary, Electronics, RE:advantege of our triple resonant EOM
|
Tue Mar 16 09:37:30 2010, steve, Update, SUS, eq 4.4 seen by oplevs and osems  
|
Tue Mar 16 04:22:02 2010, Jenne, Update, Environment, Earthquake, Mag 4.4
|
Tue Mar 16 05:10:39 2010, koji, Update, Environment, Earthquake, Mag 4.4
|
Mon Mar 15 09:43:47 2010, steve, Update, PEM, more sandblasting today
|
Sun Mar 7 07:01:21 2010, rana, Update, WienerFiltering, Guralp Huddle Test software
|
Sat Mar 13 22:16:03 2010, rana, Update, WienerFiltering, Guralp Huddle Test software
|
Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18
|
Fri Mar 12 13:52:18 2010, Zach, Update, elog, elog restarted
|
Thu Mar 11 17:51:04 2010, Koji, Update, SUS, Recent status of SOSs
|
Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off
|
Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal
|
Thu Mar 11 15:24:51 2010, steve, Metaphysics, Environment, IFO was well protected
|
Tue Mar 9 09:32:31 2010, Koji, Summary, General, Wideband measurement of Fast PZT response
|
Tue Mar 9 09:04:20 2010, steve, Update, PEM, keep vacuum chamber closed
|
Tue Mar 2 23:11:43 2010, Koji, Update, SUS, ITMX hung
|
Wed Mar 3 02:57:29 2010, Jenne, Update, SUS, ITMX hung
|
Fri Mar 5 11:21:18 2010, steve, Update, SUS, used OSEMs are magnetic
|
Fri Mar 5 18:04:56 2010, rana, Update, SUS, used OSEMs are magnetic
|
Thu Mar 4 19:53:56 2010, Alberto, Update, 40m Upgrading, 11MHz PD designed adjusted for diode's resistance; 55 MHz RFPD designed 6x
|
Thu Mar 4 22:07:21 2010, rana, Update, 40m Upgrading, 11MHz PD not yet designed
|
Wed Mar 3 18:32:25 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics 
|
Thu Mar 4 08:43:35 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics
|
Thu Mar 4 02:25:14 2010, Jenne, Update, COC, Further details on the magnet story, and SRM guiderod glued
|
Tue Mar 2 12:20:54 2010, kiwamu, Update, PSL, stray beam
|
Sun Feb 28 23:47:52 2010, rana, Update, Computers, rosalba
|
Mon Mar 1 22:38:12 2010, rana, Update, Computers, RC sensitivity to RIN
|
Mon Mar 1 08:49:37 2010, steve, Bureaucracy, SAFETY, safety audit
|
Sun Feb 28 16:45:05 2010, rana, Summary, General, Power ON Recovery
|
Fri Feb 26 11:48:36 2010, Koji, Update, General, MC incident beam shift
|
Fri Feb 26 01:00:07 2010, Jenne, Update, COC, Suspension Progress
|
Thu Feb 25 19:59:50 2010, Koji, Configuration, SUS, ITMX OSEMs
|
Thu Feb 25 15:49:05 2010, Alberto, AoG, CDS, New IO Chassis for the new CDS
|
Thu Feb 25 11:21:06 2010, Koji, Update, General, Tanks opened
|
Wed Feb 24 12:08:31 2010, Koji, Update, Computers, RFM goes red -> recovered by the nuclear option
|
Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope
|
Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed
|
Tue Feb 23 19:00:45 2010, kiwamu, Configuration, VAC, vent finished
|
Tue Feb 23 16:42:02 2010, rana, Configuration, Computer Scripts / Programs, SVN restarted on NODUS
|
Thu Feb 18 15:39:16 2010, Koji and Steve, Configuration, VAC, valve condition: ALL OFF
|
Tue Feb 23 16:20:44 2010, steve, Configuration, VAC, outgassing + leak
|
Tue Feb 23 14:56:24 2010, steve, Update, General, ETMX optical table mass
|
Tue Feb 23 06:47:57 2010, Koji, Update, General, IFO situations / low power MC lock 
|
Mon Feb 22 21:07:26 2010, Jenne, Update, COC, Magnets glued to ITMX
|
|