40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 124 of 172  Not logged in ELOG logo
Entry  Wed Aug 18 12:24:58 2010, josephb,kiwamu, Update, CDS, shmem issue 
Entry  Wed Aug 18 12:02:29 2010, Alastair, Configuration, Computers, elog had crashed again... 
Entry  Wed Aug 18 11:40:59 2010, josephb,kiwamu,yoichi, Update, CDS, End station working with latest RCG code 
Entry  Tue Aug 17 23:59:46 2010, Katharine, Update, elog, Maglev update repulsiveforce.pngOSEMcalibration.pngOSEMslopes.png
Entry  Tue Aug 17 09:06:08 2010, Alberto, Update, elog, elog was down 
Entry  Thu Aug 12 11:19:04 2010, kiwamu, Update, CDS, current status 
    Reply  Thu Aug 12 14:01:53 2010, josephb, Update, CDS, current status 
       Reply  Thu Aug 12 18:30:08 2010, kiwamu, Update, CDS, Re: current status 
    Reply  Tue Aug 17 02:07:11 2010, Yoichi, Update, CDS, DACs have correct number of channels 
Entry  Mon Aug 16 19:12:18 2010, Jenne, Update, SUS, More TT characterization 
    Reply  Mon Aug 16 23:39:29 2010, Yoichi, Update, SUS, More TT characterization EQStopScrewHoles.jpg
Entry  Mon Aug 16 23:13:25 2010, Zach, Update, elog, e to the log 
Entry  Fri Aug 13 15:29:35 2010, Aidan, Frogs, Photos, Here's the 40m team 40m_team.JPG
    Reply  Mon Aug 16 13:33:06 2010, Zach, Frogs, Photos, Here's the 40m team 
Entry  Fri Aug 13 20:58:20 2010, Jenna, Summary, Electronics, Rubidium clock phase noise measurement 6x
Entry  Fri Aug 13 18:32:48 2010, steve, Update, PEM, new legs attached to optical table P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG
Entry  Thu Aug 12 23:17:54 2010, Zach, Update, elog, restarted 
    Reply  Thu Aug 12 23:41:48 2010, Jenne, Update, elog, restarted 
       Reply  Fri Aug 13 13:11:30 2010, Dmass, Update, elog, restarted 
Entry  Fri Aug 13 09:41:00 2010, nancy, Omnistructure, Computers, Charger for dell laptop 
Entry  Fri Aug 13 01:53:12 2010, Gopal, Update, Optic Stacks, Gravity Implementation Confirmed Pendulum_Length.pngPendulum_Length.pngPendulum_Length.png
Entry  Thu Aug 12 23:49:04 2010, nancy, Update, Environment, Laser chiller temp raised 
Entry  Wed Aug 4 16:52:59 2010, Razib, Aidan, Update, Phase Camera, Sideband power measurement (updated) Setup_08_04_2010.jpgpower_40MHz.pngpower_25MHz.png
    Reply  Thu Aug 12 16:52:02 2010, Razib, Update, Phase Camera, Sideband power measurement (updated) SCR.jpgDC_sig_sideband_profile.jpgsideband_profile.jpgsine_trig.jpgsine_trig.jpg
       Reply  Thu Aug 12 17:10:07 2010, Koji, Update, Phase Camera, Sideband power measurement (updated) 
          Reply  Thu Aug 12 17:28:28 2010, Razib, Update, Phase Camera, Sideband power measurement (updated) 
Entry  Thu Aug 12 10:56:31 2010, steve, Update, Environment, dusty floor work in progres 
    Reply  Thu Aug 12 16:18:46 2010, steve, Update, Environment, tiles and adhesive removed P1060604.JPGP1060606.JPGP1060603.JPGP1060610.JPGDSC_2388.JPG
Entry  Thu Aug 12 16:18:00 2010, Jenna, Update, Electronics, Rb clocks overnight rbcomp.pdf
Entry  Thu Aug 12 11:59:31 2010, kiwamu, HowTo, CDS, set up ntp daemom 
Entry  Thu Aug 12 11:39:27 2010, Zach, Update, elog, elog restarted 
Entry  Wed Aug 11 16:56:00 2010, Koji, Summary, Environment, Covering of the IFO IMG_2732.jpg
Entry  Wed Aug 11 15:27:16 2010, Jenna, Update, Electronics, Rubidium clock phase noise 08_11_Rb_withspec.pdf
    Reply  Wed Aug 11 16:38:02 2010, Jenna, Update, Electronics, Rubidium clock phase noise 
Entry  Wed Aug 11 16:13:59 2010, Jenna, Update, elog, elog restarted 
Entry  Wed Aug 11 13:28:44 2010, josephb, Update, CDS, New cdsIPCx parts, old part breaks models 
Entry  Wed Aug 11 12:58:56 2010, Jenna, Update, Electronics, Rubidium clock phase noise 08_11_Rb_crazybox.pdf08_11_Rb_comparison.pdf
Entry  Wed Aug 11 11:51:45 2010, Gopal , Update, WIKI-40M Update, 8.5.10 - 8.11.10 Weekly Update 
Entry  Wed Aug 11 02:44:37 2010, Zach, Update, elog, elog restarted 
Entry  Wed Aug 4 01:44:56 2010, Koji, Configuration, PEM, Accelerometer located on and below the PSL table IMG_2675.jpgIMG_2678.jpgIMG_2682.jpg
    Reply  Tue Aug 10 22:40:55 2010, Koji, Summary, PEM, Accelerometer located on and below the PSL table PEM_100809.pdf
Entry  Tue Aug 10 17:21:48 2010, steve, Update, General, PSL optical table is at 30" height P1060586.JPGP1060583.JPGP1060591.JPGP1060593.JPGP1060597.JPG
Entry  Tue Aug 10 16:55:38 2010, Jenna, Update, Electronics, c1iovme restarted 
Entry  Tue Aug 10 15:23:35 2010, Jenna, Update, Electronics, Rubidium clock time constant 
Entry  Tue Aug 10 05:56:07 2010, Koji, Update, PSL, PSL Table Lifting Preparation IMG_2686.jpgIMG_2691.jpgIMG_2692.jpgIMG_2711.jpg
Entry  Tue Aug 10 01:05:17 2010, Zach, Update, elog, elog restarted 
Entry  Mon Aug 9 13:32:02 2010, nancy, Update, IOO, Mode Cleaner ASC 6x
    Reply  Mon Aug 9 15:54:43 2010, Koji, Update, IOO, Mode Cleaner ASC 
       Reply  Mon Aug 9 21:50:50 2010, nancy, Update, IOO, Mode Cleaner ASC 
Entry  Wed Aug 4 11:10:28 2010, nancy, Update, IOO, Mode Cleaner WFS 
    Reply  Wed Aug 4 12:49:42 2010, nancy, Update, IOO, Mode Cleaner WFS 6x
       Reply  Thu Aug 5 01:29:39 2010, nancy, Update, IOO, Mode Cleaner WFS 
          Reply  Thu Aug 5 11:48:52 2010, nancy, Update, IOO, Mode Cleaner WFS 
             Reply  Thu Aug 5 13:05:53 2010, Koji, Update, IOO, Mode Cleaner WFS 
                Reply  Fri Aug 6 10:44:55 2010, nancy, koji, Update, IOO, Mode Cleaner WFS 
                   Reply  Fri Aug 6 12:33:10 2010, Koji, Update, IOO, Mode Cleaner WFS 
                      Reply  Mon Aug 9 12:46:24 2010, Nancy, Update, IOO, Mode Cleaner WFS 
Entry  Sat Aug 7 21:57:56 2010, rana, Summary, DMF, seisBLRMS restarted Untitled.png
Entry  Sat Aug 7 21:09:59 2010, Dmass, Configuration, Computer Scripts / Programs, eLog changes 
Entry  Sat Aug 7 11:07:44 2010, Koji, Configuration, PSL, MC kept locked / PMC control gain reduced to +13dB 
Entry  Sat Aug 7 10:47:38 2010, Koji, Summary, elog, elog restarted / source of the trouble eliminated 
Entry  Thu Aug 5 00:17:41 2010, Koji, Update, PSL, PSL preparation work 
    Reply  Thu Aug 5 22:36:11 2010, Koji, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 20:00:03 2010, Koji, Update, PSL, PSL preparation work PSL_cable_map.pdf
Entry  Fri Aug 6 15:50:29 2010, Gopal, Update, Optic Stacks, (Much Better Looking) Displacement-Displacment Transfer Functions MC1_MC3_XTrans.pngMC1_MC3_YTrans.pngMC1_MC3_ZTrans.png
    Reply  Fri Aug 6 19:46:59 2010, Gopal, Update, Optic Stacks, (Much Better Looking) Displacement-Displacment Transfer Functions 
Entry  Sat Jul 24 13:13:41 2010, rana, steve, alberto, Update, General, Initial Crane Inspection reveals flaws: wiring and oil 
    Reply  Mon Jul 26 10:04:24 2010, steve, Update, General, Initial Crane Inspection reveals flaws: wiring, oil and imbalance 2500.JPGsedrum.JPG
       Reply  Wed Jul 28 16:42:21 2010, steve, Update, General, Crane gear box cheched P1060503.JPGP1060511.JPGP1060515.JPGP1060517.JPG
          Reply  Fri Aug 6 17:47:36 2010, steve, Summary, General, cranes load tested at 1998 lbs 0.9ton.PDFP1060523.JPGP1060532.JPGP1060541.JPG
Entry  Thu Aug 5 16:18:37 2010, Alastair, Update, General, clocks still not locked fully - hut removed 
    Reply  Fri Aug 6 16:20:08 2010, rana, Update, General, clocks still not locked fully - phase shifted Untitled.pdf
Entry  Fri Aug 6 12:22:04 2010, Jenne, Update, IOO, MC data taking over the weekend 
    Reply  Fri Aug 6 12:44:29 2010, Koji, Update, IOO, MC data taking over the weekend 
Entry  Thu Aug 5 17:59:23 2010, Koji, Update, PSL, Cable removal from the control room IMG_2684.jpg
Entry  Wed Aug 4 20:58:22 2010, Gopal, Update, WIKI-40M Update, 7.28.10 - 8.4.10 Weekly Update 
Entry  Wed Aug 4 20:15:07 2010, Jenne, Update, PEM, Yay! Guralps work again! 
Entry  Wed Aug 4 19:50:58 2010, rana, Configuration, Electronics, Rubidium clocks too hot: hut removed beat.png
Entry  Tue Aug 3 11:50:16 2010, Jenne, Update, PEM, Seismometer Problem Tracked down 
    Reply  Wed Aug 4 03:01:56 2010, Jenne, Update, PEM, Catastrophic Cable Failures 
Entry  Sat Jul 31 17:37:36 2010, josephb, Update, CDS, Cables needed for CDS test 
    Reply  Tue Aug 3 11:17:10 2010, kiwamu, Update, CDS, Diagrams for Cables needed for CDS test sus_wiring.pngsus_new_wiring.pngsus_missing_stuff.png
ELOG V3.1.3-