40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 125 of 170  Not logged in ELOG logo
Entry  Wed Jul 14 01:05:27 2010, Sharmila,Katharine, Summary, elog, Maglev P7120284.JPGP7120278.JPGP7120281.JPGP7140292.JPG
Yesterday we hooked up the Quadrant Maglev control to the power supply to test the components in the Input/Output part of the circuit.
The output from the buffer was an unexpected high noise signal which was caused by some circuit components.
Entry  Tue Jul 13 11:51:19 2010, Jenne, Update, PEM, Gur1 has no signal?!?!?!?! Gur1_noSignal_13Jul2010.png
[Sanjit, Jenne]
Sanjit discovered that the Gur1 channels are all digital 0.  We determined that this began on July8, 04:00 UTC (~9pm on the 7th?).
It's digital zero, so we suspect a software thing.  Just to check, we put a sine wave in, and didn't see anything.  Gur2 seems totally
    Reply  Tue Jul 13 23:20:37 2010, Jenne, Update, PEM, Gur1 has no signal?!?!?!?! 


    
        
            Quote:
        
        
            
            [Sanjit, Jenne]
Entry  Tue Jul 13 21:04:49 2010, tara,rana, Summary, PSL, Transfer function of FSS servo TF_FSS_ser.png
 I measured FSS's open loop transfer function.

 For FSS servo schematic, see 
Entry  Tue Jul 13 19:26:47 2010, rana, Update, IOO, MC still broken a.txt.gz
After whatever Joe/Alberto did this afternoon, the MC was not locking. Koji and I removed several of the cables in the side of the rack where they
were apparently working (I say apparently because there's no elog).
MC is now locking but the autolocker did not work at first - op340m was unable to access any channels from c1iool0. After several minutes, it mysteriously
Entry  Tue Jul 13 17:36:42 2010, nancy, Update, IOO, Wavefront Sensing Matrix Control 
For yesterday - July 12th.
Yesterday, I tried understanding the MEDM and the Dataviewer screens for the WFS.
I then also decided to play around with the sensing matrix put into the WFS control system and see what happens.
Entry  Tue Jul 13 14:59:04 2010, Gopal, Update, Optic Stacks, Eigenfrequency Analysis of Single Stack Complete Eigenmode_Stack_4.pngEigenmode_Stack_4_xdisp.pngEigenmode_Stack_4_ydisp.pngEigenmode_Stack_4_zdisp.png
Via reconfiguration of Viton parameters (previously posted), I managed to debug the COMSOL run time errors and null pointer exceptions. Listed are
the resultant eigenfrequencies obtained through structural analysis testing. For all tests, the bottom of the Viton springs are constrained from motion,
and all other parts are free to oscillate. Notice that color variations signify displacement from the equilibrium position. Also note that different
Entry  Fri Jul 9 12:25:25 2010, kiwamu, Update, Green Locking, SHG on PSL table PSL_doubling.png
In order to increase the green power on the PSL table, I moved the
position of the Second Harmonic Generation (SHG) crystal by ~5cm.
After this modification, the green power increased from 200 uW to 640
    Reply  Tue Jul 13 11:00:29 2010, kiwamu, Update, Green Locking, SHG on PSL table : optimum temeprature power_temp.png
The optimum temperature for the doubling crystal on the PSL table was found
to be 36.8 deg.
I scanned the temperature of the crystal from 44 deg to 29 deg, in order to find the optimum temperature where the frequency doubled power is maximized. 
       Reply  Tue Jul 13 11:20:07 2010, Dmass, Update, Green Locking, SHG on PSL table : optimum temeprature 
 
 It seems like you might inherit an offset by using step (3) b/c of the temperature gradient between the crystal and the sensing point. Depending
on how large this gradient is you could increase the linear coupling from temperature to intensity noise from zero to a significant number. Phase noise
Entry  Tue Jul 13 10:02:30 2010, steve, Update, MOPA, laser power is dropping slowly power100d.jpg
I have just removed an other 400 cc of water from the chiller.  I have been doing this since the HTEMP started fluctuating.
The Neslab bath temp is 20.7C, control room temp 71F
 
Entry  Mon Jul 12 22:01:13 2010, Koji, Update, SUS, One TT suspended. Still need fine alignment IMG_2634.jpg
Jenne and Koji
We tweaked the alignment of the TT mirror.
First we put a G&H mirror, but the mirror was misaligned and touching the ECD as the magnet was too heavy. We tried to move the wires towards
Entry  Mon Jul 12 21:26:02 2010, Katharine, Sharmila, Update, elog, maglev coils P7120276.JPG
The connection between our coil wires and BNC terminals was pretty awful (soldered wires broke off ) so we removed the old heat shrink and re-soldered the wires.  We then chose more appropriately sized heat shrinks (small one around each of the
two soldered wires, a medium-sized shrink around the wires together, a large one covering the BNC terminal and the wire) and used the solder iron and heat
Entry  Mon Jul 12 18:37:10 2010, Gopal, Update, Optic Stacks, Eigenfrequency Analysis of Simple Objects 
Eigenfrequency analysis has been successfully completed in COMSOL on both a tutorial camshaft, as well as a homemade metal bar.
Upon increasing in complexity to the busbar, I once again began getting into run time errors and increased lag. It seems that this is due to undefined
eigenvalues when solving the linear matrices. I tried many boundary values as well as initial conditions in case this was the issue, but it was not. There
Entry  Mon Jul 12 15:49:56 2010, nancy, Update, SUS, Characterisation of the QPD fullyaw.jpgyaw_linear.jpgfullpitch.jpgpitch_linear.jpg
I and koji setup the measurement of the QPD response to the pitch and yaw displacements of the beam spot.
We did this using a 100mW 1064nm laser. Its power was attenuated to ~ 1.9mW, and the spot size at the QPD position was 6000-7000 um .
The QPD was put on a translation stage, using which, the center of teh QPD wrt the beam spot could be moved in pitch and yaw.
    Reply  Mon Jul 12 17:05:30 2010, nancy, Update, SUS, Characterisation of the QPD plot.pngplot.png


    
        
            Quote:
        
        
            
            I and koji setup the measurement of the QPD response to the pitch and yaw displacements of the beam spot.
Entry  Mon Jul 12 11:20:56 2010, Gopal , HowTo, COMSOL Tips, Intrusions (Negative Extrusions) 6x
For the sake of future users, I have decided to periodically add tips and tricks in using COMSOL that I have figured out, most probably after hours of
circuitous efforts. They will always be listed under the new COMSOL Tips category.
Today's topic: Intrusions
    Reply  Mon Jul 12 12:16:50 2010, Dmass, HowTo, COMSOL Tips, Intrusions (Negative Extrusions) 
 An entry on the 40m wiki page might serve you better, and be easier to  sift through once all is said and done
Entry  Mon Jul 12 10:23:51 2010, steve, Update, PEM, air condition maintenance is today pem2y.jpg
The AC filters will be checked and/or replaced today. This means the AC will be off for sort periods of time. Temperature and particle count will be
effected some what. 
See 800 days plot
Entry  Mon Jul 12 02:21:01 2010, Koji, Configuration, ASC, Resurrection of MC WFS 
I have resurrected the MC WFS on Friday night.
I have uncommented the WFS part of the MC autolocker.
The WFS total gain was empirically set to 0.1 such that the loops have no instability.
Entry  Wed Jul 7 12:17:36 2010, Razib, Update, Phase Camera, Weekly update DC_1Hz_beat_sig.jpgDC_1Hz_beat_sig.jpgDC_5Hz_beat_sig.jpg
I have completed the following tasks:
1. Find a simplified calibration of the exposure time for the current He-Ne setup. Basically, I triggered the camera to take 20 snapshots with
a 20 Hz driving signal at different exposure time beginning from 100 us (microsecond) upto 4000 us with an increment of 200 us.
    Reply  Fri Jul 9 12:07:26 2010, Razib, Update, Phase Camera, Weekly update phase_cam_setup_09_08_10.jpgmod_setup_(copy)_annotated.jpg
Here are some more details about the current phasecam setup. We are using a He-Ne laser setup
Entry  Fri Jul 9 11:41:58 2010, Gopal, Summary, Optic Stacks, Top Optic Layer Complete; Mechanical Tests Giving Problems 7x







                                                      
Entry  Fri Jul 9 11:09:14 2010, josephb, Update, Computers, Fb40m and a few other machines turned off briefly just before 11am 
I turned off fb40m2 and fb40m temporarily while we added an extra power strip  to the (new) 1X6 rack at the bottom in the back.  This is to
allow for the addition of the 4600 computer  given to us by Rolf (which needs a good name) into the rack above the fb machine.  The fb40m2 was
unfortunately plugged into the main power connectors, so we unplugged two of its cables, and put them into the new strip. While trying to undo some of
Entry  Thu Jul 8 19:43:16 2010, nancy, Update, IOO, WFS calculations 
The WFS error signals were recorded in the order 
WFS1_PIT
WFS1_YAW
    Reply  Thu Jul 8 21:44:43 2010, nancy, Update, IOO, WFS calculations 
 
I just found the singular values and the condition number of the 4*4 matrix relating the WFS error signals and the MC1 and MC2 movements.
the condition number is ~12.5.  I think its small enough to continue with the scheme. (if the measurements and all are reliable).
 
Entry  Wed Jul 7 22:58:08 2010, nancy, Update, IOO, MC alignment values. 
Nancy and Koji:
This is what I and Koji measured after aligning the MC in the afternoon.
MC_Trans 4.595 (avg)
    Reply  Wed Jul 7 23:11:08 2010, Koji, Update, IOO, MC alignment values. 
Hmm. I expect that you will put more details of the work tomorrow.
i.e. motivation, method, result (the previous entry is only this), 
and some discussiona with how to do next.
       Reply  Thu Jul 8 20:32:22 2010, nancy, Update, IOO, MC alignment values. 
I and Koji were trying to lock the mode cleaner for measuring the  beam power at MC2 end. That is when we obtained the trans and refl  values.
The beam characteristics at the MC2 were measured so that we could  now use a dummy beam of similar power to test and characterize the QPD  we
are about to install at the MC2 end. This QPD wil provide two more  signals in pitch and yaw, and hence complete 6 signals for 6 rotatioanl  dof of the
Entry  Thu Jul 8 17:29:20 2010, Katharine, Sharmila, Update, elog,  6x



Last night, we successfully connected and powered our circuit, which
Entry  Thu Jul 8 16:24:30 2010, Gopal, Update, Optic Stacks, Completion of single stack layer 
Single layer of stack successfully modeled in COMSOL. I'm working on trying to add Viton springs now and extend it to a full stack. Having some difficulty
with finding consistent parameters to work with.
Entry  Wed Jul 7 22:22:49 2010, Jenne, Update, Computers, Some channels not being recorded!!! 
[Rana, Jenne]
We discovered to our great dismay that several important channels (namely
C1:IOO-MC_L, but also everything on c1susvme2) are not being recorded, and haven't been since May 17th.  This corresponds to the same
    Reply  Thu Jul 8 14:11:16 2010, josephb, Update, Computers, Some channels not being recorded!!! 
This has been fixed, thanks to some help from Alex.  It doesn't correspond to
new computers being put in, but rather corresponds to a dcu_id change I had made in the new LSC model.
The fundamental
problem is way back when I built the new LSC model using "lsc" as the name instead of something like "tst", I forgot to go to the current
       Reply  Thu Jul 8 15:43:58 2010, rana, Update, Computers, Some channels not being recorded!!! 3-monkeys-ComicPosition.gif


    
        
            Quote:
        
        
            
            This has been fixed, thanks to some help from Alex.  It
Entry  Thu Jul 8 15:19:27 2010, josephb, koji, Configuration, Computers, Added Zonet camera to IP table on linux1 
We gave the Zonet camera the IP 192.168.113.26 and the name Zonet1.
We did this by modifying the /var/named/chroot/var/named/113.168.192.in-addr.arpa.zone and martian.zone files on linux1 as root.
Entry  Thu Jul 8 14:32:42 2010, josephb, Update, CDS, Daily Downs Update 
After talking with Rolf, and clarifying exactly which machine I wanted, he gave me an 4600 Sun machine (similar to our current megatron).  I'm currently
trying to find a good final place for it, but its at least here at the 40m. 
I also acquired 3 boards to plug our current VMIPMC 5565 RFM cards into, so they can be installed in the IO chassis.  These require +/- 5V
Entry  Wed Jul 7 22:52:38 2010, rana, nancy, Configuration, IOO, bad length control offset for the MC P7070251.jpgScreenshot.png
Rana found out that a connection was bad in the shown place, due to which the MEDM screen was showing bad offset for length control.
Basically, the offset slider value would not go into the system because of that bad connection, and was locking the mode cleaner at the wrong location.
Entry  Wed Jul 7 19:41:27 2010, Jenne, Update, SUS, 1.5 more ECD sets suspended for tip tilts ECDbackplane_blackdump_small.jpgECDbackplane_foil_small.jpg
[Jenne, Kyung Ha]
We made some good progress on suspending the Tip Tilt ECDs today.  We finished one whole set, plus another half.  The half is because
one of the screw holes on the lower right ECD somehow got cross threaded.  The ECD and screws in question were separately wrapped in foil to mark
Entry  Wed Jul 7 17:18:57 2010, Alberto, Configuration, Electronics, Stochmon and LSC AM Stabilizer Decomissioned 
Today I disconnected and removed the Stochmon box from the 1Y2 rack.
I also removed the amplifiers that were sitting on the PSL table,
next to the RF AM PD, that were connected to the Stochmon. I pulled back the RG cable and the power cables that went from the PSL table to the 1Y1 and
1Y2 racks.
The power cable, all rolled up, is now sitting on the floor, inside the 1Y1 rack and one of its end is still connected to the power
Entry  Wed Jul 7 17:05:30 2010, steve, rana, Update, SAFETY, Summary of Crane Damage/Malfunction 10x
The 1 Ton yellow crane support beam jammed up at Friday morning, June 25.
 
The 40m vertex crane has a folding I-beam support to reach targeted areas. The rotating I-beam is 8 ft long. The folding extension arm gives you
Entry  Wed Jul 7 12:45:00 2010, nancy, Update, , Weekly Update 
Wednesday after the meeting - Started report, learnt mode cleaner locking from Kiwamu and Rana, saw how to move optics on the tables with Rana and kiwamu.
Thursday - Made the report
Tuesday - report.
Entry  Wed Jul 7 11:35:59 2010, Gopal, Update, WIKI-40M Update, 6.30.10 - 7.7.10 Weekly Update  
Summary of this Week's Activities:
6/30: 2nd and 3rd drafts of Progress Report
7/1: 4th draft and final drafts of Progress Report; submitted to SFP
Entry  Wed Jul 7 11:23:08 2010, Sharmila, Katharine, Update, WIKI-40M Update,  
Weekly Update:
Last Weds-Thurs, we wrote and edited our progress reports.
Tuesday (and Weds morning):  Continued circuit analysis of Haixing's circuit and plotting transfer functions (almost have one for entire circuit). 
Entry  Wed Jul 7 00:15:29 2010, tara,Rana, Summary, PSL, power spectral density from RefCav transmitted beam  RIN_rftrans.pngtara.png
I measured the RC transmitted light signals here at the 40m. I made all connections through the PSL patch panel. 
Other than two steering mirrors in front of the periscope, and the steering
    Reply  Wed Jul 7 10:42:29 2010, Koji, Summary, PSL, power spectral density from RefCav transmitted beam  
How do you calibrate this to Hz/rtHz?


    
        
            Quote:
        
        
            
Entry  Tue Jul 6 17:38:27 2010, Jenne, Update, SUS, Tip Tilt Progress! 
[Jenne, Kyung Ha]
We successfully suspended the 4 eddy current dampers for the first Tip Tilt.  We had some lessons learned, including how to carefully get
an allen wrench in between the dampers to do up some of the screws, and how to be careful not to bend the wire while tightening the screws.  More
Entry  Tue Jul 6 17:29:04 2010, Chip, Update, PEM, The Ranger is mine! 
 
Entry  Tue Jul 6 17:07:56 2010, josephb, Update, CDS, c1sus status 
I talked to Alex, and he explained the steps necessary to get the real time linux kernel installed.  It basically went like copy the files from
c1iscex (the one he installed last month) in the directory /opt/rtlidk-2.2 to the c1sus locally.  Then go into rtlinux_kernel_2_6, and run make and
make install (or something like that - need to look at the make file).  Then edit the grub loader file to look like the one on c1iscex (located at
Entry  Tue Jul 6 17:05:30 2010, Megan and Joe, Update, Computers, c1iovme reboot 
We rebooted c1iovme because the lines stopped responding to inputs on C1:I00-MC_DRUM1. This fixed the problem.
Entry  Tue Jul 6 11:57:06 2010, josephb, Update, CDS, Daily Downs Update 
I went to talk to Rolf and Jay this morning.  I asked Rolf if a chassis was available, so he went over and disconnected one of his test stand chassis
and gave it to me.  It comes with a Contect DIO-1616L-PE Isolated Digital IO board and an OSS-MAX-EXP-ELB-C, which is a host interface board. 
The OSS board means it has to go into the south end station.  There's a very short maximum cable length associated with that style, and the LSC and
Entry  Fri Jul 2 11:33:15 2010, josephb, Update, CDS, c1sus needs real time linux to be setup on it 
I connected a monitor and keyboard to the new c1sus machine and discovered its not running RTL linux.  I changed the root password to the usual,
however, without help from Alex I don't know where to get the right version or how to install it, since it doesn't seem to have an obvious CD rom drive
or the like.  Hopefully Tuesday I can get Alex to come over and help with the setup of it, and the other 1-2 IO chassis.
Entry  Fri Jul 2 11:06:38 2010, josephb, kiwamu, Update, CDS, CDS and Green locking thoughts 
Kiwamu and I went through and looked at the spare channels available near the PSL table and at the ends.
First, I noticed I need another 4 DB37 ADC adapter box, since there's 3 Pentek ADCs there, which I don't think Jay realized.
PSL Green Locking
Anyways, in the IOO chassis that will put in, for the ADC we have a spare 8 channels which comes in the DB37 format. 
Entry  Thu Jul 1 17:05:36 2010, josephb, kiwamu, steve, Update, CDS, New SUS Chassis in rack 
Thanks to Steve's work on some L brackets, and Kiwamu's lifting help, we now have a new SUS IO chassis in the new 1X4 rack (formerly the 1Y4 rack), just
below the new SUS and LSC computers.  I have decided to call the sus machine, c1sus, and give it IP address 192.168.113.85.  We also put in a
host interface adapter, OSS-HIB2-PE1x4-1x4 Re-driver HIB, which connects the computer to the IO chassis.
Entry  Thu Jul 1 14:28:39 2010, Jenne, Update, PEM, MC1 Accelerometers in place 
Kevin sent me an email with top secret info on where one of the other accelerometer cubes was hiding (it was with his shaker setup on the south side
of the SP table), so I took it and put the 3 MC1 accelerometers in their 3-axis configuration. 
Also, I changed the orientation of both sets of 3 axis accelerometers to reflect a Right Handed configuration, to go along with the new and improved
Entry  Thu Jul 1 14:03:40 2010, josephb, Update, PEM, Temporary disconnect of some PEM channels for ~20 minutes 
In order to identify the output adapter of the BNC patch panel used for about 20 PEM channels, I had to disconnect its power and remove the back panel. 
Channels coming into that panel (seismometers and so forth) was out from 1:36 to 1:56 pm.
I did a quick check of some of the channels and it looks like its working again after putting it all back together.
Entry  Thu Jul 1 10:26:34 2010, steve, Configuration, VAC, pd68 at vacuum normal state pd68slow2d.jpgpem134d.jpg
Slow pump down _pd68 has reached the vacuum normal state.  CC4_Rga region is pumped now. The RGA is still off.
Precondition to this pump down:                                                                                                                                                                                                                               &nb
Entry  Wed Jun 30 23:03:46 2010, rana, Configuration, IOO, Power into MC restored to max 
Kiwamu, Nancy, and I restored the power into the MC today:

    Changed the 2" dia. mirror ahead of the MC REFL RFPD back to the old R=10% mirror.
    Since the MC axis has changed,
we had to redo the alignment of the optics in that area. Nearly all optics had to move by 1-2 cm.
    2 of the main mounts there had the wrong
Entry  Wed Jun 30 18:16:55 2010, steve, Update, SAFETY, SURF safety training 2010 DSC_1902.JPG
40m SURFs Razib Obaid, Nancy Aggarwal, Unknown Bearded SMURF, Megan Daily, Gopal Nataraj, Katharine
Larson and Sharmila Dhevi received 40m specific safety training on June 23, 2010.
Entry  Wed Jun 30 17:30:54 2010, Jenne, Update, PEM, Seismometers moved for MC Wiener work 
Now that the MC is back up and running, I put the Guralp seismometers at the ends of the mode cleaner.  Gur1 is near MC2, and Gur2 is near MC1 (yes,
it seems backwards....that's how the cable lengths work).  Also, the set of 3 MC2 accelerometers are in place under MC2.  I can't find the black
cube for the other set of accelerometers, so there aren't any around MC1/3. 
Entry  Tue Jun 29 17:10:49 2010, steve, rana, Update, VAC, slow pumpdown started 
The folding crane was fixed and tested this morning by the NNN rigging company. Pictures will be posted by Steve in the morning.
Afterwards, the ITM-east door was installed, jam-nuts checked. No high voltage was on for the in-vac PZTs.
The annulus spaces were roughed down to 350mTorr by Roughing Pump RP1. For this operation, we removed the low flow valve from the RP1 line.
    Reply  Tue Jun 29 23:49:18 2010, steve, rana, Update, VAC, slow pumpdown started Untitled.png

The pumpdown started at 4 PM (2300 UTC). At 10 PM, we (Jenne, Jan, and I) opened up the RV1 valve to full open. That's the second inflection point
       Reply  Wed Jun 30 00:45:26 2010, rana, Update, VAC, slow pumpdown stopped for the night 
As per Steve's instructions, at 12:43 AM, I used the following steps to stop the pumpdown until the morning:

    Close RV1 using the 'steering-wheel' wrench.
    Close V3.
    Turn OFF RP1.
    Disconnect RP1 hose at
the plastic disconnect attached to the slow-start throttle valve.
       Reply  Wed Jun 30 15:24:04 2010, steve,kiwamu, Update, VAC, slow pumpdown copmlete slowpd.jpgbutterfly.JPG


    
        
            Quote:
        
        
            
            
Entry  Wed Jun 30 14:38:04 2010, Jenne, Update, PEM, Guralp terminator is switched 
I moved the Guralp box's input terminator from Gur1 to Gur2 a minute or so ago to check the other channels.
Entry  Wed Jun 30 12:20:49 2010, Razib, Update, Phase Camera, Weekly update 
This week I have completed following tasks:
1. Worked out the analytical expressions for the amount of power of the DC and oscillatory part going into the camera.
2. Realigned the He-Ne PhaseCam setup as we had to replace the first steering mirror after the laser with a silvered mirror ( one without a dielectric
ELOG V3.1.3-