Entry  Tue Mar 23 15:38:26 2010, Alberto, Update, elog, elog just restarted  
Entry  Tue Mar 23 10:11:13 2010, steve, Update, PEM, small air cond unit failed yesterday 20datm.jpg
Entry  Mon Mar 22 16:57:45 2010, josephb,daisuke, alex, Configuration, Computers, Megatron test points working again 
Entry  Mon Mar 22 11:37:09 2010, steve, Update, PEM, jackhammering jackhammering2.jpg
Entry  Mon Mar 22 02:03:57 2010, rana, Summary, Electronics, UPDH Box #17: Ready 
    Reply  Mon Mar 22 10:07:30 2010, Koji, Summary, Electronics, UPDH Box #17: Ready 15V_power_supply.pdf
Entry  Sun Mar 21 20:08:20 2010, kiwamu, rana, Update, PSL, EOM wasit size waist.pngwaist.py.zip
    Reply  Sun Mar 21 21:02:39 2010, Koji, Update, PSL, EOM waist size 
Entry  Thu Mar 18 15:33:17 2010, kiwamu, Summary, Electronics, advantege of our triple resonant EOM electrode.png
    Reply  Thu Mar 18 19:00:04 2010, Koji, Summary, Electronics, advantege of our triple resonant EOM 
       Reply  Sat Mar 20 18:34:19 2010, kiwamu, Summary, Electronics, RE:advantege of our triple resonant EOM 
Entry  Tue Mar 16 09:37:30 2010, steve, Update, SUS, eq 4.4 seen by oplevs and osems opleveq4.4.jpgeq4.4.jpgopleveq4.4d3.jpg
Entry  Tue Mar 16 04:22:02 2010, Jenne, Update, Environment, Earthquake, Mag 4.4  EQ_16Mar2010.png
    Reply  Tue Mar 16 05:10:39 2010, koji, Update, Environment, Earthquake, Mag 4.4  100316_MC_SUS.png
Entry  Mon Mar 15 09:43:47 2010, steve, Update, PEM, more sandblasting today 
Entry  Sun Mar 7 07:01:21 2010, rana, Update, WienerFiltering, Guralp Huddle Test software huddlez.png
    Reply  Sat Mar 13 22:16:03 2010, rana, Update, WienerFiltering, Guralp Huddle Test software guralpznoise.png
Entry  Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18 bg-d18_20100312scan.png
Entry  Fri Mar 12 13:52:18 2010, Zach, Update, elog, elog restarted 
Entry  Thu Mar 11 17:51:04 2010, Koji, Update, SUS, Recent status of SOSs 
Entry  Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off ventd3.jpg
    Reply  Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal 
    Reply  Thu Mar 11 15:24:51 2010, steve, Metaphysics, Environment, IFO was well protected 
Entry  Tue Mar 9 09:32:31 2010, Koji, Summary, General, Wideband measurement of Fast PZT response PZT_response.png
Entry  Tue Mar 9 09:04:20 2010, steve, Update, PEM, keep vacuum chamber closed sandblasting.jpg
Entry  Tue Mar 2 23:11:43 2010, Koji, Update, SUS, ITMX hung 
    Reply  Wed Mar 3 02:57:29 2010, Jenne, Update, SUS, ITMX hung 
    Reply  Fri Mar 5 11:21:18 2010, steve, Update, SUS, used OSEMs are magnetic 
       Reply  Fri Mar 5 18:04:56 2010, rana, Update, SUS, used OSEMs are magnetic 
Entry  Thu Mar 4 19:53:56 2010, Alberto, Update, 40m Upgrading, 11MHz PD designed adjusted for diode's resistance; 55 MHz RFPD designed 6x
    Reply  Thu Mar 4 22:07:21 2010, rana, Update, 40m Upgrading, 11MHz PD not yet designed 
Entry  Wed Mar 3 18:32:25 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics rfpd11_v2_TF.pdfrfpd11_v2_Noise.pdf
    Reply  Thu Mar 4 08:43:35 2010, Alberto, Update, 40m Upgrading, 11 MHz RFPD elctronics rfpd11_v2.fil
Entry  Thu Mar 4 02:25:14 2010, Jenne, Update, COC, Further details on the magnet story, and SRM guiderod glued 
Entry  Tue Mar 2 12:20:54 2010, kiwamu, Update, PSL, stray beam 
Entry  Sun Feb 28 23:47:52 2010, rana, Update, Computers, rosalba 
    Reply  Mon Mar 1 22:38:12 2010, rana, Update, Computers, RC sensitivity to RIN Untitled.png
Entry  Mon Mar 1 08:49:37 2010, steve, Bureaucracy, SAFETY, safety audit 
Entry  Sun Feb 28 16:45:05 2010, rana, Summary, General, Power ON Recovery 
Entry  Fri Feb 26 11:48:36 2010, Koji, Update, General, MC incident beam shift 
Entry  Fri Feb 26 01:00:07 2010, Jenne, Update, COC, Suspension Progress 
Entry  Thu Feb 25 19:59:50 2010, Koji, Configuration, SUS, ITMX OSEMs osem_config_ITMX.png
Entry  Thu Feb 25 15:49:05 2010, Alberto, AoG, CDS, New IO Chassis for the new CDS 
Entry  Thu Feb 25 11:21:06 2010, Koji, Update, General, Tanks opened 
Entry  Wed Feb 24 12:08:31 2010, Koji, Update, Computers, RFM goes red -> recovered by the nuclear option 
Entry  Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope 
    Reply  Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed vent2010feb23.jpg
Entry  Tue Feb 23 19:00:45 2010, kiwamu, Configuration, VAC, vent finished 
Entry  Tue Feb 23 16:42:02 2010, rana, Configuration, Computer Scripts / Programs, SVN restarted on NODUS 
Entry  Thu Feb 18 15:39:16 2010, Koji and Steve, Configuration, VAC, valve condition: ALL OFF 
    Reply  Tue Feb 23 16:20:44 2010, steve, Configuration, VAC, outgassing + leak outgleak.jpg
Entry  Tue Feb 23 14:56:24 2010, steve, Update, General, ETMX optical table mass etmxmass.jpg
Entry  Tue Feb 23 06:47:57 2010, Koji, Update, General, IFO situations / low power MC lock MC_incident.pngMC_REFL.png
Entry  Mon Feb 22 21:07:26 2010, Jenne, Update, COC, Magnets glued to ITMX 
Entry  Mon Feb 22 13:08:27 2010, josephb, Update, Computers, Minor tweaks to c1omc 
Entry  Mon Feb 22 12:48:31 2010, josephb, alex, koji, Update, Computers, FE machines now coming up 
Entry  Mon Feb 22 11:46:55 2010, josephb, Update, Computers, fb40m 
Entry  Fri Feb 19 13:28:44 2010, Koji, Update, General, Prep for Power Supply Stop  screen_shot.png
    Reply  Sun Feb 21 17:44:35 2010, rana, Update, General, Prep for Power Supply Stop  
       Reply  Mon Feb 22 07:25:58 2010, rana, Update, General, Prep for Power Supply Stop  
          Reply  Mon Feb 22 09:45:34 2010, josephb, Update, General, Prep for Power Supply Stop  
             Reply  Mon Feb 22 11:42:48 2010, Koji, Update, General, Prep for Power Supply Stop  
Entry  Mon Feb 22 11:38:05 2010, joe, jenne and steve, Configuration, VAC, vacuum is back to normal 
Entry  Mon Feb 22 10:25:37 2010, Jenne, Update, COC, ITMY standoff and guiderod epoxied 
Entry  Fri Feb 19 16:40:43 2010, kiwamu, Update, Green Locking, rearrange the optics on the end table DSC_1202.JPGDSC_1207.JPG
Entry  Fri Feb 19 15:29:14 2010, kiwamu, Update, COC, Gluing dumbbells and magnets 
Entry  Fri Feb 19 10:18:19 2010, Jenne, Update, VAC, The P1 vac pressure is almost to 3mTorr VacPressureAlmostShutoffLaser_19Feb2010.png
Entry  Fri Feb 19 02:38:32 2010, Koji, Configuration, oplevs, Intsant green oplevs for ITMs shooting from the ends 
Entry  Fri Feb 19 00:31:17 2010, Jenne, Update, COC, New ITMX guiderods glued 
Entry  Thu Feb 18 10:10:43 2010, steve, Configuration, General, 480 V AC power turned off 