  8070   Tue Feb 12 20:42:36 2013 JamieUpdateAlignmentIFO alignment in prep for in-air PRMIYuta, Manasa, Jamie, Jenne, Steve, Rana
Starting this morning, we removed
the temporary half PRC mirror in front of
  
  8071   Tue Feb 12 20:57:47 2013 JenneUpdateAlignmentIFO alignment in prep for in-air PRMIWe should check MC spot positions to see
what they are. 
Also, I'm not thrilled about the
  
  8072   Tue Feb 12 23:22:14 2013 ManasaUpdateScatteringScattering setup 
 [Jan, Manasa]
We installed a camera at the ETMY
  
  8073   Tue Feb 12 23:24:17 2013 yutaUpdateAlignmentIFO alignment in prep for in-air PRMI[Manasa, Yuta]

Lot's of alignment work, 
  
  8075   Wed Feb 13 09:28:56 2013 SteveUpdateOpticsG&H - HR plots 
 Gooch & Housego optics
order specification from 03-13-2010
  
  8076   Wed Feb 13 14:21:19 2013 JenneUpdateLockingPRC cavity gains

    

       
            
  
  8077   Wed Feb 13 16:31:08 2013 JenneUpdatePSLPMC pitch input tuned, MC yaw input tuned[Jenne, Yuta]
I looked at PMCR camera on the MC1
tv, and tweaked up the beam going into the
 MCspots_13Feb2013.png 
  8081   Wed Feb 13 22:09:26 2013 JenneUpdateAlignmentREFL is not clippedWe need to calculate whether this level
of astigmatism is expected from the new active
TT mirrors, but 
  
  8083   Thu Feb 14 08:29:41 2013 SteveUpdateIOOlow MC1 OSEM voltageMC1 -  LR, LL, UL & UR  OSEMs
should be adjusted to get  1.2V
 Feb14_2013.png 
  8087   Fri Feb 15 09:58:49 2013 SteveUpdateGeneralbeam traps ready to be installedBlack-green glass traps are ready for light
in vacuum. I can assemble more if needed.
These three sizes are available.
 IMG_0083.JPGIMG_0084.JPG 
  8088   Fri Feb 15 15:21:07 2013 JamieUpdateComputersc1iscex IO-chassis deadI appears that the c1iscex IO-chassis is
either dead or in a very bad  state. 
The PCIe interface card in the IO-chassis
  
  8089   Fri Feb 15 16:09:19 2013 KojiUpdateGeneralbeam traps ready to be installedFor the hexagonal one, insert one of the
glass plate only half. Use a 1"x.5"
piece if exists.
 HexBeamDump.pdfDiamondBeamDump2in.pdf 
  8090   Fri Feb 15 17:11:13 2013 ChloeUpdate QPD circuit pictures I took better pictures of the circuits
of the QPD and spent a couple of hours with
a multimeter trying to figure out how all
 IMG_0337.JPGIMG_0338.JPG 
  8091   Fri Feb 15 20:07:28 2013 yutaUpdateAlignmentPOP path set up but AS55 is broken[Manasa, Yuta]

We set up POP camera and POPDC PD,
  
  8092   Fri Feb 15 21:22:29 2013 yutaUpdateElectronicsAS55 replaced with POP55 PDI temporarily replaced AS55 PD with PD
labeled "POP55(POY55)".
I think POP55 is working because I
  
  8093   Sat Feb 16 17:27:26 2013 yutaUpdateSUSPRM coil balancedPRM coil gains and f2a filters are adjusted
for PRMI work.
It seems like 
 PRM_f2a.png 
  8095   Sat Feb 16 19:23:17 2013 yutaUpdateLSCPR2 flipped PRMI lockedIt is my pleasure to announce that the
first lock of PR2 flipped PRMI was succeeded.
  
  8096   Sun Feb 17 19:27:19 2013 ranaUpdateSUSPRM coil balanced I will check out the AS55 situation
tomorrow. Just put it on my desk.
MC Autolocker was disabled
  
  8097   Mon Feb 18 00:03:46 2013 ZachUpdateComputer Scripts / ProgramsARBCAV v3.0I have uploaded ARBCAV v3.0 to the SVN.   
  8098   Mon Feb 18 11:54:15 2013 Max HortonUpdateSummary PagesTiming Issues and CalendarsCrontab: The bug of data only plotting
until 5PM is being investigated.  The
crontab's final call to the summary page
  
  8100   Mon Feb 18 21:43:05 2013 KojiUpdateAlignmentPOP path set up but AS55 is brokenI undertook the investigation of the AS55
PD.
I found the PD is not broken.
 AS55.pdf 
  8101   Mon Feb 18 23:41:15 2013 SendhilUpdateAlignmentAligned IPPOS, IPANG and OPLEVS[Yuta, Sendhil]
We aligned IPPOS, IPANG and all OPLEVs
(except for ETMX and SRM).
 IPANGIPPOSoplevs.png 
  8102   Tue Feb 19 00:21:09 2013 yutaUpdateElectronicsPOP path set up but AS55 is brokenHmm......  
I thought AS55 is broken because it
was not responding to the AS beam nor flashlight
  
  8104   Tue Feb 19 05:42:28 2013 KojiUpdateElectronicsPOP path set up but AS55 is broken10010 Ohm for POP55 vs 50 Ohm for AS55
(cf. http://nodus.ligo.caltech.edu:8080/40m/4763)
I
  
  8105   Tue Feb 19 08:06:02 2013 yutaUpdateElectronicsPOP path set up but AS55 is brokenI didn't use LED flash light. We learned
from the past (elog
#7355). I checked that POP55 and REFL55/165/33/11
  
  8106   Tue Feb 19 08:42:31 2013 KojiUpdateVACETMX door open[Steve, Yuta, Koji]
The ETMX heavy door was removed.
  
  8107   Tue Feb 19 09:37:23 2013 SteveUpdateIOOlow MC1 OSEM voltage 
    See TT DB25 pin swapping  
elog#7869 
 MC1_MC3.pngMC1_MC3_.png 
  8108   Tue Feb 19 12:02:00 2013 JamieUpdateIOOIMC table levelling.In order to address the issue of low MC1
OSEM voltages, Yuta and I looked at the IMC
table levelling.  Looking with the bubble
 Screenshot-Untitled_Window.png 
  8109   Tue Feb 19 15:10:02 2013 JamieUpdateCDSc1iscex alive againc1iscex is back up.  It is communicating
with it's IO chassis, and all of it's models
(c1x01, c1scx, c1spx) are running again.
  
  8110   Tue Feb 19 15:40:34 2013 CharlesUpdateISSISS PrototypeAfter spending a good deal of time learning
how to use the SR785, I was able to characterize
my prototype circuit. The transfer function
 Prototype_Transfer_Function.pngTheoretical_Transfer_Function.png 
  8111   Tue Feb 19 17:14:56 2013 ChloeUpdate QPD CircuitI finished working out the circuit and
figured out where the broken connections
were. This is diagrammed in my notebook (will
  
  8112   Tue Feb 19 19:55:52 2013 yutaUpdateIOOMC yaw input tuned[Jenne, Manasa, Yuta]

Since we levelled IMC stack, we had
 MCdecenter_19Feb2013.png 
  8113   Wed Feb 20 01:40:37 2013 ManasaUpdateAlignmentFinal IFO alignment- in progress[Yuta, Sendhil, Jamie, Jenne, Rana]

1. After the MC centering, we tried
  
  8114   Wed Feb 20 03:13:10 2013 yutaUpdateAlignmentclipping centering checklistI attached clipping/centering checklist
for the alignment.
Blue
 ClippingCenteringChecklist.pdf 
  8115   Wed Feb 20 10:13:41 2013 yutaUpdateAlignmentPRC flashing brighter than last weekAfter in-vac alignment work last night,
PRC is flashing brighter than PRMI alignment
last week.
  
  8116   Wed Feb 20 18:35:42 2013 JenneUpdateAlignmentNew in-vac alignment procedureI have updated the vacuum checklist for
in vacuum alignment.  Please take a
look (https://wiki-40m.ligo.caltech.edu/vent/checklist)
  
  8117   Wed Feb 20 18:53:48 2013 JenneUpdateAlignmentIFO ready for doors, then pumping[Yuta, Manasa, Sendhil, Jenne, Steve, Jamie,
Koji, Evan]
  
  8118   Wed Feb 20 19:20:50 2013 EvanUpdateAlignmentAS camera alignment[Manasa, Evan]
Manasa and I are trying to get the
AS beam onto the AS camera with a focusing
  
  8119   Wed Feb 20 19:48:16 2013 yutaUpdateAlignmentBS table oplev re-arranged[Sendhil, Yuta]

After aligning IFO and putting the
 IFOALIGN_QPDs_OSEMs.png 
  8120   Wed Feb 20 19:58:59 2013 ranaUpdateAlignmentBS table oplev re-arrangedPlease confirm the SRM OL beam is not too
bad and also find where the mis-aligned SRM
puts its beam. WE want to be sure that there
  
  8121   Wed Feb 20 20:15:29 2013 yutaUpdateAlignmentSRM oplev statusCurrently, SRM is misaligned in pitch so
that SRM reflected beam hits on the top edge
of SR3 (not on the mirror, but on the cage
  
  8122   Wed Feb 20 20:58:37 2013 yutaUpdateAlignmentclipping centering checklistBlue
ones are the ones we checked yesterday.
Green
 ClippingCenteringChecklist.pdf 
  8123   Wed Feb 20 21:12:37 2013 ranaUpdateAlignmentclipping centering checklist 
 Is the beam going towards the
OMC going to cause backscatter because of
  
  8124   Wed Feb 20 21:56:08 2013 yutaUpdateAlignmentclipping centering checklistI'm not sure about the OMC situation at
40m. I think there are no direct beam reflected
back into IFO from OMC path. There must be
  
  8126   Thu Feb 21 12:56:38 2013 JenneUpdateCDSc1iscex dead againc1iscex is dead again.  Red lights,
no "breathing" on the FE status
screen.
  
  8127   Thu Feb 21 13:34:35 2013 JenneUpdateTreasureIR card removed

    

       
            
  
  8128   Thu Feb 21 14:32:02 2013 JamieUpdateCDSc1iscex models restarted

    

       
            
  
  8129   Thu Feb 21 15:21:07 2013 yutaUpdateVACall heavy doors on, started pumping down annulus[Steve, Manasa, Jenne, Sendhil, Evan,
Yuta]
  
  8130   Thu Feb 21 16:53:37 2013 ManasaUpdatePSLPSL shutter[Steve, Jenne, Yuta, Manasa]
We have kept the laser ON at low
power through the pump down process. As we
  
  8131   Thu Feb 21 18:01:27 2013 SteveUpdateVACpumpdown at 230 Torr 
 We are pumping down with RP1
& RP3 oily roughing pumps at 3 Torr/min
  