40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 11 of 166  Not logged in ELOG logo
Entry  Mon Feb 24 08:36:32 2020, Chub, Update, General, HVAC repair 
Entry  Thu Feb 13 21:30:55 2020, shruti, Update, ALS, ALS OOL noise with arms locked 20200213_ALS.pdf
    Reply  Fri Feb 14 14:02:13 2020, shruti, Update, ALS, ALS OOL noise with arms locked 819472_10.pdf225642_10.pdf693500_10.pdf
       Reply  Fri Feb 14 14:52:41 2020, gautam, Update, ALS, ALS OOL noise with arms locked 
          Reply  Tue Feb 18 18:14:59 2020, shruti, Update, ALS, ALS OOL noise with arms locked ALSNoise.pdf
             Reply  Wed Feb 19 22:20:22 2020, rana, Update, ALS, ALS OOL noise with arms locked 
             Reply  Fri Feb 21 10:59:08 2020, shruti, Update, ALS, PDH error signals? IMG_0082.jpgIMG_0083.jpgIMG_0084.jpgIMG_0085.jpg
                Reply  Fri Feb 21 13:02:53 2020, Koji, Update, ALS, PDH error signals? 
                   Reply  Fri Feb 21 20:44:18 2020, shruti, Update, ALS, ALS OOL noise and PDH ALSNoise.pdfIMG_0086.jpg
                      Reply  Sun Feb 23 18:15:22 2020, rana, Update, ALS, ALS OOL noise and PDH 
Entry  Fri Dec 27 16:26:11 2019, Yehonathan, Update, PSL, PMC Linewidth measurement PMCTransmissionSpectra.pdf
    Reply  Wed Jan 1 14:14:00 2020, Yehonathan, Update, PSL, PMC Linewidth measurement 150MHzSideBandCreation.pdfLinewidthMeasurment.pdf
       Reply  Wed Jan 15 15:04:31 2020, gautam, Update, PSL, PMC Linewidth measurement 
          Reply  Fri Jan 17 22:11:19 2020, Yehonathan, Update, PSL, Ringdown measurements 20200117_192455.jpg20200117_192448.jpg
             Reply  Sat Jan 25 11:54:42 2020, Yehonathan, Update, PSL, Ringdown measurements Input_beam_path.jpgReflected_Beam_Path.jpgTransmitted_Beam_Path.jpgPMCRingdownNormalizedRawdata.pdfTransPDFits.pdf
                Reply  Mon Jan 27 21:35:06 2020, Yehonathan, Update, PSL, Ringdown measurements IMC_REFL_Beam_Path.jpg
                   Reply  Mon Jan 27 21:48:49 2020, gautam, Update, PSL, Ringdown measurements elevatedSeis.pdf
                      Reply  Tue Jan 28 16:01:17 2020, gautam, Update, IOO, IMC WFS servos stable again QPD_recenter.png
                         Reply  Tue Jan 28 20:51:37 2020, Yehonathan, Update, IOO, IMC WFS servos stable again 
                            Reply  Wed Jan 29 12:40:24 2020, Yehonathan, Update, IOO, IMC Ringdowns preliminary data analysis IMCRingdownNormalizedRawdata.pdfIMCTransPDFits.pdf
                               Reply  Mon Feb 3 13:54:10 2020, Yehonathan, Update, IOO, IMC Ringdowns extended data analysis IMCTransReflAnalysis_anotated.pdf
                                  Reply  Wed Feb 5 21:13:17 2020, Yehonathan, Update, IOO, IMC Ringdowns extended data analysis 
                                     Reply  Sat Feb 15 12:56:24 2020, Yehonathan, Update, IOO, IMC Transfer function measurement IMCFrequencyResponse.pdfIMCRingdownNormalizedRawdata.pdfIMCREFLPDFits.pdf
Entry  Thu Feb 13 01:47:39 2020, gautam, Update, ALS, Fast ALS - delay line prep delaySlider.pngdelayLineLosses.pdfdelayLineCal.pdf
    Reply  Fri Feb 14 00:53:50 2020, gautam, Update, ALS, Fast ALS - more setup CMSlow_ALSnoise.pdfOLTFmeas.pdf
Entry  Wed Feb 12 12:13:37 2020, gautam, Update, LSC, AO path attempts CARM_OLTF.pdfPRFPMI_errSigs.pdf
    Reply  Thu Feb 13 02:07:26 2020, gautam, Update, LSC, AO path transfer function measurement AOpathTF.pdfIMCinLoop.pdf
Entry  Tue Feb 11 19:11:35 2020, shruti, Update, Computer Scripts / Programs, MATLAB on donatella 
Entry  Tue Feb 11 16:39:00 2020, shruti, Update, ALS, AM/PM AM.pdfPM.pdfRatio_all.pdfRatios_FM_PM.pdfRatio_all_new.pdf
Entry  Mon Feb 10 15:55:46 2020, Jordan, Update, PSL, PMCTRANSPD ADC1.jpg
Entry  Mon Feb 10 15:54:47 2020, Jordan, Update, PSL, Completed Acromag Wiring 
Entry  Mon Feb 10 15:04:42 2020, Jordan, Update, General, HDMI Routing for new tv  
Entry  Mon Feb 10 10:07:20 2020, gautam, Update, PSL, PMC re-locked PMCunlock.png
Entry  Mon Feb 10 09:40:54 2020, Larry Wallace, Summary, General, SolidWorks Computer Upgrade and Printer repair 
Entry  Fri Feb 7 15:00:16 2020, gautam, Update, LSC, More high BW POY experiments AO_TFs.pdf
    Reply  Fri Feb 7 19:39:10 2020, Koji, Update, LSC, More high BW POY experiments 
Entry  Fri Jan 31 16:57:09 2020, gautam, Update, General, Metal PMC parts 
    Reply  Fri Feb 7 12:58:25 2020, Yehonathan, Update, General, Metal PMC parts 18x
Entry  Fri Feb 7 09:45:03 2020, shruti, Update, General, AM at X end 
Entry  Thu Feb 6 16:14:44 2020, rana, Update, General, office area temperature 
    Reply  Fri Feb 7 02:41:28 2020, Koji, Update, General, office area temperature 
Entry  Tue Feb 4 02:13:02 2020, gautam, Update, LSC, Locking updates modifiedOutMat.pngOLTFs.pdf
    Reply  Wed Feb 5 16:35:12 2020, gautam, Update, LSC, Diagnosis plan ALSnoise.pdf
       Reply  Thu Feb 6 01:16:58 2020, gautam, Update, LSC, Diagnosis results IMCspec_ALS.pdfIMCspec_ALS_smallSpan.pdf
    Reply  Thu Feb 6 01:25:50 2020, gautam, Update, LSC, Locking updates semiStableArms.pngarmAngStability.png
       Reply  Fri Feb 7 02:24:24 2020, gautam, Update, LSC, Some short notes 
Entry  Thu Feb 6 21:54:13 2020, Jon, Update, PSL, c1psl bench testing complete 
Entry  Tue Feb 4 18:13:01 2020, Yehonathan, Update, PSL, Bench testing of PSL ai channels c1psl_wire_testing_-_By_Connector.pdf
    Reply  Wed Feb 5 08:57:11 2020, Yehonathan, Update, PSL, Bench testing of PSL ai channels 
       Reply  Wed Feb 5 21:04:10 2020, Yehonathan, Update, PSL, Bench testing of PSL ai channels 
Entry  Mon Feb 3 15:22:39 2020, Jon, Update, PSL, c1psl progress/Acromag ADC grounding 
Entry  Fri Jan 31 16:04:30 2020, gautam, Update, IOO, Input pointing drift IPdrift.pdfIPdrift_PRMI.pdf
Entry  Wed Jan 29 12:29:33 2020, shruti, Update, General, delay line frequency discriminator for PM 20200128.pngIMG_BB01C068495A-1.jpeg
    Reply  Thu Jan 30 15:24:10 2020, ?, Update, General, delay line frequency discriminator for PM 
       Reply  Thu Jan 30 22:02:42 2020, shruti, Update, General, delay line frequency discriminator for PM Figure_2.png
Entry  Thu Jan 30 17:31:28 2020, Jon, Update, PSL, Errant FSS_INOFFSET change 
    Reply  Thu Jan 30 17:41:10 2020, gautam, Update, PSL, Errant FSS_INOFFSET change 
Entry  Thu Jan 30 12:52:10 2020, Jon, Update, BHD, Metal OMCs procured 
Entry  Wed Jan 29 03:05:47 2020, rana, gautam, Update, SUS, MC misalignments / sat box games IMG_8366.JPG
Entry  Wed Jan 29 00:29:43 2020, gautam, Update, LSC, locking 2020 PRFPMI_2020Jan.png
Entry  Wed Jan 29 00:27:13 2020, gautam, Update, Computer Scripts / Programs, mcup / mcdown modified 
Entry  Tue Dec 3 22:41:17 2019, shruti, Update, General, PLL for PM measurement  PM_measurement.jpeg
    Reply  Wed Dec 4 20:32:43 2019, gautam, Update, General, PLL for PM measurement  
    Reply  Mon Dec 9 21:22:46 2019, shruti, Update, General, PLL / PM measurement of Xend NPRO PZT 
       Reply  Tue Dec 17 20:08:09 2019, shruti, Update, General, PLL / PM measurement of Xend NPRO PZT 20191217.png
          Reply  Thu Jan 16 19:32:23 2020, shruti, Update, General, PLL / PM measurement of Xend NPRO PZT 
             Reply  Thu Jan 23 20:08:49 2020, shruti, Update, General, PLL / PM measurement of Xend NPRO PZT Image-1.jpg
                Reply  Tue Jan 28 19:40:15 2020, shruti, Update, General, PLL / PM measurement of Xend NPRO PZT PMTF.pdfBeatSpectrum.pdf
Entry  Tue Jan 28 19:12:30 2020, Jon, Configuration, PSL, Spare channels added to c1psl chassis c1psl_feedthrough_wiring_v2.pdf
Entry  Sun Dec 8 20:48:29 2019, rana, Configuration, Computers, Megatron: starts up grade 
    Reply  Wed Dec 11 22:01:24 2019, rana, Configuration, Computers, Megatron: starts up grade 
       Reply  Wed Jan 22 19:17:20 2020, gautam, Configuration, Computers, Megatron: starts up grade 
          Reply  Thu Jan 23 15:32:42 2020, gautam, Configuration, Computers, Megatron: starts up grade 
             Reply  Mon Jan 27 18:16:30 2020, gautam, Configuration, Computers, Sluggish megatron? 
                Reply  Tue Jan 28 15:39:04 2020, gautam, Configuration, Computers, Sluggish megatron? 
                   Reply  Tue Jan 28 17:36:45 2020, gautam, Configuration, Computers, Local EPICS7.0 installed on megatron 
Entry  Mon Jan 20 20:20:36 2020, gautam, Update, PSL, PMC servo checkout PMCsweep.pdfOLTFmeas.pdf
    Reply  Wed Jan 22 11:22:39 2020, gautam, Update, PSL, PMC modulation depth measurement modDepth.pdf
       Reply  Wed Jan 22 20:12:36 2020, gautam, Update, PSL, PMC demodulator electrical characterization demodChar.pdfmixerChar.pdf
          Reply  Thu Jan 23 14:37:05 2020, gautam, Update, PSL, PMC VGA chip damaged? VGAchar.pdf
             Reply  Thu Jan 23 16:37:14 2020, rana, Update, PSL, PMC VGA chip damaged? 
             Reply  Thu Jan 23 22:10:01 2020, gautam, Update, PSL, PMC servo pulled out 
                Reply  Fri Jan 24 15:42:08 2020, gautam, Update, PSL, PMC servo restored 
                   Reply  Sun Jan 26 13:47:00 2020, gautam, Update, PSL, PMC servo characterization elecTFs.pdfVGAchar_postFix.pdfVGAlinearity_postFix.pdfnewOLTFs.pdf
                      Reply  Tue Jan 28 14:33:24 2020, gautam, Update, PSL, Inferred free-running frequency noise inLoopNoise_IMClocked.pdffreqNoiseComparison.pdf
          Reply  Thu Jan 23 18:52:31 2020, gautam, Update, PSL, PMC RFPD characterization PDresp.pdf
Entry  Tue Jan 28 08:26:53 2020, rana, Frogs, PEM, shaking 
Entry  Mon Jan 27 14:01:01 2020, Jordan, Configuration, General, Repurposed Sorenson Power Supply  
Entry  Sun Jan 26 14:40:55 2020, gautam, Update, ALS, ALS OOL noise ALSnoise_20200126.pdf
Entry  Sun Jan 26 13:30:19 2020, gautam, Update, SUS, All watchdogs tripped, now restored EQ_Jan25.pdf
Entry  Fri Jan 17 18:02:21 2020, gautam, Update, ALS, Gain blocks packaged and characterized photos.pdfgain.pdfnoise.pdfmeasSchem.pdfzhl1010Data.zip
    Reply  Fri Jan 24 17:14:01 2020, gautam, Update, ALS, Gain blocks installed 
Entry  Thu Jan 23 23:07:04 2020, Jon, Configuration, PSL, c1psl breakout board wiring c1psl_feedthrough_wiring.pdf
Entry  Wed Jan 22 16:19:47 2020, Jon, Update, VAC, TP3 controller errors 
Entry  Mon Dec 9 19:19:04 2019, Yehonathan, Update, PSL, AOM first order beam alignment 20191209_193112.jpg20191209_193203_HDR.jpgimageedit_2_7551928142.gifimageedit_3_5863650538.gif
    Reply  Tue Dec 10 01:24:17 2019, Yehonathan, Update, PSL, AOM first order beam alignment 
       Reply  Tue Dec 10 13:26:46 2019, Yehonathan, Update, PSL, AOM first order beam alignment 
    Reply  Fri Jan 17 21:56:22 2020, Yehonathan, Update, PSL, AOM first order beam alignment 20200117_174841.jpg
       Reply  Wed Jan 22 11:00:21 2020, gautam, Update, PSL, PMC REFL ghost beam 
Entry  Mon Jan 20 15:11:20 2020, gautam, Update, PSL, PMCT photodiode grounding issue PMCT_anomaly.pdf
Entry  Mon Jan 20 12:16:50 2020, gautam, Update, PSL, PMC input reverted to AOM zeroth order beam IMG_8362.JPG
Entry  Wed Jan 15 16:54:51 2020, gautam, Update, General, PDA10CF removed from AS table 
Entry  Mon Jan 6 15:36:55 2020, Jon, Update, PSL, Assembly underway for c1psl upgrade 
    Reply  Mon Jan 6 16:07:12 2020, gautam, Update, PSL, Assembly underway for c1psl upgrade 
       Reply  Mon Jan 6 19:05:09 2020, not gautam, Update, PSL, Assembly underway for c1psl upgrade 
    Reply  Fri Jan 10 19:48:46 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 20200110_194429.jpg20200110_194516_HDR.jpg
       Reply  Mon Jan 13 16:05:18 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 
          Reply  Tue Jan 14 17:16:43 2020, yehonathan, Update, PSL, Assembly underway for c1psl upgrade 
             Reply  Wed Jan 15 10:12:46 2020, gautam, Update, PSL, Assembly underway for c1psl upgrade 
                Reply  Wed Jan 15 16:08:40 2020, not gautam, Update, PSL, Assembly underway for c1psl upgrade 
Entry  Wed Jan 15 14:10:28 2020, Jon, Configuration, PSL, New EPICS database for C1PSL + C1IOO 
Entry  Mon Jan 13 23:30:53 2020, Yehonathan, Summary, PSL, Changes made since Gautam left 
    Reply  Tue Jan 14 20:17:09 2020, gautam, Summary, General, IFO recovery DCerrors.png
       Reply  Wed Jan 15 10:04:19 2020, gautam, Summary, General, POX / POY locking restored singleArms.png
Entry  Mon Jan 13 15:47:37 2020, shruti, Configuration, Computer Scripts / Programs, c1psl burt restore 
Entry  Fri Jan 10 14:21:19 2020, Yehonathan, Update, PSL, c1psl reboot 
Entry  Tue Jan 7 18:51:51 2020, Jon, Update, PSL, New c1psl server assembled 
Entry  Mon Nov 4 19:02:25 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Sheet1_(1).pdf
    Reply  Tue Dec 17 00:23:28 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Sheet1_(2).pdf
       Reply  Tue Dec 17 18:05:06 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Sheet1_(3).pdf
          Reply  Fri Dec 20 18:33:21 2019, Yehonathan, Update, PSL, Mapping the PSL electronics PSL_Wirings_-_Channel_List.pdf
             Reply  Mon Dec 23 19:30:20 2019, Yehonathan, Update, PSL, Mapping the PSL electronics 
                Reply  Wed Jan 1 04:53:11 2020, gautam, Update, PSL, Mapping the PSL electronics 
                   Reply  Wed Jan 1 16:04:37 2020, Yehonathan, Update, PSL, Mapping the PSL electronics 
Entry  Wed Dec 11 15:01:57 2019, Jon, Summary, PSL, PMC cavity ringdown measurement IMG_0101.jpg
    Reply  Thu Dec 12 19:20:43 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement IMG_0105.jpegTEK00001.PNG20191212_151642.jpg
       Reply  Fri Dec 13 12:28:43 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement Ringdown_InitialProcess.pdf
          Reply  Tue Dec 17 20:45:30 2019, rana, Update, PSL, PMC cavity ringdown measurement 
          Reply  Fri Dec 27 15:01:02 2019, Yehonathan, Update, PSL, PMC cavity ringdown measurement PDAOMResponse.pdfPMCTransmission.pdfRingdownsAndRefs.pdfTwoExponentialFitAOM0.3V.pdf
             Reply  Tue Dec 31 03:03:02 2019, gautam, Update, PSL, PMC cavity ringdown measurement 
       Reply  Mon Dec 16 18:19:42 2019, shruti, Update, PSL, PMC cavity ringdown measurement : beat-note disruption IMG_0040.jpg
ELOG V3.1.3-