40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 128 of 344  Not logged in ELOG logo
    Reply  Mon Jan 14 19:56:48 2013, Manasa, Update, , TT 
 
 [Manasa, Jenne]
The motion of the magnets (~1.5mm estimated by looking at the magnets moving) correspond to ~2deg. tilt of the mirror. This would mean almost 1.5m
    Reply  Tue Jan 15 20:00:42 2013, Manasa, Update, Alignment, Adjustment of active TTs and input alignment 
 
Just for reference! The changes made to the TT matrix in order to fix the polarity problem:
The old matrix values are mentioned in elog!
Entry  Thu Jan 17 19:33:53 2013, Manasa, Update, Alignment, PRM oplev 
 We had to work on redesigning the oplev layout in BSC when I found that the positions of the mirrors were clipping IPPOS and the green beam while
updating the CAD layout.  
To avoid any clipping, the prm oplev beam is steered into the vacuum by an oplev mirror and out of vacuum through 3 steering mirrors. The table
    Reply  Wed Jan 23 18:16:11 2013, Manasa, Update, General, Laseroptik mirror - SN6 sn6_trans.png
 I repeated the transmittance measurements of LaserOptik SN6 @1064nm.
Transmittance for s-polarization 
0 deg - 0.524
    Reply  Wed Jan 23 22:02:25 2013, Manasa, Update, General, Laseroptik mirror - SN6 


    
        
            Quote:
        
        
            

           Got confused (even after I talked with Manasa).
    Reply  Thu Jan 24 15:16:50 2013, Manasa, Update, General, Laseroptik mirror - SN6 sn6_trans1.png
I repeated the transmittance measurements of Laseroptik SN6 at 1064nm. The rotation stage could only resolve 2 deg rotation (We should consider buying
a better rotation stage).
s-polarization
    Reply  Mon Jan 28 19:07:45 2013, Manasa, Update, General, SN6 Laseroptik mirror - Tranmittance measurements sn6_trans0128.pngtrans_layout.png
I repeated the measurements using NPRO instead of Crystalaser. I am attaching optical layouts for these measurements for future reference. 
Lesson learnt : Do not use Crystalaser for transmission measurements and always separate the transmitted main beam from other beams that result
from the wedged surface of the mirror. 
Entry  Mon Jan 28 19:15:14 2013, Manasa, Update, Scattering, Scattering setup 
 [Jan, Manasa]
We are trying to get some scattering measurements in the Y-arm cavity. We have removed one of  the viewport windows window
covers of ETMY chamber and have installed cameras on a ring that clamps to the window. The window along with the ring attachment is covered with aluminium
    Reply  Tue Jan 29 15:16:18 2013, Manasa, Frogs, General, trial run ErgoMatesFeatures.jpgbooties.jpg
 
 I would like to suggest a trial run on these....Ergomates and the cleanboot!
    Reply  Wed Jan 30 11:18:31 2013, Manasa, Update, Scattering, Scattering setup 


    
        
            Quote:
        
        
            

            [Jan, Manasa]
    Reply  Wed Jan 30 16:24:25 2013, Manasa, Frogs, General, trial run 


    
        
            Quote:
        
        
            

            
    Reply  Thu Jan 31 11:53:31 2013, Manasa, Update, Scattering, Scattering setup 


    
        
            
            Since we are in air, we came up with a plan B. The plan is to temporarily install a mirror in the ITMY
chamber to steer the beam from the laser pointer (installed on the POY table) through ITMY to the pickoff mirror at the ETMY end. This way, we can install
    Reply  Wed Feb 6 20:00:06 2013, Manasa, Update, Electronics, BNC cables piled up at every corner 109393779.png
 [Yuta, Steve, Manasa]
There are cables piled up around the access connector area which have been victims of stampedes all the time. I have heard these cables were somehow
Den's responsibility. 
    Reply  Wed Feb 6 20:03:50 2013, Manasa, Update, Locking, PRC cavity gains 


    
        
            Quote:
        
        
            

             Getting closer, but need to use the real measured AR reflectivity values, not the 1500 ppm guess. These should be measured at
Entry  Wed Feb 6 20:19:52 2013, Manasa, Update, Optics, G&H and LaserOptik mirrors 
[Koji, Manasa]
We measured the wedge angle of the G&H and LaserOptik mirrors at the OMC lab using an autocollimator and rotation stage.
The wedge angles:
Entry  Thu Feb 7 09:03:54 2013, Manasa, Update, General, Store optics in respective cabinets 

@Yuta
The ITMX table has been left open since yesterday. I am disconnecting your oscilloscope and
closing the table.
    Reply  Thu Feb 7 14:10:25 2013, Manasa, Update, Optics, LaserOptik - AR Reflectivity - Bad data SN6_R.pngSN6_R.png
Reflectivity of AR surface of LaserOptik (SN6)
 
    Reply  Fri Feb 8 21:14:52 2013, Manasa, Update, Optics, G&H - AR Reflectivity  pr2.png27_1044419003.bmp
 Hours of struggle and still no data 
I tried to measure the AR reflectivity and the loss due to flipping of G&H mirrors
 With almost no wedge angle, separating the AR reflected beam from the HR reflected beam seems to need more tricks.
    Reply  Fri Feb 8 23:04:40 2013, Manasa, Update, Optics, G&H - AR Reflectivity  


    
        
            Quote:
        
        
            

           D = 2 d Tan(\phi) Cos(\theta), where \phi = ArcSin(Sin(\theta) * n)
    Reply  Mon Feb 11 19:55:47 2013, Manasa, Update, Optics, G&H - AR Reflectivity  
 
I adjusted the focal length of the focusing lens and reduced the beam size enough to mask with the razor blade edge while looking at the camera
and then making measurements using PD. 
    Reply  Tue Feb 12 23:22:14 2013, Manasa, Update, Scattering, Scattering setup 
 
 [Jan, Manasa]
We installed a camera at the ETMY end to look at the scattering pickoff from the ITMY. We were able to see the whole of the beam tube. We need
Entry  Wed Feb 20 01:40:37 2013, Manasa, Update, Alignment, Final IFO alignment- in progress 
[Yuta, Sendhil, Jamie, Jenne, Rana]

1. After the MC centering, we tried to align the IFO using IPPOS and IPANG as reference. This did not recover the alignment perfectly. We were clipping
    Reply  Thu Feb 21 16:53:37 2013, Manasa, Update, PSL, PSL shutter 
[Steve, Jenne, Yuta, Manasa]
We have kept the laser ON at low power through the pump down process. As we pumped down, at around 400torr, we found that the PSL mech shutter
closed. Steve explained  that it was due to an interlock with a pressure gauge. To keep the IFO running, we switched the shutter from N.C (normally
Entry  Thu Feb 21 19:55:02 2013, Manasa, Update, Locking, Green locking in arms ETMYF_1045540570.png
[Yuta, Manasa]

We have aligned the Y-arm to lock in green. The green
    Reply  Fri Feb 22 13:03:49 2013, Manasa, Update, , MC REFL PD murder dead.jpg
 
[Yuta, Manasa]
We turned IFO power back to 1.25W by removing the attenuator and forgot that the Y1 mirror before the REFL PD must be replaced with BS 10% before
    Reply  Fri Feb 22 17:33:25 2013, Manasa, Update, Electronics, MC REFL PD back from the dead 
 
 [Yuta, Manasa]
We replaced the dead photodiode on MC REFL PD with a new one (GAP 2000). We measured the frequency response of the PD and tuned the resonant frequency
Entry  Sat Feb 23 00:36:52 2013, Manasa, Summary, Locking, MC locked MCdecenter_23Feb2013.png
[Yuta, Manasa, Sendhil, Rana]

With MC REFL PD fixed, we aligned MC in high power enabling a fully functional MC autolocker.
Entry  Sun Feb 24 00:14:28 2013, Manasa, Update, SUS, SUS Summary 
I tried to fix the alarms for sensors on the SUS summary screen. I checked earlier elogs and found the setSensors.py script.
I received errors while running the script and pianosa was refused connection to nds. Yuta suspects problems with the lib directory.
Jamie! Can you fix this?
    Reply  Tue Feb 26 11:55:11 2013, Manasa, Update, Locking, FPMI locked 
 [Yuta, Manasa]

FPMI locked.
    Reply  Wed Feb 27 20:50:41 2013, Manasa, Update, LSC, 22/110MHz path for POP POP.png
[Yuta, Manasa]

Modified POP path.
    Reply  Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount 
 Drawing of customized mount for endtable doubler crystal (PV40+PVP2+NP9071) modified and updated on the endtable upgrade wiki page.
    Reply  Wed Mar 6 02:46:20 2013, Manasa, Update, LSC, PRMI locking for g-factor measurement POPDCspec_PRMIlocked.png
 [Yuta, Manasa]
PRMI alignment procedure for carrier  locking has been kept the same except that a couple of issues that have  persisted are now taken care of.
Entry  Wed Mar 6 18:14:33 2013, Manasa, Summary, LSC, Calibration of BS, ITMX and ITMY actuators MICHerrCalibration.pngMICHerrCalibration.pngMICHOLTF.pngactcalibITMBS.png
[Yuta, Manasa]

Measured actuator response between 50Hz and 200 Hz in (m/counts).
    Reply  Fri Mar 8 20:51:00 2013, Manasa, Update, Alignment, Input beam drift - investigation **IMPORTANT** 
Checking the drift in input pointing (TT2 is the main suspect)

I have centered IPPOS and the 2/3 part of IPANG that comes out of vacuum to the QPDs to see the drift in input pointing over the weekend or atleast
    Reply  Fri Mar 8 21:00:05 2013, Manasa, Update, PSL, PMC fixed 


    
        
            Quote:
        
        
            

             Mystery 
    Reply  Mon Mar 11 12:29:25 2013, Manasa, Update, Alignment, Input beam drift - weekend trend IPANG_drift.png
I centered ipang and ippos on the QPDs (using only the steering mirrors) and wanted to see the drift over the weekend.

Observation
    Reply  Mon Mar 11 17:18:00 2013, Manasa, Update, Environment, Earthquake: Suspensions tripped and MC realigned 
I found all suspensions including the MC suspensions tripped this morning after the earthquake.
I damped all the optics and realigned MC mirrors to lock at refl 0.57.
PRM and SRM tripped a couple of times due to the aftershocks that followed; but were damped eventually.
    Reply  Tue Mar 12 00:58:05 2013, Manasa, Update, Alignment, Yarm - Spot positions centered 
[Jenne, Manasa]

Spot centering on Y arm - DONE!
    Reply  Wed Mar 13 10:26:58 2013, Manasa, Update, Locking, We're still good!! 
We're still good with the IFO alignment after 7hours. 
I found the green still locked in the same state as last night; but no IR (so the arms are stable and the TTs should definitely take the blame).
From last night's observation (elog about drift in TT1), I only moved TT1 in pitch and
Entry  Wed Mar 13 16:25:16 2013, Manasa, Update, IOO, Tuning MC length/FSR 
[Koji, Manasa]
We looked at the MC modulation frequency on the spectrum analyzer and observed beat notes between MC modulation freq (29.5MHz) and modulation frequencies
(11.06 MHz and 55.3MHz).
    Reply  Wed Mar 13 16:29:25 2013, Manasa, Update, Locking, TWO arms TWO colors 


    
        
            Quote:
        
        
            

           - If X green lock is not tight, maybe temporarily increasing loop gain helps. This can be done by increasing the amplitude of the frequency
    Reply  Thu Mar 14 17:31:57 2013, Manasa, Update, Green Locking, X arm green locked in TEM00 


    
        
            Quote:
        
        
            

           Manasa has done some work to get the Xgreen aligned, so I'll switch to trying to find that beatnote for now.
    Reply  Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY Endtable_inventory.pdf
THE INVENTORY FOR ETMY ENDTABLE.
We definitely need the polaris mirror mounts and cylindrical lenses. As for the rest, we can still go ahead and do the swapping without them.
 
Entry  Wed Mar 20 14:52:09 2013, Manasa, Update, SAFETY, MC trans RFPD missing MC.png
PDA255 at the MC transmission end is missing and whoever had removed it earlier has left the beam undamped.
It could be less than a mW beam...but it is still not acceptable
    Reply  Wed Mar 20 15:51:54 2013, Manasa, Update, 40m Upgrading, Endtable upgrade  Endtable_inventory.pdf


    
        
            Quote:
        
        
            

           As discussed at the 40m meeting: Koji, Manasa and Steve
    Reply  Wed Mar 20 16:45:59 2013, Manasa, Bureaucracy, Auxiliary locking, Fetched NPRO from ATF P3203298.JPGP3203299.JPG
[Koji, Annalisa, Manasa]
NPRO with controller from ATF joins the 40m. We have put it on the POY table where we plan to use it for ABSL.
    Reply  Thu Mar 21 08:46:46 2013, Manasa, Update, 40m Upgrading, ETMY table swap 
Yes! We are swapping.
I'll be there very soon!
Entry  Thu Mar 21 10:29:12 2013, Manasa, Update, Computers, Computers down since last night down.pngdown.png
I'm trying to figure out what went wrong last night. But the morning status...the computers are down.
 
    Reply  Thu Mar 21 12:04:05 2013, Manasa, Update, Computers, Fixed up.png
All FE computers are back.
Restart procedure:
0a. Restart frame builder: telnet fb 8087 & type
Entry  Fri Mar 22 01:28:56 2013, Manasa, Update, Lasers, Beam profile of NPRO from ATF 
The NPRO from ATF has been installed on the POY table.
I have been making measurements to characterize the beam profile of this laser. I am using an AR coated laser window as a beam sampler at 45deg
and the razor blade technique to measure the beam size along z. Details of the procedure along with analysis and results from this will follow.
ELOG V3.1.3-