Entry  Fri Feb 19 10:18:19 2010, Jenne, Update, VAC, The P1 vac pressure is almost to 3mTorr VacPressureAlmostShutoffLaser_19Feb2010.png
Entry  Fri Feb 19 02:38:32 2010, Koji, Configuration, oplevs, Intsant green oplevs for ITMs shooting from the ends 
Entry  Fri Feb 19 00:31:17 2010, Jenne, Update, COC, New ITMX guiderods glued 
Entry  Thu Feb 18 10:10:43 2010, steve, Configuration, General, 480 V AC power turned off 
Entry  Wed Feb 17 19:36:05 2010, Koji, Update, COC, Arm visibility 
Entry  Wed Feb 17 12:45:19 2010, josephb, Update, Computers, Updated Megatron and its firewall 
Entry  Fri Feb 12 18:58:46 2010, kiwamu, Update, Green Locking, take some optics away from the ETM end table DSC_1164.JPGDSC_1172.JPG
    Reply  Tue Feb 16 09:51:22 2010, Alberto, Update, Green Locking, take some optics away from the ETM end table 
       Reply  Tue Feb 16 11:12:51 2010, kiwamu, Update, Green Locking, Re:take some optics away from the ETM end table 
          Reply  Tue Feb 16 16:24:30 2010, kiwamu, Update, Green Locking, Re:Re:take some optics away from the ETM end table 
Entry  Tue Feb 16 10:01:16 2010, Alberto, Configuration, LSC, Arms and PRC not locking 
    Reply  Tue Feb 16 14:10:06 2010, josephb, rob, koji, Configuration, LSC, Arms and PRC not locking 
       Reply  Tue Feb 16 15:25:00 2010, Alberto, Configuration, LSC, Arms and PRC not locking shock.jpg
Entry  Sat Feb 13 18:58:31 2010, josephb, alex, Update, Computers, fb40m testpoints fixed 
Entry  Fri Feb 12 13:15:41 2010, kiwamu, Update, Electronics, triple resonant EOM --- liniaryity test linearity_edit.png
    Reply  Sat Feb 13 13:21:53 2010, Koji, Update, Electronics, triple resonant EOM --- liniaryity test 
Entry  Fri Feb 12 15:59:16 2010, josephb, Update, Computers, Testpoints not working 
Entry  Fri Feb 12 14:19:28 2010, rana, steve, HowTo, lore, International Fax 
Entry  Fri Feb 12 13:56:16 2010, josephb, Update, Computers, Finishing touches on IP switch over 
Entry  Fri Feb 12 11:56:02 2010, josephb, Update, Computers, Nodus slow ssh fixed 
Entry  Thu Feb 11 18:33:54 2010, josephb, alex, Update, Computers, Status of the IP change over 
    Reply  Thu Feb 11 19:20:44 2010, rana, Update, Computers, Status of the IP change over 
       Reply  Fri Feb 12 11:44:11 2010, josephb, Update, Computers, Status of the IP change over 
Entry  Thu Feb 11 15:53:59 2010, steve, Configuration, VAC, PSL output shutter is closed 
    Reply  Thu Feb 11 18:53:57 2010, steve, Configuration, VAC, VAC NORMAL is back 
Entry  Wed Feb 10 17:28:02 2010, kiwamu, Update, Electronics, triple resonant EOM ---- preliminary result mod_depth.png
    Reply  Wed Feb 10 23:15:37 2010, Koji, Update, Electronics, triple resonant EOM ---- preliminary result 
       Reply  Thu Feb 11 16:52:53 2010, kiwamu, Update, Electronics, triple resonant EOM ---- preliminary result 
Entry  Wed Feb 10 23:44:56 2010, Koji, Summary, COC, Phase Map Analysis SRM01_HR_RoC_rad_15mm.pngSRM01_HR_RoC_scan.png
Entry  Wed Feb 10 16:27:47 2010, steve, Configuration, General, IFO beam heights 
Entry  Tue Feb 9 17:51:48 2010, Jenne, Summary, IOO, Input Mode Matching Telescope design is complete 
Entry  Tue Feb 9 17:18:45 2010, josephb, Summary, Computers, Locking Y arm successful with fully replaced front-end for ITMY 
Entry  Tue Feb 9 10:10:58 2010, Alberto, Update, ABSL, back to analog 
Entry  Mon Feb 8 14:13:03 2010, Alberto, Update, ABSL, PLL Characterization 2010-02-08_Old_PDH_Box_Filter_TF_gain_knob_0_Boost_OFF.png2010-02-08_PLL_OLG_gain_knob_0_Boost_OFF.png2010-02-08_PLL_Noise_Budget.png
    Reply  Tue Feb 9 09:07:06 2010, Alberto, Update, ABSL, PLL Characterization 2010-02-08_PRCtransmissivity_EntireFreqRange_VsFit.png
Entry  Mon Feb 8 17:00:36 2010, josephb, Update, Computers, Megatron ETMY model updated (tst.mdl) 
Entry  Mon Feb 8 14:56:17 2010, Alberto, Update, ABSL, Suddenly a much better alignment of PRC 
    Reply  Mon Feb 8 15:01:46 2010, rob, Update, ABSL, Suddenly a much better alignment of PRC 
       Reply  Mon Feb 8 15:41:51 2010, Alberto, Update, ABSL, Suddenly a much better alignment of PRC 
Entry  Fri Jan 15 12:04:26 2010, Sanjit, mevans, Update, Adaptive Filtering, Canceling noise again! OAF_15JAN2010.png
    Reply  Tue Jan 26 19:51:44 2010, Sanjit, rana, Update, Adaptive Filtering, OAF details C1ASS_TOP.pngC1SUS_SRM_XYCOM1.pngUntitled.png
       Reply  Mon Feb 1 18:31:00 2010, Sanjit, Update, Adaptive Filtering, OAF details 
          Reply  Mon Feb 1 21:51:12 2010, Sanjit, Update, Adaptive Filtering, OAF details 
       Reply  Fri Feb 5 00:52:55 2010, Sanjit, Update, Adaptive Filtering, OAF at 0.1-1.0 Hz OAF_04FEB2010_noOAF.pngOAF_04FEB2010.png
          Reply  Fri Feb 5 01:04:58 2010, Sanjit, Update, Adaptive Filtering, OAF at > 5Hz OAF_04FEB2010_highFreq.png
             Reply  Sat Feb 6 00:10:08 2010, Sanjit, Update, Adaptive Filtering, OAF at > 5Hz 
Entry  Fri Feb 5 14:31:46 2010, Jenne, Update, SUS, 2 SOS towers assembled DSC_1156.JPG
Entry  Fri Feb 5 11:01:49 2010, steve, Configuration, VAC, slow pumpdown valve  slow.JPG
Entry  Thu Feb 4 12:29:04 2010, josephb, Update, Computers, Martian IP switch over notes 
Entry  Wed Feb 3 10:46:12 2010, Alberto, Update, elog, elog restarted 
    Reply  Thu Feb 4 00:59:52 2010, rana, Update, elog, elog restarted 
Entry  Wed Feb 3 11:13:15 2010, steve, Configuration, General, planed power outage for Sat. Feb 20 
Entry  Tue Feb 2 22:39:12 2010, Jenne, Update, PSL, IFO isn't playing nice tonight 
    Reply  Wed Feb 3 01:17:19 2010, Koji, Update, PSL, IFO isn't playing nice tonight 
       Reply  Wed Feb 3 09:01:42 2010, rob, Update, lore, IFO isn't playing nice tonight 
Entry  Wed Feb 3 07:57:01 2010, steve, Update, PSL, PMC transmission is low pmct40d.jpg
Entry  Tue Feb 2 18:15:47 2010, Alberto, Update, elog, Elog restarted it 
Entry  Tue Feb 2 16:10:09 2010, steve, Update, PEM, construction progress next door pem120d.jpg02022010.JPG02022010b.JPG02022010c.JPGicewall.JPG
Entry  Tue Feb 2 15:30:03 2010, Alberto, Frogs, Treasure, Wild Oats 
Entry  Tue Feb 2 13:14:09 2010, Koji, HowTo, IOO, Anatomy of New Focus Resonant EOM 
Entry  Tue Feb 2 10:38:30 2010, josephb, Update, Computers, Megatron BO test 
Entry  Mon Feb 1 18:33:10 2010, steve, Update, MOPA, Ve half the lazer! inno2w.JPGinno2Wb.JPG
Entry  Fri Jan 29 12:06:58 2010, Alberto, Update, ABSL, Measurement running today at lunch time 
    Reply  Fri Jan 29 13:14:49 2010, Alberto, Update, ABSL, Measurement running today at lunch time 
Entry  Thu Jan 28 09:17:32 2010, Alberto, Update, LSC, 166 Modulation turned off 
Entry  Thu Jan 28 09:14:51 2010, Alberto, Configuration, Computers, c1iscey, c1iscex, c1lsc, c1asc rebooted 
Entry  Wed Jan 27 11:02:30 2010, Alberto, Update, ABSL, PRC Cavity Length 2010-01-21_PRCtransmissivityVsFit.png2010-01-21_PRCtransmissivity_EntireFreqRange_VsFit.png
Entry  Tue Jan 26 20:18:32 2010, rana, Configuration, ALARM, op540m: alarms and BLRMS and StripTool restored 
Entry  Mon Jan 25 16:30:37 2010, Alberto, Update, ABSL, 166 MHz sideband turned off 
    Reply  Mon Jan 25 16:46:33 2010, Alberto, Update, ABSL, 166 MHz sideband turned off 
       Reply  Tue Jan 26 03:28:56 2010, rana, Update, ABSL, 166 MHz sideband turned off 
Entry  Mon Jan 25 11:42:24 2010, josephb, Update, Computers, Megatron and BO board 
Entry  Fri Jan 22 02:54:06 2010, Alberto, Update, ABSL, Overnight measurement 
    Reply  Fri Jan 22 14:40:49 2010, Alberto, Update, ABSL, Overnight measurement 2010-01-21_PRCtransmissivityVsModel.png
Entry  Fri Jan 22 12:33:37 2010, josephb, alex, Update, Computers, Modified CDS_PARTS for Binary output 
Entry  Thu Jan 21 17:23:30 2010, josephb,alex,koji, HowTo, Computers, RCG code fixes CDO32.png
Entry  Thu Jan 21 15:16:16 2010, josephb, koji, Summary, Computers, Megatron used to lock Y arm 