Entry  Wed Aug 11 16:13:59 2010, Jenna, Update, elog, elog restarted 
Entry  Wed Aug 11 13:28:44 2010, josephb, Update, CDS, New cdsIPCx parts, old part breaks models 
Entry  Wed Aug 11 12:58:56 2010, Jenna, Update, Electronics, Rubidium clock phase noise 08_11_Rb_crazybox.pdf08_11_Rb_comparison.pdf
Entry  Wed Aug 11 11:51:45 2010, Gopal , Update, WIKI-40M Update, 8.5.10 - 8.11.10 Weekly Update 
Entry  Wed Aug 11 02:44:37 2010, Zach, Update, elog, elog restarted 
Entry  Wed Aug 4 01:44:56 2010, Koji, Configuration, PEM, Accelerometer located on and below the PSL table IMG_2675.jpgIMG_2678.jpgIMG_2682.jpg
    Reply  Tue Aug 10 22:40:55 2010, Koji, Summary, PEM, Accelerometer located on and below the PSL table PEM_100809.pdf
Entry  Tue Aug 10 17:21:48 2010, steve, Update, General, PSL optical table is at 30" height P1060586.JPGP1060583.JPGP1060591.JPGP1060593.JPGP1060597.JPG
Entry  Tue Aug 10 16:55:38 2010, Jenna, Update, Electronics, c1iovme restarted 
Entry  Tue Aug 10 15:23:35 2010, Jenna, Update, Electronics, Rubidium clock time constant 
Entry  Tue Aug 10 05:56:07 2010, Koji, Update, PSL, PSL Table Lifting Preparation IMG_2686.jpgIMG_2691.jpgIMG_2692.jpgIMG_2711.jpg
Entry  Tue Aug 10 01:05:17 2010, Zach, Update, elog, elog restarted 
Entry  Mon Aug 9 13:32:02 2010, nancy, Update, IOO, Mode Cleaner ASC 6x
    Reply  Mon Aug 9 15:54:43 2010, Koji, Update, IOO, Mode Cleaner ASC 
       Reply  Mon Aug 9 21:50:50 2010, nancy, Update, IOO, Mode Cleaner ASC 
Entry  Wed Aug 4 11:10:28 2010, nancy, Update, IOO, Mode Cleaner WFS 
    Reply  Wed Aug 4 12:49:42 2010, nancy, Update, IOO, Mode Cleaner WFS 6x
       Reply  Thu Aug 5 01:29:39 2010, nancy, Update, IOO, Mode Cleaner WFS 
          Reply  Thu Aug 5 11:48:52 2010, nancy, Update, IOO, Mode Cleaner WFS 
             Reply  Thu Aug 5 13:05:53 2010, Koji, Update, IOO, Mode Cleaner WFS 
                Reply  Fri Aug 6 10:44:55 2010, nancy, koji, Update, IOO, Mode Cleaner WFS 
                   Reply  Fri Aug 6 12:33:10 2010, Koji, Update, IOO, Mode Cleaner WFS 
                      Reply  Mon Aug 9 12:46:24 2010, Nancy, Update, IOO, Mode Cleaner WFS 
Entry  Sat Aug 7 21:57:56 2010, rana, Summary, DMF, seisBLRMS restarted Untitled.png
Entry  Sat Aug 7 21:09:59 2010, Dmass, Configuration, Computer Scripts / Programs, eLog changes 
Entry  Sat Aug 7 11:07:44 2010, Koji, Configuration, PSL, MC kept locked / PMC control gain reduced to +13dB 
Entry  Sat Aug 7 10:47:38 2010, Koji, Summary, elog, elog restarted / source of the trouble eliminated 
Entry  Thu Aug 5 00:17:41 2010, Koji, Update, PSL, PSL preparation work 
    Reply  Thu Aug 5 22:36:11 2010, Koji, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work 
       Reply  Fri Aug 6 20:00:03 2010, Koji, Update, PSL, PSL preparation work PSL_cable_map.pdf
Entry  Fri Aug 6 15:50:29 2010, Gopal, Update, Optic Stacks, (Much Better Looking) Displacement-Displacment Transfer Functions MC1_MC3_XTrans.pngMC1_MC3_YTrans.pngMC1_MC3_ZTrans.png
    Reply  Fri Aug 6 19:46:59 2010, Gopal, Update, Optic Stacks, (Much Better Looking) Displacement-Displacment Transfer Functions 
Entry  Sat Jul 24 13:13:41 2010, rana, steve, alberto, Update, General, Initial Crane Inspection reveals flaws: wiring and oil 
    Reply  Mon Jul 26 10:04:24 2010, steve, Update, General, Initial Crane Inspection reveals flaws: wiring, oil and imbalance 2500.JPGsedrum.JPG
       Reply  Wed Jul 28 16:42:21 2010, steve, Update, General, Crane gear box cheched P1060503.JPGP1060511.JPGP1060515.JPGP1060517.JPG
          Reply  Fri Aug 6 17:47:36 2010, steve, Summary, General, cranes load tested at 1998 lbs 0.9ton.PDFP1060523.JPGP1060532.JPGP1060541.JPG
Entry  Thu Aug 5 16:18:37 2010, Alastair, Update, General, clocks still not locked fully - hut removed 
    Reply  Fri Aug 6 16:20:08 2010, rana, Update, General, clocks still not locked fully - phase shifted Untitled.pdf
Entry  Fri Aug 6 12:22:04 2010, Jenne, Update, IOO, MC data taking over the weekend 
    Reply  Fri Aug 6 12:44:29 2010, Koji, Update, IOO, MC data taking over the weekend 
Entry  Thu Aug 5 17:59:23 2010, Koji, Update, PSL, Cable removal from the control room IMG_2684.jpg
Entry  Wed Aug 4 20:58:22 2010, Gopal, Update, WIKI-40M Update, 7.28.10 - 8.4.10 Weekly Update 
Entry  Wed Aug 4 20:15:07 2010, Jenne, Update, PEM, Yay! Guralps work again! 
Entry  Wed Aug 4 19:50:58 2010, rana, Configuration, Electronics, Rubidium clocks too hot: hut removed beat.png
Entry  Tue Aug 3 11:50:16 2010, Jenne, Update, PEM, Seismometer Problem Tracked down 
    Reply  Wed Aug 4 03:01:56 2010, Jenne, Update, PEM, Catastrophic Cable Failures 
Entry  Sat Jul 31 17:37:36 2010, josephb, Update, CDS, Cables needed for CDS test 
    Reply  Tue Aug 3 11:17:10 2010, kiwamu, Update, CDS, Diagrams for Cables needed for CDS test sus_wiring.pngsus_new_wiring.pngsus_missing_stuff.png
Entry  Tue Aug 3 03:15:06 2010, nancy, Update, IOO, MC back to locked mode 
Entry  Mon Aug 2 18:02:46 2010, Jenne, Update, PEM, Seismometer Update: Still not good, but perhpas getting better 
    Reply  Tue Aug 3 01:51:01 2010, Jenne, Update, PEM, Seismometer Update: Still not good, but perhaps getting better 
Entry  Mon Aug 2 21:52:57 2010, Koji, Update, IOO, MC is running at the full power 
Entry  Mon Aug 2 17:12:28 2010, Koji, Update, General, Lab schedule for the week of Aug. 2 PSL_work_schedule.pdf
Entry  Fri Jul 30 09:55:34 2010, steve, Configuration, VAC, slow pumpdown has started slowpd5hr.jpg
    Reply  Fri Jul 30 17:54:55 2010, steve, HowTo, VAC, How to stop and start slow pumpdown 
       Reply  Fri Jul 30 22:07:42 2010, Koji, HowTo, VAC, How to stop and start slow pumpdown 
          Reply  Sat Jul 31 10:12:05 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
             Reply  Sat Jul 31 14:59:33 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
    Reply  Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed veryslowpd.jpg
Entry  Sun Aug 1 21:40:27 2010, rana, Summary, PSL, FSS: SLOWDC response Untitled.png
Entry  Sun Aug 1 21:04:45 2010, rana, Summary, Computer Scripts / Programs, MC Autolocker fixed 
Entry  Sat Jul 31 22:35:01 2010, Koji, Update, VAC, Vac-P1 still 1.2mtorr 
    Reply  Sun Aug 1 18:50:35 2010, Koji, Update, VAC, P1 = 0.48 torr 
Entry  Sat Jul 31 04:03:11 2010, Gopal, Summary, Optic Stacks, Complete Displacement Translational Transfer Function Matrix Progress_Report_2.png
Entry  Fri Jul 30 17:52:12 2010, Koji, Configuration, General, Jacket 
    Reply  Fri Jul 30 19:20:15 2010, Alastair, Configuration, General, Jacket 
Entry  Fri Jul 30 17:24:22 2010, Jenne, Update, PEM, Guralps back in the 40m 
Entry  Thu Jul 29 12:31:09 2010, Koji, Summary, General, Lab Schedule PSL_work_schedule.pdf
    Reply  Fri Jul 30 14:53:09 2010, steve, Update, General, PSL table leg upgrade psllegs.PDF
Entry  Fri Jul 30 12:46:38 2010, Koji, Configuration, 40m Upgrading, BS chamber status BS_layout_Jul_29_2010.png
Entry  Wed Apr 21 10:09:23 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals focal_positin_edit.png
    Reply  Tue Apr 27 14:18:53 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals mode_in_PPKTP.png
       Reply  Thu Jul 29 21:13:39 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
          Reply  Thu Jul 29 22:58:25 2010, kiwamu, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
             Reply  Fri Jul 30 00:02:15 2010, Dmass, Update, Green Locking, waist positon of Gaussian beam in PPKTP crystals 
                Reply  Fri Jul 30 09:51:58 2010, kiwamu, Update, Green Locking, Re: waist positon of Gaussian beam in PPKTP crystals efficiency_waist_edit.pngPPKTPmode.pngPSL_doubling.pngmode_in_PPKTP.png
Entry  Thu Jul 29 22:08:32 2010, Alberto, Update, SUS, More optics installed on the BS table 
    Reply  Fri Jul 30 02:54:04 2010, Koji, Update, 40m Upgrading, More optics installed on the BS table 
Entry  Thu Jul 29 20:43:32 2010, Gopal, Summary, Optic Stacks, Modeling Tips and Tilts XTrans_XDisp.pngXTrans_XDisp.pngYTrans_XDisp.pngZTrans_XDisp.png
Entry  Thu Jul 29 15:35:21 2010, josephb, kiwamu, Update, CDS, Working out ADC/DAC/BO wiring 
    Reply  Thu Jul 29 17:12:48 2010, josephb, kiwamu, Update, CDS, Re:Working out ADC/DAC/BO wiring DSC_2302.png
Entry  Thu Jul 29 17:11:16 2010, Gopal, Update, COMSOL Tips, Including Gravity in COMSOL 
Entry  Thu Jul 29 12:31:24 2010, josephb, Update, CDS, Working DAC, working IOP - next up SUS Simple_Green_Control.png
Entry  Thu Jul 29 12:13:28 2010, kiwamu, Summary, CDS, near term plan current_setup_v2.png
Entry  Thu Jul 29 11:33:38 2010, kiwamu, Update, CDS, PCI5565 driver for RFM 
Entry  Mon Jul 26 20:12:18 2010, kiwamu, Update, SUS, OSEMs on PRM DSC_2279.JPG
    Reply  Tue Jul 27 21:38:21 2010, kiwamu, Update, SUS, installation of in-vac optics DSC_2284.JPGDSC_2291.JPG
       Reply  Wed Jul 28 17:32:37 2010, kiwamu, Update, SUS, installation of in-vac optics 
          Reply  Thu Jul 29 10:39:43 2010, kiwamu, Update, SUS, Re: installation of in-vac optics 