40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 12 of 357  Not logged in ELOG logo
Entry  Fri Oct 16 12:40:59 2009, Koji, Configuration, General, Some questions 
Entry  Fri Oct 16 16:08:00 2009, rob, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm 
    Reply  Fri Oct 16 18:46:36 2009, rana, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm Untitled.png
Entry  Sun Oct 18 15:46:08 2009, Alberto, Configuration, General, Antique, unused QPD removed from the AS table  
    Reply  Sun Oct 18 16:09:34 2009, rana, Configuration, ASC, loop opened on PZT2 YAW at 3:40 pm a.png
Entry  Sun Oct 18 19:55:45 2009, rana, Configuration, Electronics, IP POS is back: ND filter gone, new resistors in IMG_0068.JPGIMG_0072.JPG
    Reply  Sun Oct 18 22:06:15 2009, rana, Configuration, Electronics, IP POS is back: ND filter gone, new resistors in Untitled.png
Entry  Tue Oct 20 16:35:24 2009, rob, Configuration, LSC, 33MHz Mod depth 
Entry  Sun Oct 25 14:29:45 2009, haixing, kiwamu, Configuration, General, SR785 spectrum analyzer 
Entry  Tue Oct 27 17:58:25 2009, Jenne, Configuration, PEM, Unknown PEM channels in the PEM-ADCU? 
Entry  Mon Nov 2 13:34:36 2009, kiwamu, Configuration, PSL, removed multiply resonant EOM 
Entry  Tue Nov 3 12:47:01 2009, Koji, Configuration, CDS, 1Y9 Rack configuration update 
Entry  Thu Nov 5 16:41:14 2009, josephb, Configuration, Computers, Megatron's personal network 
Entry  Fri Nov 6 00:23:34 2009, Alberto, Configuration, Computers, Elog just rebooted 
Entry  Fri Nov 6 17:04:01 2009, josephb, Configuration, Computers, RFM and Megatron 
Entry  Mon Nov 9 11:11:19 2009, Alberto, Configuration, LSC, MC2 Watchdogs tripped 
Entry  Mon Nov 9 13:17:07 2009, Alberto, Configuration, ABSL, NPRO on 
Entry  Tue Nov 10 17:01:33 2009, Alberto, Configuration, IOO, c1ioovme and c1iool0 rebooted  
Entry  Thu Nov 12 17:24:29 2009, Koji, Joe, Peter, Configuration, CDS, ETMY CDS test started 
Entry  Fri Nov 13 09:54:14 2009, josephb, Configuration, Computers, Megatron switched to tcsh 
Entry  Mon Nov 16 15:58:02 2009, josephb, Configuration, General, Added Gige camera to AP table, added some screens 
Entry  Mon Nov 16 17:24:28 2009, josephb, Configuration, Computers, Camera medm functionality improved 
Entry  Tue Nov 17 11:09:43 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
    Reply  Tue Nov 17 13:39:37 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
    Reply  Tue Nov 17 15:23:06 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
    Reply  Tue Nov 17 21:10:30 2009, Koji, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
    Reply  Wed Nov 18 11:27:33 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
    Reply  Wed Nov 18 12:33:30 2009, Koji, josephb, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC Untitled.png
    Reply  Wed Nov 18 16:24:25 2009, pete, Configuration, SUS, ETMY suspension conencted to megatron ADC/DAC 
Entry  Thu Nov 19 11:33:15 2009, josephb, Configuration, Computers, Megatron  
Entry  Thu Nov 19 16:04:48 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
    Reply  Thu Nov 19 18:49:55 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
Entry  Fri Nov 20 11:01:58 2009, josephb, alex, Configuration, Computers, Where to find RFM offsets 
Entry  Fri Nov 20 11:14:22 2009, josephb, alex, Configuration, Computers, test points working on megatron and we may have filters with switch outputs built in 
Entry  Fri Nov 20 16:18:56 2009, rob, Configuration, SUS, watchdog rampdown 
Entry  Tue Nov 24 18:24:54 2009, Sanjit, Configuration, Adaptive Filtering, ASS channels added to framebuilder 
Entry  Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
Entry  Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired 
    Reply  Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
Entry  Fri Dec 11 08:35:04 2009, steve, Configuration, VAC, pumpdown has started wiping.jpg
    Reply  Fri Dec 11 09:30:09 2009, Koji, Configuration, LSC, 166 LO Disconnected 
    Reply  Fri Dec 11 11:42:26 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
    Reply  Fri Dec 11 13:18:17 2009, Alberto, Configuration, VAC, pumpdown has started 
    Reply  Fri Dec 11 14:12:32 2009, rana, Configuration, LSC, 166 LO Disconnected 
    Reply  Fri Dec 11 14:19:22 2009, Koji, Configuration, VAC, pumpdown has started 
    Reply  Fri Dec 11 15:21:40 2009, steve, Configuration, VAC, pumpdown#67 is completed pd7h.jpgoplevpd8h.jpg
    Reply  Fri Dec 11 19:51:13 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
Entry  Sat Dec 19 14:33:25 2009, Koji, Configuration, Computers, PDFlib lite / gnuplot 4.2.6 on Rosalba/Allegra 
Entry  Tue Dec 22 18:42:40 2009, Sanjit, Koji, Configuration, Adaptive Filtering, Readded DAQ channels to active list 
Entry  Wed Dec 30 20:33:36 2009, rana, alberto, Configuration, Cameras, ITMY & MC2 Camera work DSC_1064.JPGDSC_1065.JPGDSC_1066.JPG
ELOG V3.1.3-