40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 122 of 354  Not logged in ELOG logo
ID Date Author Type Categoryup Subject Text Attachments
  446   Thu Apr 24 23:50:10 2008 ranaUpdateGeneralSyringes in George the FreezerThere are some packets of syringes in the
freezer which are labeled as belonging to
an S. Waldman.
  
  478   Thu May 15 10:40:21 2008 steveHowToGeneralLisa Goggin, PhDLisa Goggin successfully defended her thesis
on May, 13 2008
 lisa.JPG 
  483   Fri May 16 17:27:55 2008 AndreyOmnistructureGeneralToilets are broken, do not use them !!!
[COLOR=red][SIZE=4] Both toilets in 40-meter
were constantly flushing, the leaking water
  
  494   Fri May 23 21:21:52 2008 CarynSummaryGeneralfiltering mode cleaner with wiener filterI tried filtering some saved MC_L data (from
Mon May19 4:30pm) with multiple MISO filters
of different orders, with various sampling
 10x 
  546   Thu Jun 19 20:22:03 2008 ranaUpdateGeneralFE Computer StatusI called Rolf (@LLO) who called Alex (@MIT)
who suggested that we power cycle every crate
  
  551   Sun Jun 22 21:38:49 2008 robHowToGeneralIFO CONFIGURE
Now that we're getting back into locking,
it's nice to have a stable alignment of the
  
  555   Mon Jun 23 21:51:19 2008 AlbertoUpdateGeneralArm Cavity Length MeasurementWe measured the arm cavity lengths sweeping
the ETM mirror position and looking at the
reflected demodulated output. We excited
 40mLengthMeasure.pdf 
  556   Tue Jun 24 10:24:43 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Cavity Swing Measurement (2)At the entry 555, Alberto reported the results
of the cavity length measurement using cavity
sweeping.
 armlength.pngarmlength2.png 
  561   Wed Jun 25 00:35:40 2008 KojiSummaryGeneralOptical Layout on the AP tableI have visited the AP table in order to investigate
where we are going to put the optical setup
for the abs. length meas. 
 optical_layout_ap_table.pngoptical_layout_ap_table.pdf 
  567   Wed Jun 25 13:38:22 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Placement of the 700mW NPRO on the AP tableThis morning I have put the 700mW NPRO on
the AP table for the abs length measurement.
 NPRO700mW_placement.jpg 
  570   Thu Jun 26 01:08:22 2008 ranaConfigurationGeneralAlarm Handler RevivedI have revived the Alarm Handler by turning
it on on op540m and adjusting the levels
of
 b.gif 
  574   Thu Jun 26 14:06:00 2008 MashaUpdateGeneral500mW INNOLIGHT NPRO infoBelow is the placement of 500mW INNOLIGHT
NPRO mephisto laser. It is set up on the
Symmetric Port table. [IMG]elog:574/1[/IMG]
 500mW_NPRO.JPG 
  590   Sun Jun 29 02:33:28 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Optical setup (I)I have constructed the beam injection optics
for the abs length measurement.
 optical_configuration.pngoptical_layout_ap_table2.pngoptical_layout_ap_table2.pdf 
  599   Mon Jun 30 05:33:38 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Optical setup (II)o The position of the iris was adjusted so
as not to disturub the beam for OMCR CCD.
  
  613   Tue Jul 1 12:51:34 2008 JohnSummaryGeneralIFO alignmentRana, Rob, Yoichi, John

The recent computer problems and MZ work
 align080701.png 
  619   Tue Jul 1 21:54:05 2008 KojiUpdateGeneralRe: Abs. Length Meas. setupI tried to look for the beating in the signal
from the PD but I couldn't find. I had the
temperature of the laser initially set to
  
  621   Wed Jul 2 06:46:05 2008 AlbertoConfigurationGeneralNPRO on to warm upThis morning I turned on the NPRO on the AP
table so that it can warm up for a few hours
before I start using it today.
  
  624   Wed Jul 2 15:14:42 2008 steveUpdateGeneraladded beam trapsI placed baked razor beam trap after INJ_SM1
and flipper in the injection path on the
AP table
  
  627   Wed Jul 2 19:15:52 2008 AlbertoUpdateGeneralStatus of the alignment of the NPRO beam for the Absolute Length MeasurementToday I've tried to bring the frequency of
the NPRO laser close enough to that of the
IFO beam so that the beat between the two
 DSC_0156.JPGDSC_0158.JPG 
  628   Thu Jul 3 11:53:30 2008 KojiUpdateGeneralStatus of the alignment of the NPRO beam for the Absolute Length MeasurementThe method itself looked fine.

Use of the one arm configuration will make
  
  633   Thu Jul 3 16:57:23 2008 JohnSummaryGeneralFSS_RMTEMPThe FSS room temp alarm has been beeping a
lot recently. I altered the FSS_RMTEMP alarm
levels using the
 FSStime.pngFSSalarm.png 
  634   Thu Jul 3 18:48:09 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I adjusted the alignment of the flipper mirror
as suggested by Koji making the two beam
spots match. I also aligned all the IFO mirrors
  
  635   Thu Jul 3 22:54:45 2008 KojiUpdateGeneralBeats of the two lasers in the absolute length measurement observed Great! Conguraturation! I wish if I could
see it! It's nice if you can put the photo
or anything of the RF spectrum analyzer.
  
  637   Mon Jul 7 11:22:02 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I didn't post a screenshot from the RF SA
because I had troubles with the interface
with the computer (unfortunately the network
  
  638   Mon Jul 7 13:06:38 2008 KojiUpdateGeneralBeats of the two lasers in the absolute length measurement observed One may need an RF filter after the mixer.
I expect the SR560 does work for this purpose.
If it does not, a passive LPF can be used.
  
  643   Mon Jul 7 19:15:38 2008 AlbertoUpdateGeneralOptics alignement on the ABS length experimentToday I started setting up the PLL instruments
to lock the frequency of the NPRO beam to
the IFO beam. with no need of a new alignment
  
  650   Tue Jul 8 21:58:22 2008 albertoUpdateGeneralSecondaty beam aligned to the IFO beam againYesterday the alignment of the secondary beam
to the IFO was completely lost and today
I had to realign all the optics before I
  
  653   Wed Jul 9 17:58:19 2008 JohnSummaryGeneralIlluminator alarmsThis morning some time was wasted on alignment
due to the illuminators.
  
  656   Thu Jul 10 19:12:07 2008 AlbertoUpdateGeneralabs cavity length measurement experimentYesterday morning, when I started, I found
the IFO beam on a different position and
the beam spot at the AS port looked very
  
  664   Sun Jul 13 22:39:16 2008 JohnSummaryGeneralEdited medm screens I've edited the FSS and PMC screens so that
red boxes are shown around the appropriate
slider if a gain or offset is not within
  
  668   Mon Jul 14 19:15:43 2008 AlbertoUpdateGeneralabs cavity length measurement experimentLately I've been dealing with the alignment
of the interferometer to have a good beam
spot at the AS port. Today the alignment
  
  669   Mon Jul 14 21:34:10 2008 AlbertoUpdateGeneralabs cavity length measurement experiment[quote]Lately I've been dealing with the alignment
of the interferometer to have a good beam
spot at the AS port. Today the alignment
  
  674   Tue Jul 15 12:23:22 2008 JenneUpdateGeneralMC2 Watchdog trippedAlberto, Jenne

Mode Cleaner was unlocked.  We checked, and
  
  683   Wed Jul 16 16:59:07 2008 AlbertoUpdateGeneralAligmentI think the two beams are aligned again -
they both pass the Faraday, they match at
the irises and all along the optical path
  
  687   Thu Jul 17 00:59:18 2008 JenneSummaryGeneralFunny signal coming out of VCOWhile working on calibrating the MC_F signal,
Rana and I noticed a funny signal coming
out of the VCO.  We expect the output to
 VCOout_time.PNGVCOout_freq.PNG 
  706   Mon Jul 21 11:54:00 2008 JenneUpdateGeneralMC Servo BoardI pulled the MC Servo Board again, to check
the components that are on the board, and
compare them with the schematics.  The filters
  
  727   Wed Jul 23 21:48:30 2008 robConfigurationGeneralrestore IFO when you're done with it
[SIZE=3][B]when you are done with the IFO,
please click "Restore last auto-alignment"[/B][/SIZE]
  
  738   Fri Jul 25 10:48:13 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Realignment / beating / PLL trialAlberto and Koji

o We worked for the abs length measurement
  
  748   Mon Jul 28 15:54:04 2008 KojiUpdateGeneralAbs. Len. Meas. ~ More on the beat / the PLL setupAlberto and Koji,

Last Friday evening, Koji found that the
 PLL_setup.pngbeat_at_8MHz.jpg 
  774   Thu Jul 31 10:24:32 2008 KojiUpdateGeneralIFO statusLast night I used the Y-arm for the abs length
measurement. The Yarm was aligned by the
script. 
  
  776   Thu Jul 31 11:19:30 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Resonance search trialLast night, I tried to find the resonance
of Yarm by sweeping the frequency of the
injection beam.
  
  782   Sat Aug 2 12:53:43 2008 KojiUpdateGeneralAbs. Len. Meas. ~ New PLL at the PSL table[B]Report of the work last night:[/B]
The new heterodyne interferometer on the
PSL table was built.
 yarm_dc.png 
  783   Sat Aug 2 13:07:23 2008 KojiConfigurationGeneralThe AP table cleanedDuring the construction of the independent
PLL I cleaned up some of the unused optics
from the AP table. Essentially this should
  
  787   Mon Aug 4 00:37:58 2008 KojiUpdateGeneralAbs. Len. Meas. ~ RF PD at the Y end / Manual frequency scan[B]Work log on August 2nd[/B]

o Just remind you:
 YEND_LAYOUT.png4th_FSR1.png4th_FSR2.png 
  788   Mon Aug 4 00:56:07 2008 KojiHowToGeneralAbs. Len. Meas. ~ Auto freq scanner with GPIB[B]Work log on August 3rd  - Part1[/B]

o Yesterday I was too much tired of changing
 freq_scan.png 
  789   Mon Aug 4 05:23:57 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Measurement for Y-arm completedFinally, I have completed the abs length and
g-factor measurements for Y-arm.
[COLOR=green][B]>>>GO FOR THE VENT<<<[/B][/COLOR]
  
  793   Mon Aug 4 21:48:24 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Scan for TEM00/01/10[B]Work log on August 3rd  - Part2[/B]

o I tried to measure the frequency of the
 TEM00.pngTEM01.pngknife_edge.png 
  794   Mon Aug 4 22:31:10 2008 KojiUpdateGeneralAbs. Len. Meas. ~ Simple Test for TEM01/10 split[B]Work log on August 3rd - Part3[/B]

[B]Question:[/B]
 TEM01_10.png 
  795   Tue Aug 5 00:05:57 2008 KojiUpdateGeneralAbs. Len. Meas. ~ IFR2023A calibration[B]Work log on August 4th[/B]

o IFR2023A (Marconi) was calibrated by the
  
  796   Tue Aug 5 02:39:55 2008 KojiConfigurationGeneralAbs. Len. Meas. ~ Optical Layout on the AP / PSL table 2008-Aug-05Here are the PDF and the PNG of the AP and
PSL table layouts.
After this photo, the squeezing setup at
 optical_layout_ap_table3.pngoptical_layout_ap_table3.pdfoptical_layout_PSL_table1.pngoptical_layout_PSL_table1.pdf 
ELOG V3.1.3-