  6345   Thu Mar 1 21:48:34 2012 DenUpdatePEMseis box noise


   
        
            
 noise2.pngnoise.png 
  6346   Fri Mar 2 11:05:28 2012 DenUpdatePEMseis box gainI've replaced R2 resistor that adjusts
the gain of the AD620 amplifier. Previous
value 5491Ohm, new value 464Ohm, so the gain
 tf_new.pdfnoise_new.pdftf_analyzer.pngnoise_analyzer.png 
  6347   Fri Mar 2 16:05:52 2012 DenUpdateSAFETYlaser safetyToday I've attended the laser safety seminar.   
  6348   Fri Mar 2 18:11:50 2012 jamieSummarySUSevaluation of eLIGO tip-tilts from LLO[Suresh, Jamie]
Suresh and I opened up and checked
out the eLIGO tip-tilts assemblies we received
  
  6349   Fri Mar 2 18:55:06 2012 DenUpdatePEMseis boxI've put the seismometer box back to the
1x1, Guralp is back under MC2. When the seismometer
is not plugged in, the noise is
 dv_noise.png 
  6350   Mon Mar 5 03:22:54 2012 kiwamuUpdatePSLPMC realignedI realigned the steering mirrors for the
PMC. The trans value went up from 0.79 to
0.83.
  
  6351   Mon Mar 5 03:50:49 2012 kiwamuUpdateIOOPZT1 PITCH railingPZT1
started railing in the pitch direction and
because of this TRY doesn't go more than
  
  6352   Mon Mar 5 05:39:36 2012 kiwamuUpdateLSCREFL OSA installedThe
OSA for the REFL beam is now fully functional.
 APtable.png 
  6353   Mon Mar 5 06:11:08 2012 kiwamuSummaryLSCplansPlans:

     DRMI (PRMI) + one arm
  
  6354   Mon Mar 5 13:11:06 2012 kiwamuUpdateLSCinstalled a long BNC cable for REFL OSAA
long BNC cable was installed and now the
REFL OSA signal is happily shown on an oscilloscope
  
  6355   Mon Mar 5 14:10:35 2012 kiwamuUpdateLSCpower budget on the AP tableI
checked the laser powers on the AP table
and confirmed that their powers are low enough
 power_budget.png 
  6356   Mon Mar 5 15:15:15 2012 DenUpdatePEMRCG[Alex / Den]
I've encountered a problem that C1:PEM-SEIS_GUR1_X_IN1
is saved in the int format. It turned out
  
  6357   Mon Mar 5 17:07:58 2012 kiwamuUpdateIOOrealigned MCI
have slightly shifted the MC beam pointing
to relax the PZT1 PITCH. As a result the
  
  6358   Mon Mar 5 18:12:00 2012 KeikoUpdateLSCRAM simulation update I wrote an RAM simulation script
... it calculates the LSC signal offset and
the operation point offset depending on the
 Mar5RAM2.pngMar5RAM3.png 
  6359   Mon Mar 5 20:31:33 2012 KojiUpdateLSC22/110MHz path for POPThis a kind of self record...
We need an RF setup at POP to extract
22 and 110 MHz components separately.
  
  6360   Mon Mar 5 23:47:15 2012 keikoConfigurationLSCND2 at REFL OSAND filter ND3 (which is at the   
  6361   Tue Mar 6 00:13:20 2012 keikoUpdateLSCASI signal offset   Screenshot-Untitled_Window.png 
  6362   Tue Mar 6 01:35:03 2012 kiwamuUpdateLSCMICH characterization[Keiko / Kiwamu]
 Update on the MICH characterization:

    The OSAs weren't so great
  
  6363   Tue Mar 6 15:22:02 2012 KeikoUpdateLSCRAM simulation update

    

       
            
  
  6364   Tue Mar 6 16:06:15 2012 JenneConfigurationSUSPRM watchdog tripped


   
        
            
  
  6365   Tue Mar 6 16:17:36 2012 JenneUpdateSUSSUS matrix diagonalization statusHas default inmat:
PRM, ITMX
Has fancy inmat:
  
  6366   Tue Mar 6 22:23:04 2012 KojiUpdateLSC22/110MHz path for POP 
 As par Kiwamu's request, RF
filters for POP22 and POP110 were installed.
  
  6367   Tue Mar 6 23:14:38 2012 ranaUpdateSUSOptical Lever had bad filters We found that that bounce (16.1 Hz)
and roll (23.5 Hz) modes on the ITMX were
much higher than on the ITMY. After some
 Untitled.png 
  6368   Tue Mar 6 23:37:31 2012 keikoUpdateSUSMICH noise budget - SUS checkHere are the OSEM spectrum of MICH suspensions
(BS, IX, IY). Bounce and Roll modes are shown
on 16 and 23 Hz. The filters for them has
 6x 
  6369   Wed Mar 7 04:08:48 2012 kiwamuUpdateSUSBS SIDE gain was too lowThe
BS SIDE damping gain seemed too low. The
gain had been 5 while the rest of the suspensions
  
  6370   Wed Mar 7 11:20:23 2012 steveUpdateSUSoplev qpd offsets zeroedAll oplev qpd quadrons were zeroed by offset 
in blocked dark condition.
  
  6371   Wed Mar 7 11:44:29 2012 JenneUpdateGreen LockingXgreen beatnote cable made, laidThe Xgreen PD now has a cable going over
to the beatbox. Once beatbox characterization
is done I can re-find the beat, and we can
  
  6372   Wed Mar 7 13:30:17 2012 JimUpdatePEMadded TPs and JIMS channels to PEM front-end model [Jim Ryan]
The PEM model has been modified now
to include a block called 'JIMS' for the
  
  6373   Wed Mar 7 13:59:07 2012 Ryan FisherSummaryComputer Scripts / ProgramsAlterations to base epics install for installing aLIGO conlog:In order to install the necessary extensions
to epics to make the aLIGO conlog work, I
have edited one file in the base epics install
  
  6374   Wed Mar 7 15:56:36 2012 KojiUpdateLSC22/110MHz path for POPThe RF separator installed comprises of
the Minicircuits filters cascaded as in the
figure below. 
 RFseparator.pngimpedance.pdftransmission.pdf 
  6375   Wed Mar 7 16:32:09 2012 keikoUpdateLSCOSA I swap an OSA at PSL and OSA at REFL.
It was because the PSL-OSA had a better resolution,
so we place this better one at REFL. The
  
  6376   Wed Mar 7 17:39:40 2012 keikoUpdateLSCMICH noise budget on 5 Mar This is the calibrated MICH noise
budget on Mar 5. There was a sharp peak at
1Hz and a blob on 3 Hz. The demod phase was
 Mar5-MICHbudget.pngMar5-MICHbudget.png 
  6377   Wed Mar 7 18:00:39 2012 Ryan FisherSummaryComputer Scripts / ProgramsAlterations to base epics install for installing aLIGO conlog:


   
        
            
  
  6378   Wed Mar 7 19:10:06 2012 kiwamuUpdateLSCREFL OSA : how the signal look likeJust a quick report on the REFL OSA.

The attached plot below shows the
 OSArefl.png 
  6379   Wed Mar 7 20:06:23 2012 KojiUpdateLSCREFL OSA : how the signal look likeI'm puzzled why the 11MHz peak can be such
high considering 1.7~2 times smaller the
modulation depth.
  
  6380   Wed Mar 7 20:53:13 2012 keikoUpdateLSCMICH noise budget on 5 Mar 
 
 Mar6-MICHbudget.png 
  6381   Wed Mar 7 21:13:30 2012 ranaUpdateDAQNDS2 I noticed that NDS2 was not running
on mafalda as it should be. Instead, there
were a couple of zombie MEDMs using up 99%
  
  6382   Wed Mar 7 22:04:05 2012 kiwamuUpdateLSCREFL OSA : how the signal look likeI was also wondering about the same thing,
comparing with what Mirko obtained before
with the same OSA ( 
  
  6383   Wed Mar 7 23:28:41 2012 Lab Cleanup CrewHowToEnvironmentTrue Beauty....Or,
how a lab should
look at the end of every day. 
 Clean_40m_Electronics_Bench.jpg 
  6384   Wed Mar 7 23:29:28 2012 keikoUpdateLSCREFL OSA observation kiwamu, keiko
 
 
 REFLOSA.png 
  6385   Thu Mar 8 00:57:48 2012 keikoUpdateLSCMICH noise budget on Mar 5, Mar 6, and oldHere is the recent two noise budgets of
MICH, with the old measurement by Jenne.
The most latest Mar 6 data is quite close
 Mar7MICHbudgettotal.png 
  6386   Thu Mar 8 04:13:12 2012 kiwamuUpdateLSCupdate on the locking activity[Keiko / Kiwamu]
 Some updates on the locking
activity:
  
  6387   Thu Mar 8 17:18:19 2012 Ryan FisherSummaryComputer Scripts / ProgramsAlterations to base epics install for installing aLIGO conlog:I have the aLIGO Conlog 'working' at http://192.168.113.209/conlog/conlog.php

  
  6388   Thu Mar 8 23:37:03 2012 kiwamuUpdateIOOdither Y arm dither scriptI
disabled the feedback to the PZT1 PITCH in
the Y arm dithering scripts so that it won't
  
  6389   Fri Mar 9 10:17:06 2012 steveHowToPEMdo not leave tables openType: How not to
Please do not leave optical tables
open! You will be held responsible for creating
 P1080547.JPG 
  6390   Fri Mar 9 10:44:57 2012 steveUpdateRF SystemOSAOptical spectrum analyzers like the Attachment
made by Coherent , Meles Griot- CVI and Spectral
Product are all discontinued.
 OSA.pdf 
  6391   Fri Mar 9 11:02:56 2012 Ryan FisherSummaryComputer Scripts / ProgramsAlterations to base epics install for installing aLIGO conlog:[H1]Too Many Fast Changing EPICS in New Conlog[/H1]
I have been monitoring the new conlog, and
it already has far too many rows.
  
  6392   Fri Mar 9 11:59:38 2012 Zweizig the ELOG MavenSummaryCDSNDS2 restart    
  6393   Fri Mar 9 13:34:13 2012 keikoUpdateLSCupdate on the locking activityWe tried to measure the sensing matrix
for MICH and PRCL last night. They look too
much mixed as we expect... the matrix may
  
  6394   Fri Mar 9 15:48:56 2012 Ryan FisherSummaryComputer Scripts / ProgramsAlterations to base epics install for installing aLIGO conlog:[SIZE=1]
I decided to make a backup of the database
and then delete it and make a new database:
  