40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 124 of 339  Not logged in ELOG logo
ID Date Authorup Type Category Subject Text Attachments
  12523   Thu Sep 29 16:19:29 2016 LydiaUpdateSUSFree swing eigenmodes[Lydia, Teng]

Motivated by the strange pitch/yaw
coupling behavior we ran into while doing
 05.pngSUS_eigenmodes.png 
  12536   Thu Oct 6 15:42:51 2016 LydiaUpdateSUSOutput matrix diagonalizationSummary: At the 40m meeting yesterday,
Eric Q. gave the suggestion that we
accept the input matrix weirdness and adjust
  
  12554   Wed Oct 12 18:09:25 2016 LydiaUpdateGeneralAcromag Progress[Lydia, Johannes]

Johannes acquired a crate to contain
the Acromag setup and wiring, and installed
  
  12598   Thu Nov 3 16:30:42 2016 LydiaConfigurationSUSETMX to coil matrix expanded[ericq, lydia]

Background: 

We believe the optimal OSEM damping
 01.png 
  12599   Fri Nov 4 18:31:05 2016 LydiaUpdateCDSc1auxex channels/pins for AcromagHere are the channels we are planning to
switch over from c1auxex to Acromag,
and their current pin numbers on the existing
  
  12607   Tue Nov 8 17:51:09 2016 LydiaUpdateCDSacromag chassis hooked up to PSLWe set up the chassis in 1X7 today. Steve
is ordering a longer 25 pin cable to reach.
Until then the PSL diagnostic channels will
  
  12612   Sun Nov 13 23:42:43 2016 LydiaUpdateSUSETMX output matrix data I took data of the ETMX SUSPOS, SUSPIT
and SUSYAW channels while driving each of
the 4 face coils. I manually turned off all
  
  12649   Wed Nov 30 11:56:56 2016 LydiaUpdateCDSWiring for Acromag auxex replacementI've attached a schematic for how we
will connect the Acromag mosules to the slow
channel I/O curently going to c1auxex. The
 auxex_acromag.pdf 
  12677   Wed Dec 14 19:16:57 2016 LydiaUpdateCDSAcromag Binary I/O testingI looked into converting the QPD whitening
switches for the X end to Acromag.


To test this out and be
  
  12755   Wed Jan 25 15:41:29 2017 LydiaUpdateIMC29.5 MHz modulation depth measurement plan[Lydia, gautam]

To measure the modulation depth
of the 29.5 MHz sideband, we plan to connect
  
  12762   Fri Jan 27 17:07:52 2017 LydiaUpdateCDSslow machine bootfestRebooted c1iscaux,
c1auxex and c1auxey which were all
not reponding to telnet. The watchdogs for
  
  12767   Fri Jan 27 21:25:11 2017 LydiaUpdateIMC29.5 MHz modulation depth [gautam, Lydia]

We set out to measure the 29.5
MHz power going to the EOM today but decided
  
  12772   Tue Jan 31 01:07:20 2017 LydiaUpdateIMCRF AM stabilization box pulled out[gautam, Lydia]

We looked at the RF AM stabilizer
box to see if we could find out 1) Why the
 AM_stablilizer_annotation.pdf 
  12782   Tue Jan 31 22:28:39 2017 LydiaUpdateIMCRF AM stabilization box pulled out[rana, gautam, lydia]

Today we looked at the schematics
for the RF AM stabilizer box and decided
 AM_noise.pdf 
  12784   Wed Feb 1 16:45:56 2017 LydiaUpdateIMCRF AM stabilizer box Modification PlanHere's what I'm planning to do
to the RF AM stabilizer box. I'm
going to take out several of the components
 RF_AM_stabilizer_modification.pdf 
  12786   Wed Feb 1 23:13:30 2017 LydiaUpdateIMCRF AM stabilizer box Modification PlanI made some of the changes. Gautam and
I will finish tomorrow. 

While I was soldering the sharpest
  
  12801   Sun Feb 5 21:56:50 2017 LydiaUpdateIMC29.5 MHz stabilizer box replacementSince the "stablizer box" doesn't
really need to stabilize, it just needs to
amplify, I decided to replace it with an
  
  12807   Tue Feb 7 12:01:10 2017 LydiaUpdateIMC29.5 MHz stabilizer box replacementI tested the amplifier with the Agilent
network analyzer and measured 19.5 dB
of gain between 29 and 30 mHz. The phase
 RF_amp.pdf 
  12809   Tue Feb 7 17:00:55 2017 LydiaUpdateIMC29.5 MHz stabilizer box replacementI set everything up and connected it as
shown on the block diagram attached to the
previous entry, with the exception
  
  12817   Fri Feb 10 11:41:43 2017 LydiaUpdateIMC29.5 MHz stabilizer box replacementTo install the replacement amplifier, I
did the following:


Mounted the amplifier in
  
  12827   Mon Feb 13 19:44:55 2017 LydiaUpdateIMCFront panel for 29.5 MHz amplifier boxI made a tentative front panel design for
the newly installed amplifier box. I used
this chassis
 rfAmp.pdf 
  12832   Wed Feb 15 22:21:12 2017 LydiaUpdateDAQpanels and pcbsThis is already how it's hooked up.
The hole on the from that says +24 V is for
an indicator light.
  
  12861   Wed Mar 1 21:15:40 2017 LydiaUpdateIMCFront panel for 29.5 MHz amplifier box
I installed the front panel today.
While I had the box out I also replaced
 RF_amp_(1).pdf 
  12865   Thu Mar 2 20:32:18 2017 LydiaUpdateIMCFront panel for 29.5 MHz amplifier box[gautam, lydia]

I pulled out the box and found
the problem: the +24 V input to the amplifier
  
  12713   Fri Jan 13 14:33:00 2017 MAX (not Rana)UpdateSummary PagesDecember outagePEM config file was also lacking a section
named "summary", which is necessary
for all parent tabs; this has now been solved.
  
  5760   Fri Oct 28 20:39:19 2011 MIrkoUpdateLSCRFAM monitor in place. ( Uncalibrated ) EPICS troubles{Suresh, Jamie, Mirko]
We adapted the Stochmon box to include
LP filters at 1.8Hz behind the RMS parts.
 MC_DC11MHz.mMC_DC29MHz.mMC_DC55MHz.mRFAMPD.c 
  5810   Fri Nov 4 14:18:24 2011 MIrkoUpdateAdaptive FilteringCoherence between seismometers and MC lengthLooking into the coherence between the
seismometers and IMC length (MC_F):
FIrst with the seismometers only
 Coherence_without_compensation.pngWith_Pend_compensation.matCoherence_with_compensation.png 
  5928   Thu Nov 17 17:03:28 2011 MIrkoUpdateIOOMC noise projectionAnother go at the noise projection from
MC1-3 pit/yaw to MC length. This  time injecting
into the MC autoalignment FB (e.g. C1:IOO-WFS1_PIT_EXC
 11x 
  7090   Mon Aug 6 11:07:06 2012 ManasaUpdate40m UpgradingOptical layout updatedACAD files of the 40m optical layout have
been updated as per the vent in Aug 2011.
Files are available at the 40m svn
  
  7122   Wed Aug 8 19:54:06 2012 ManasaConfigurationIOOMC trans optics configuredJan and I wanted to measure the ringdown
at the IMC. Since the QPD at the MC trans
is not fast enough for ringdown measurements,
 Pic1.png 
  7125   Wed Aug 8 20:51:56 2012 ManasaUpdate40m UpgradingOptical layout updated

    

       
            
  
  7127   Wed Aug 8 22:17:43 2012 ManasaConfigurationIOOMC trans optics configured

    

       
            
  
  7140   Fri Aug 10 09:54:51 2012 ManasaConfigurationIOOMC trans optics configured

    

       
            
  
  7144   Fri Aug 10 15:05:52 2012 ManasaConfigurationIOOMC trans optics configured

    

       
            
  
  7159   Mon Aug 13 12:17:41 2012 ManasaConfigurationIOOPD from AP table removedThe PD (pda255) at the AP table, close
to the MC refl , which Steve mentioned to
be not in use, has been removed from the
  
  7164   Mon Aug 13 19:29:10 2012 ManasaSummary Ringdown measurementsI tried to make ringdown measurements at
the IMC using the DC falling edge as the
trigger. Input to the MC was switched off
  
  7200   Wed Aug 15 20:53:48 2012 ManasaUpdateIOORingdown measurements

    

       
            
  
  7205   Thu Aug 16 16:44:55 2012 ManasaConfigurationIOOPD from AP table removed

    

       
            
  
  7206   Thu Aug 16 17:28:51 2012 ManasaConfigurationIOOMC trans optics configured

    

       
            
  
  7222   Fri Aug 17 18:49:55 2012 ManasaUpdate40m UpgradingOptical layout updated

    

       
            
  
  7245   Tue Aug 21 18:23:58 2012 ManasaUpdate40m UpgradingETMX table layoutOptical layout of the current endtable
at ETMX has been updated in the svn repository
(directory: 40M_Optical Layout). This layout
  
  7256   Thu Aug 23 12:17:39 2012 ManasaUpdate IMC RingdownThe ringdown measurements are in progress.
But it seems that the MC mirrors are getting
kicked everytime the cavity is unlocked by
 mozilla.pdfMC_sus.pdf 
  7260   Thu Aug 23 17:51:25 2012 ManasaUpdate IMC Ringdown

    

       
            
  
  7330   Fri Aug 31 17:44:21 2012 ManasaUpdateRingdownData

    

       
            
 cum_plot.png 
  7336   Tue Sep 4 13:44:17 2012 ManasaUpdateGeneralThe Plan

    

       
            
  
  7354   Thu Sep 6 19:21:58 2012 ManasaConfiguration40m UpgradingBaffle problemFor the current baffle (dia. 40mm) centered
along the beamline place at 1.77" from
the test mass, the baffle will allow ~8.6mm
 bfl.png 
  7359   Fri Sep 7 11:58:12 2012 ManasaConfiguration40m UpgradingBaffle problem

    

       
            
 bfl.png 
  7361   Fri Sep 7 13:01:53 2012 ManasaConfiguration40m UpgradingBaffle problem

    

       
            
 Picture1.png 
  7403   Tue Sep 18 20:32:42 2012 ManasaConfigurationPSLAOM installation {Jan, Manasa}
We tried towards calibrating the
RF driver of the AOM. We decided to use the
  
  7409   Wed Sep 19 11:39:37 2012 ManasaConfigurationPSLAOM installation

    

       
            
 ALC_25.png 
ELOG V3.1.3-