Mon Aug 2 17:12:28 2010, Koji, Update, General, Lab schedule for the week of Aug. 2
|
Fri Jul 30 09:55:34 2010, steve, Configuration, VAC, slow pumpdown has started
|
Fri Jul 30 17:54:55 2010, steve, HowTo, VAC, How to stop and start slow pumpdown
|
Fri Jul 30 22:07:42 2010, Koji, HowTo, VAC, How to stop and start slow pumpdown
|
Sat Jul 31 10:12:05 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown
|
Sat Jul 31 14:59:33 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown
|
Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed
|
Sun Aug 1 21:40:27 2010, rana, Summary, PSL, FSS: SLOWDC response
|
Sun Aug 1 21:04:45 2010, rana, Summary, Computer Scripts / Programs, MC Autolocker fixed
|
Sat Jul 31 22:35:01 2010, Koji, Update, VAC, Vac-P1 still 1.2mtorr
|
Sun Aug 1 18:50:35 2010, Koji, Update, VAC, P1 = 0.48 torr
|
Sat Jul 31 04:03:11 2010, Gopal, Summary, Optic Stacks, Complete Displacement Translational Transfer Function Matrix
|
Fri Jul 30 17:52:12 2010, Koji, Configuration, General, Jacket
|
Fri Jul 30 19:20:15 2010, Alastair, Configuration, General, Jacket
|
Fri Jul 30 17:24:22 2010, Jenne, Update, PEM, Guralps back in the 40m
|
Thu Jul 29 12:31:09 2010, Koji, Summary, General, Lab Schedule
|
Fri Jul 30 14:53:09 2010, steve, Update, General, PSL table leg upgrade
|
Fri Jul 30 12:46:38 2010, Koji, Configuration, 40m Upgrading, BS chamber status
|
Wed Apr 21 10:09:23 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Tue Apr 27 14:18:53 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Thu Jul 29 21:13:39 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Thu Jul 29 22:58:25 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Fri Jul 30 00:02:15 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals
|
Fri Jul 30 09:51:58 2010, kiwamu, Update, Green Locking, Re: waist positon of Gaussian beam in PPKTP crystals   
|
Thu Jul 29 22:08:32 2010, Alberto, Update, SUS, More optics installed on the BS table
|
Fri Jul 30 02:54:04 2010, Koji, Update, 40m Upgrading, More optics installed on the BS table
|
Thu Jul 29 20:43:32 2010, Gopal, Summary, Optic Stacks, Modeling Tips and Tilts   
|
Thu Jul 29 15:35:21 2010, josephb, kiwamu, Update, CDS, Working out ADC/DAC/BO wiring
|
Thu Jul 29 17:12:48 2010, josephb, kiwamu, Update, CDS, Re:Working out ADC/DAC/BO wiring
|
Thu Jul 29 17:11:16 2010, Gopal, Update, COMSOL Tips, Including Gravity in COMSOL
|
Thu Jul 29 12:31:24 2010, josephb, Update, CDS, Working DAC, working IOP - next up SUS
|
Thu Jul 29 12:13:28 2010, kiwamu, Summary, CDS, near term plan
|
Thu Jul 29 11:33:38 2010, kiwamu, Update, CDS, PCI5565 driver for RFM
|
Mon Jul 26 20:12:18 2010, kiwamu, Update, SUS, OSEMs on PRM
|
Tue Jul 27 21:38:21 2010, kiwamu, Update, SUS, installation of in-vac optics 
|
Wed Jul 28 17:32:37 2010, kiwamu, Update, SUS, installation of in-vac optics
|
Thu Jul 29 10:39:43 2010, kiwamu, Update, SUS, Re: installation of in-vac optics
|
Wed Jul 28 18:24:57 2010, Jenne, Update, Green Locking, 2 Green Periscopes have mirrors, aligned
|
Wed Jul 28 14:54:56 2010, steve, Update, SAFETY, evacuation drill at the 40m
|
Wed Jul 28 14:34:29 2010, channa, Update, Computers, installation on allegra
|
Wed Jul 28 13:06:47 2010, Razib, Update, Phase Camera,  
|
Wed Jul 28 12:53:32 2010, channa, Update, Computers, nds data listener
|
Wed Jul 28 12:31:00 2010, Gopal, Update, WIKI-40M Update, 7.21.10-7.28.10 Weekly Update
|
Tue Jul 27 18:42:57 2010, Gopal, Update, Optic Stacks, Bode Magnitude Plot and Concerns
|
Wed Jul 28 01:05:44 2010, rana, Update, SEI, Bode Magnitude Plot and Concerns
|
Wed Jul 28 12:16:03 2010, Gopal, Update, SEI, Bode Magnitude Plot and Concerns
|
Wed Jul 28 12:09:06 2010, Sharmila,Katharine, Update, WIKI-40M Update, Maglev
|
Tue Jul 27 23:46:45 2010, Jenne, Update, SUS, Q measurements of 2 TTs
|
Tue Jul 27 16:33:50 2010, Koji, Summary, General, High school students tour
|
Mon Jul 19 21:47:36 2010, rana, Summary, DAQ, DAQ timing test
|
Tue Jul 27 16:03:36 2010, rana, Summary, DAQ, DAQ timing test
|
Tue Jul 27 12:02:31 2010, Gopal, Update, Optic Stacks, Preliminary Transfer Function Measurements on MC1/MC3    
|
Tue Jul 27 11:43:24 2010, steve, Update, PEM, air quality is bad today
|
Tue Jul 27 11:24:53 2010, josephb, HowTo, Computer Scripts / Programs, killdataviewer script
|
Mon Jul 26 20:30:35 2010, Jenne, Update, SUS, 2 Tip Tilts suspended and balanced
|
Mon Jul 26 14:24:46 2010, josephb, kiwamu, Update, CDS, RFM test take 1
|
Mon Jul 26 12:31:36 2010, kiwamu, Update, CDS, front end machine for the X end
|
Mon Jul 26 11:15:23 2010, Gopal, HowTo, COMSOL Tips, Pictures from Transfer Function Tutorial on the Wiki 7x
|
Fri Jul 23 10:16:44 2010, josephb, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc
|
Fri Jul 23 21:35:48 2010, rana, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc
|
Mon Jul 26 10:02:42 2010, josephb, Update, CDS, Rerouted RFM around c1lsc, took RFM card out of c1lsc
|
Fri Jul 23 15:32:02 2010, steve, Update, PEM, control room AC set point changed
|
Mon Jul 26 08:51:31 2010, steve, Update, PEM, lowering AC setpoint by 2F makes PSL happy
|
Sun Jul 25 18:47:23 2010, Alberto, Update, SVN, Optickle 40mUpgrade model updated to include short cavity length corrections
|
Sat Jul 24 14:03:19 2010, Alberto, Update, Electronics, FSS Oscilaltor Phase Noise Measurement
|
Sat Jul 24 14:27:36 2010, rana, Update, Electronics, FSS Oscilaltor Phase Noise Measurement
|
Fri Jul 16 20:25:52 2010, Megan, Update, PSL, Reference Cavity Insulation 
|
Fri Jul 16 23:53:27 2010, Rana, Update, PSL, Reference Cavity Insulation
|
Fri Jul 23 16:02:16 2010, Rana, Update, PSL, Reference Cavity Insulation
|
Fri Jul 23 21:14:29 2010, Rana, Update, PSL, Reference Cavity Insulation
|
Fri Jul 23 15:54:38 2010, kiwamu, Update, SUS, PRM and TT installed
|
Fri Jul 23 18:55:25 2010, kiwamu, Update, SUS, PRM and TT installed
|
Fri Jul 23 16:00:35 2010, steve, Update, SAFETY, crane load test tomorrow
|
Fri Jul 23 14:26:01 2010, Gopal, Update, Optic Stacks, Simple Frequency Response Measurements in COMSOL
|
Fri Jul 23 12:33:51 2010, josephb, Update, CDS, megatron, c1iscex, c1sus firewalled
|
Fri Jul 23 08:18:03 2010, josephb, Update, CDS, Not enough room in IO chassis for RFM card - need to swap PMC to PCIe adapters
|
Thu Jul 22 14:07:20 2010, kiwamu, Update, PSL, PSL front end machine
|
Thu Jul 22 15:59:29 2010, Alberto, Update, PSL, PSL front end machine
|
Thu Jul 22 18:18:54 2010, Alberto, Update, PSL, Problem Solved
|
Fri Jul 23 00:13:11 2010, rana, Update, PSL, Problem NOT REALLY Solved
|
Thu Jul 22 13:44:47 2010, Jenna, Update, PEM, Guralp seismometer
|
Tue Jul 20 08:04:31 2010, steve, Configuration, VAC, slow vent has started
|
Tue Jul 20 23:52:36 2010, kiwamu, Update, VAC, update: slow vent has started
|
Wed Jul 21 12:41:31 2010, kiwamu, Update, VAC, vent finished
|
Thu Jul 22 08:07:27 2010, steve, Update, VAC, vent finished
|
|